Powered By Kitlog Pro v2.0
N983LK
RV-8
Fuselage
Work Logs Found:
427
Category Work Time:
1522 Hours
Date
Hours
Work Log Summary
Details
09-16-2023
0.00
Aft baggage tiedown rings
Details
04-14-2023
0.00
Modified forward baggage floor part 4
Details
04-13-2023
0.00
Modified forward baggage floor part 3
Details
03-26-2023
0.00
Modified forward baggage floor part 3
Details
03-18-2023
0.00
Modified forward baggage floor part 2
Details
02-26-2023
0.00
Modified forward baggage floor
Details
08-02-2022
8.00
More cockpit storage
Details
07-17-2022
2.00
Fire extinguisher mount
Details
03-06-2022
1.50
Fuel sampler
Details
03-04-2022
5.00
Cockpit storage panel - LH side
Details
02-27-2022
5.00
Cockpit storage panel - RH side
Details
12-22-2021
1.50
Finishing up wheel pant repair
Details
12-21-2021
1.00
Wheel pant repair continued
Details
12-20-2021
2.00
Wheel pant repair continued and fuel dip stick
Details
12-18-2021
0.50
Wheel pant repair.
Details
11-13-2021
3.50
Fuel level calibration
Details
10-26-2021
2.00
Upper intersection fairings continued
Details
10-25-2021
3.00
Upper intersection fairings
Details
10-24-2021
4.00
Refilled brake system
Details
10-23-2021
5.00
R&R brake line fittings on langing gear legs
Details
10-20-2021
2.00
Lower empenage fairings part 2
Details
10-17-2021
5.00
Prep for landing gear removal
Details
10-15-2021
6.00
Wing root fairings and upper intersection fairings
Details
10-14-2021
25.00
More misc tasks
Details
10-09-2021
4.00
Seats and harnesses
Details
10-08-2021
2.50
Rear seat harness
Details
10-05-2021
1.50
RH wing tip aft end re-bonding
Details
10-04-2021
2.00
LH wing tip trailing edge re-bond
Details
10-03-2021
4.00
Brake fluid and ELT test
Details
10-02-2021
4.00
Various tasks
Details
10-01-2021
5.00
Misc tasks again
Details
09-29-2021
3.00
Rear baggage floor and Autopilot calibration
Details
09-28-2021
3.00
Flap fairing rivets and gear tower covers
Details
09-27-2021
2.50
Forward fuselage floor
Details
09-26-2021
7.00
More misc tasks
Details
09-17-2021
8.00
Misc tasks
Details
09-16-2021
3.00
Roll servo wiring and fuel sensor wiring
Details
09-15-2021
3.50
Pitot heat and stall warning wiring
Details
09-13-2021
4.00
Misc final assembly tasks
Details
09-11-2021
3.50
Wings on for good
Details
09-10-2021
5.00
Wing root tasks
Details
09-06-2021
2.50
Wings back off
Details
09-05-2021
5.50
Wing tips and flap fairing work.
Details
09-04-2021
5.00
Flap fairings and wing tip trimming
Details
08-31-2021
3.00
Wing root fairings
Details
08-30-2021
3.00
Flap alignment part 2
Details
08-29-2021
6.00
Aileron and flap installation and adjustment
Details
08-28-2021
7.00
Misc wing attachment tasks
Details
08-25-2021
3.00
Wing alignment part 4
Details
08-22-2021
3.00
Wing alignment part 3
Details
08-21-2021
6.00
Wing alignment part 2
Details
08-20-2021
4.00
Fuel tank attach brackets and wing alignment part
Details
08-17-2021
2.00
Misc tasks
Details
08-15-2021
6.50
Wings on!
