
|

|
|

|
Davids Web Site
Work
Logs
Found:
30
|
Category Work Time: 77 Hours
|
Date
|
Hours
|
Work Log Summary

|
Details

|
09-26-2021
|
3.00
|
Brian Hoover drops out to assist with engine issue
|
|
|
|
09-19-2021
|
3.00
|
Add fuel, engine start
|
|
|
|
06-27-2021
|
4.00
|
Add oil, turn engine over,
|
|
|
|
06-26-2021
|
1.50
|
Set timing
|
|
|
|
01-17-2021
|
3.50
|
Finish engine wiring
|
|
|
|
01-13-2021
|
2.00
|
Wiring firewall foreward,
|
|
|
|
01-10-2021
|
4.50
|
Wiring firewall foreward, e mags
|
|
|
|
10-11-2020
|
2.00
|
Finish control cables
|
|
|
|
10-04-2020
|
1.50
|
Install control cables,
|
|
|
|
09-30-2020
|
1.50
|
Airflow induction bracket, order brake lines
|
|
 |
|
08-30-2020
|
3.00
|
Controls panel mount bracket, avionic planning
|
|
 |
|
08-29-2020
|
3.00
|
Sniffle valve,oil cooler, avionics planning
|
|
|
|
08-16-2020
|
3.50
|
Install exhaust
|
|
|
|
08-12-2020
|
2.00
|
Baffles
|
|
|
|
08-09-2020
|
3.00
|
Alt air door install, on snorkel
|
|
|
|
07-26-2020
|
2.00
|
Flox snorkle to air filter frame
|
|
|
|
07-19-2020
|
4.00
|
Wiring, snorkel test fit
|
|
|
|
07-11-2020
|
3.00
|
Tension rods, baffles
|
|
  |
|
07-08-2020
|
2.00
|
Engine baffles
|
|
|
|
07-05-2020
|
3.00
|
Right forward baffle, air filter frame
|
|
|
|
06-23-2020
|
2.00
|
Sealant baffles, air filter frame
|
|
|
|
06-10-2020
|
2.00
|
Torque prop, cylinder baffles
|
Details
|
|
|
06-03-2020
|
2.00
|
Start on engine baffles
|
|
|
|
05-17-2020
|
3.50
|
Engine prep, alternator
|
|
|
|
05-13-2020
|
2.50
|
Engine prep fuel system
|
|
|
|
05-06-2020
|
2.00
|
Hang engine
|
|
|
|
05-03-2020
|
3.00
|
Engine prep, prop governer install
|
|
 |
|
04-25-2020
|
2.00
|
Install master relay and starter solenoid
|
|
|
|
04-22-2020
|
1.00
|
Battery install
|
|
 |
|
03-12-2020
|
2.00
|
Engine arrives
|
|
|
|

|

|

|
|

|

|
Copyright © 2001-2025 Matronics. All Rights Reserved. |