RV-8
Fuselage
Work Logs Found:
57
Category Work Time:
224 Hours
Date
Hours
Work Log Summary
Details
08-17-2020
2.00
Canopy Trimming
08-13-2020
2.00
Canopy Slider Jig
08-13-2020
5.00
Canopy Big Cut
08-09-2020
3.00
Canopy trimming
08-06-2020
3.00
Canopy Slid Block
08-05-2020
2.00
Canopy Frame Rear Bow
08-04-2020
8.00
Canopy rails, slide block & anchor block
08-01-2020
1.00
Tank attach bracket 1/4" slot and nut plate
08-01-2020
2.00
Installed Aft Flooring with LP4-3 pop rivets
07-19-2020
8.00
Installing canopy slide cap and fabricating side r
07-07-2020
2.00
Installed Flap Fairings
07-06-2020
1.00
Completed aileron trim control installation
07-06-2020
1.00
Aft Throttle Quandrant
07-05-2020
0.50
Fuel Tank Line Fittings
07-03-2020
3.00
Installed fuel tank brackets and working on wing r
06-23-2020
16.00
Rear Seat Throttle Installation
06-17-2020
2.00
Tank attach bracket fabrication
06-17-2020
5.00
Heater knob and bowden cable installation
06-15-2020
2.00
Install Dynon Temperature Probe
06-11-2020
5.00
Cut out instrument sub-panel. Anodized sub-panel.
Details
06-10-2020
4.00
Baggage Door Lock
06-09-2020
10.00
OP-6 Manual Aileron Trim System
06-08-2020
5.00
Tie-down holders
06-07-2020
8.00
Fabricating baggage door
06-06-2020
3.00
Installed 2 AWG Starting Wire & 8 AWG Master Switc
05-30-2020
3.00
Throttle Quantrant Installation
05-30-2020
2.00
Heater Box installed on Firewall
05-26-2020
2.00
Installed wiring from elevator autopilot servo to
05-22-2020
3.00
Elevator Pitch Trim Servo Wiring
Details
05-22-2020
3.00
ADHRS Mount
05-21-2020
4.00
Dynon Static Ports Installation
Details
05-20-2020
4.00
Fueslage NACA Vent Installation
05-19-2020
3.00
Roll bar installed
05-19-2020
6.00
Forward upper skin match-drilled
05-08-2020
6.00
Installed fuel pump and plumbing to righ and left
05-07-2020
2.00
Forming edge of top aft skin & debur/dimpling
05-07-2020
4.00
Dimple and rivet top aft bulkheads
05-06-2020
1.00
Fuselage Conduit
Details
05-06-2020
2.00
Fuel valve fittings installed. Aft battery tray.
05-05-2020
2.00
Debur and paint bulkhead assemblies
05-03-2020
4.00
Final-drill Aft fuselage bulkheads and Aft top ski
05-02-2020
4.00
Installed fuel vent lines
05-01-2020
2.00
Install fuel pump
04-30-2020
4.00
Dynon Pitch Installation Guide RV8 Pitch
04-25-2020
4.00
Recieved new elevator F-840 Pushrod
04-24-2020
7.00
Installed rudder cables. Begin assembling rudder p
04-19-2020
8.00
Elevator Control System
04-18-2020
4.00
Painted interior of fuselage & interior panels
04-17-2020
4.00
Painted interior of fuselage & interior panels
04-14-2020
2.00
Interior panels prepping for painting
04-11-2020
6.00
Foot well recess and throttle quandrant cable anch
04-09-2020
3.00
Alodine stiffeners and rivet to seat floors
04-08-2020
6.00
Seat Floors & Flap Bearing Blocks
04-05-2020
4.00
Pilots seat back
04-04-2020
5.00
Fitting landing gear
04-03-2020
3.00
Fitting landing gear
04-02-2020
3.00
Drilling Gear Leg Brackets
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
173
573
Avionics
1
4
Empennage
64
192
Engine
1
3
Fuselage
57
224
Miscellaneous
1
0
None
7
28
Wings
42
122