Norris's RV Construction
RV10
10 Miscellaneous
Work Logs Found:
23
Category Work Time:
116 Hours
Date
Hours
Work Log Summary
Details
05-23-2022
4.00
Final prep for airworthiness inspection
05-22-2022
5.00
airworthiness inspection prep
05-20-2022
8.00
Getting final items ready for inspection
Details
05-19-2022
5.00
Repaired fuel leak around L fuel quantity sender.
05-19-2022
2.00
Installed fire extinguisher on rear of center cons
05-18-2022
5.00
Configuring G3x. Sealing fuel leak.
05-16-2022
4.00
Gathering and loading data into the FFA
05-12-2022
6.00
Reassemble interior. Balance prop and fuel map
05-11-2022
6.00
Found a leaking fuel fitting and replaced it.
05-03-2022
4.00
Weigh airplane and check w&b
04-26-2022
8.00
inspection by Phil. Install sun visors. Prop bal b
04-25-2022
6.00
04-22-2022
3.50
making and testing stands to level airplane
03-04-2022
4.00
Fix the Brake fluid charging tool
02-22-2022
9.00
Install labels and N Number. Started installing e
07-22-2021
5.00
Lots of small jobs
06-18-2021
2.00
Finished the passenger boarding ladder
06-17-2021
8.00
Continued designing and making entry steps
06-16-2021
6.00
Designing and building an entering step stool
06-14-2021
7.00
Cleaning and finished setting up the rotisery
06-07-2021
2.00
Got the rotiserry set up ready to accept the fusle
06-04-2021
2.00
Making painting rotessiary for fuselage
01-25-2021
4.00
Installed fuel selector extender
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home
Copyright © 2001-2024 Matronics. All Rights Reserved.