Powered By Kitlog Pro v2.0
Brians Web Site
RV-8
Wings
Work Logs Found:
42
Category Work Time:
122 Hours
Date
Hours
Work Log Summary
Details
08-01-2020
2.00
Aileron Stops
07-31-2020
6.00
Wing root fairing hardware installation
07-30-2020
4.00
Fuel Tank Cover Sealing/Installation
07-02-2020
2.00
Rigging Ailerons with Differential Aileron Jig
Details
07-02-2020
2.00
Alodine Flap Pushrods
06-30-2020
3.00
FWD Wing Root Fairings
06-29-2020
4.00
Install Aft Wing Root Fairings
06-28-2020
6.00
Rigged/Trim Flaps
06-27-2020
2.00
Tank Brackets
06-27-2020
2.00
Fuel Vent Lines
06-26-2020
2.00
Set Wing Incidence/Sweep
06-26-2020
3.00
Set Wing Incidence/Sweep
Details
06-26-2020
1.00
Drill Aft Spar
06-25-2020
0.50
Testing fuel level senders
06-25-2020
2.00
Installing Wings
Details
06-25-2020
6.00
Fuel line pickup tubes and fuel level senders inst
06-18-2020
2.50
Installed NACA Vent in wing for passenger vent
03-28-2020
8.00
Left & Right Flap Installation
03-24-2020
8.00
Installing Left & Right Lower Wing Panels
Details
03-19-2020
2.00
Left Aileron rigging
03-16-2020
5.00
OP-46: Stall Warning System
03-14-2020
3.00
Installed Nav/Pos & Landing/Taxi Light wiring
Details
03-14-2020
3.00
Dynon Pitot Mast Installation
03-13-2020
4.00
Install Dynon Roll Servo Wiring
Details
03-08-2020
4.00
Dynon Roll Servo Installation
03-06-2020
4.00
Installed Flap brace and Aileron Gap Fairing
03-05-2020
4.00
Installed 3/4" electrical conduit in both wings.
01-12-2020
4.00
Deburr, dimpling lower wing skins, aileron gap fai
Details
01-12-2020
3.00
Deburr and dimple lower skins & access panels. Ins
Details
01-11-2020
3.00
Up-drill lower wing skins. Up-drill aileron gap fa
Details
01-11-2020
0.01
Quickbuild Flaps
01-11-2020
0.01
Quickbuild Ailerons
01-11-2020
0.50
Install right aileron brackets
Details
01-11-2020
0.50
Install left aileron brackets
Details
01-10-2020
1.00
Serevice Bulletin 16-03-28 Inboard aileron hinge b
Details
01-10-2020
1.00
Installed Right Aileron Torque Tubes/Bellcranks
Details
01-10-2020
1.00
Installed Left Aileron Torque Tubes/Bellcranks
Details
01-10-2020
1.00
Installed aileron hinges
01-05-2020
3.00
Install aileron hinges
01-04-2020
3.50
Serevice Bulletin 16-03-28 Inboard aileron hinge b
Details
01-03-2020
3.50
Sort hardware. Prime & assemble aileron pushrods.
01-01-2020
2.00
Place right wing on bench begin working on aileron
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
173
573
Avionics
1
4
Empennage
64
192
Engine
1
3
Fuselage
57
224
Miscellaneous
1
0
None
7
28
Wings
42
122
Copyright © 2001-2024 Matronics. All Rights Reserved.