Powered By Kitlog Pro v2.0
Brians Web Site
RV-8
Empennage
Work Logs Found:
64
Category Work Time:
192 Hours
Date
Hours
Work Log Summary
Details
07-10-2020
0.50
VHF Coms antenna Installation
07-10-2020
0.50
ADS-B In/Out Antenna Installation
07-10-2020
4.00
ADS-B In antenna Installation
07-09-2020
2.00
Interior Flooring Installation
07-08-2020
6.00
Installed screws, washers and nuts in gear tower s
07-01-2020
3.00
Flap Fairing
06-15-2020
4.00
Top Aft Skin Installation (Turtle Deck)
Details
06-14-2020
3.00
Install ADAHRS and secure tubing/wires
05-26-2020
1.00
Installed upgraded brake reservior plumbing
05-24-2020
2.00
Ran wire to tail light
05-24-2020
0.50
Elevator Trim Wiring
Details
05-24-2020
4.00
Elevator Trim Rigging
05-23-2020
4.00
Elevator Trim Wiring
04-23-2020
3.00
Installed Flap Motor. Begin
04-23-2020
4.00
Elevator Stop Adjustment
Details
04-22-2020
6.00
Install Rudder
Details
04-16-2020
3.00
Elevator pushrod
04-16-2020
2.00
Drilling Elevator Horns
04-15-2020
4.00
Vertical Stabilizer Installation
04-14-2020
0.50
Vertical Stabilizer Installation
04-14-2020
1.00
Vertical Stabilizer Installation
04-14-2020
2.00
Vertical Stabilizer Installation
04-13-2020
0.50
Horizontal Stabilizer Installation
04-13-2020
4.00
Horizontal Stabilizer Installation
11-17-2019
2.00
Rigging Elevators to Horz Stabilizer
11-17-2019
1.00
Rigging Elevators to Horz Stabilizer
11-16-2019
2.50
Elevator (Left) Trim tab servo
11-16-2019
3.00
Elevator (Left) Rolling leading edge
11-15-2019
3.00
Elevator (Right) Rolling the leading edge
11-14-2019
4.00
Elevator (Left) Fitting trim tab
11-14-2019
4.00
Elevator (Left) Fitting trim tab
11-13-2019
3.00
Elevator (Left) Rivet under-structure
11-13-2019
2.00
Elevator (Left) Pitch Trim bend & rivet spar reinf
11-13-2019
2.00
Elevator (Left) Bend tabs on trim tab
11-12-2019
1.00
Elevator (Left) Up-drill & prime
11-12-2019
3.00
Elevator (Left) Pitch Trim
11-11-2019
2.00
Elevator (Left)
11-10-2019
1.00
Elevator (Right) Rivet spare & reinf plates
11-10-2019
1.50
Elevator (Right) Prime and rivet spar
11-10-2019
0.10
Elevator (Right) Completed closing skin
11-10-2019
5.00
Elevator (Right) Closing skin & installed horn
11-09-2019
1.00
Elevator (Right) Up drill skin to understructure
11-09-2019
3.00
Elevator (Right) Bend T/E & inst counter weight
11-09-2019
1.00
Elevator (Left) Dimple, prime and back-rivet stiff
11-08-2019
3.00
Elevator (Right) Dimple, prime and back-rivet stif
09-22-2019
7.00
Horizontal Stab, closed skin (completed)
09-22-2019
3.50
Elevator (Right) Dimple and back-rivet stiffeners
09-19-2019
4.00
Horizontal Stab Prime parts & begin riveting under
09-19-2019
5.00
Horizontal Stab Install understructure with rear s
09-17-2019
5.00
Horizontal Stab assembling forward spare and ribs
09-16-2019
1.00
Horizontal Stab bend spar reinforcment plate to 6
09-15-2019
3.00
Horizontal stabilizer assemble rear spar and up-dr
09-13-2019
1.00
Rudder
09-13-2019
4.00
Rudder
09-13-2019
4.00
Rudder
09-13-2019
2.00
Rudder
09-12-2019
12.00
Rudder
09-11-2019
10.00
Rudder
09-10-2019
6.00
Vertical Stabilizer
09-10-2019
2.00
Vertical Stabilizer
09-08-2019
4.00
Vertical Stabilizer
09-08-2019
2.00
Vertical Stabilizer
09-08-2019
1.00
Vertical Stabilizer
09-08-2019
3.00
Vertical Stabilizer
SITE NAVIGATION
RV-8 Home
Category
# Logs
# Hours
All
173
573
Avionics
1
4
Empennage
64
192
Engine
1
3
Fuselage
57
224
Miscellaneous
1
0
None
7
28
Wings
42
122