Details
08-14-2021
5.00
Prep for wing installation
Details
07-17-2021
2.00
Wheel fairings part 23
Details
07-16-2021
3.00
Wheel fairings part 22
Details
07-15-2021
4.00
Wheel fairings part 21
Details
07-14-2021
4.00
Wheel fairings part 20
Details
07-13-2021
4.00
Wheel fairings part 19
Details
07-12-2021
4.00
Wheel fairings part 18
Details
07-11-2021
2.00
Wheel fairings part 17
Details
07-10-2021
3.00
Wheel fairings part 16
Details
07-09-2021
3.00
Wheel fairings part 15
Details
07-08-2021
2.00
Wheel fairings part 14
Details
07-07-2021
2.00
Wheel fairings part 13
Details
07-06-2021
3.00
Wheel fairings part 12
Details
06-07-2021
2.00
Lower intersection fairings part 3
Details
06-06-2021
2.00
Lower intersection fairings part 2
Details
06-05-2021
3.00
Lower intersection fairings part 1
Details
11-23-2020
1.50
Wheel fairings part 11
Details
11-22-2020
2.00
Wheel fairings part 10
Details
11-21-2020
2.00
Wheel fairings part 9
Details
11-20-2020
1.50
Wheel fairings part 8
Details
11-18-2020
1.00
Wheel alignment adjustment again
Details
11-15-2020
2.00
Wheel fairings part 7
Details
11-14-2020
1.00
Wheel fairings part 6
Details
11-13-2020
6.00
Wheel fairings part 5
Details
11-12-2020
2.50
Wheel fairings part 4
Details
11-11-2020
4.00
Wheel fairings part 3
Details
11-09-2020
1.00
Wheel fairings part 2
Details
11-08-2020
2.50
Wheel Fairings part 1
Details
11-07-2020
3.00
More wheel alignment
Details
11-06-2020
1.50
Wheel alignment correction
Details
11-05-2020
1.00
Sealed top edge of firewall
Details
10-30-2020
3.00
Fuselage Roll Out
Details
10-29-2020
2.00
Wheels, brakes and tires
Details
10-28-2020
2.00
Landing gear toe-in check
Details
10-26-2020
4.00
Landing gear fit up
Details
10-24-2020
2.50
Landing Gear Legs back on
Details
10-23-2020
4.00
Windscreen unveiling
Details
10-20-2020
2.00
Prep for landing gear installation
Details
10-19-2020
1.00
Priming windscreen fairing
Details
10-17-2020
2.00
Sanding the micro on the windscreen
Details
10-16-2020
6.00
Windscreen final shaping
Details
09-08-2020
2.00
SL-00014
Details
09-05-2020
2.00
More work on the forward end of the canopy
Details
09-04-2020
8.00
Canopy final riveting and wheels/tires
Details
09-02-2020
4.00
Fwd baggage door hinge support closeout angle
Details
09-01-2020
3.00
Glareshield edge trim
Details
08-31-2020
4.00
Reinstalled avionics and cut hole for drink holder
Details
08-30-2020
4.00
Baggage door tweeking
Details
08-29-2020
5.00
Baggage door complete
Details
08-28-2020
4.00
Baggage door skin riveting
Details
08-27-2020
5.00
Baggage door support
Details
08-27-2020
3.00
Baggage door lock arm
Details
08-26-2020
4.00
Skirt priming and some other stuff
Details
08-19-2020
2.00
Still more sanding of windscreen lower fairing
Details
08-18-2020
1.50
More sanding of the windscreen lower fairing
Details
08-17-2020
2.50
Windshield fairing lower fairing sanding
Details
08-16-2020
3.00
Laying up wind screen forward bottom fairing
Details
08-13-2020
2.00
Windscreen fillet part 2
Details
08-12-2020
4.00
Windscreen fillet
Details
08-11-2020
3.00
Prep for windscreen fairing layup
Details
08-10-2020
1.00
Completed riveting forward top skin
Details
08-09-2020
6.00
Wind screen fairing part 2
Details
08-08-2020
6.00
Windscreen screws
Details
08-07-2020
8.00
Baggage door
Details
08-06-2020
4.00
More forward top skin work
Details
08-05-2020
4.00
Riveting forward top skin
Details
08-04-2020
3.50
Passenger warnings and landing gear bolts
Details
08-03-2020
5.00
Misc tasks
Details
08-02-2020
4.50
Replacement fuel lines
Details
08-01-2020
4.00
Misc work
Details
07-31-2020
5.00
Landing gear brackets etc
Details
07-30-2020
6.00
Landing gear bolt retainer clips
Details
07-22-2020
5.00
Throttle quadrant
Details
07-21-2020
3.00
Engine linkages at throttle quadrant
Details
07-16-2020
1.50
Primered landing gear and misc rudder pedal work
Details
07-15-2020
2.00
Landing gear legs - prep for primer
Details
07-12-2020
4.00
Alternate air cable and SV amps hookup
Details
07-11-2020
3.00
Cabin heat cabin installation
Details
07-10-2020
4.00
Cabin heat and alternate air bracket paint and lab
Details
07-09-2020
4.00
Heater cable
Details
07-08-2020
4.00
More cable bracket work
Details
06-10-2020
6.00
Primary power wiring
Details
06-02-2019
2.50
Forward baggage floor paint and retainer clips for
Details
05-12-2019
4.00
More interior painting and ram mount base installa
Details
05-04-2019
1.50
Rear baggage compartment components
Details
05-03-2019
3.00
Painted misc parts
Details
05-01-2019
2.50
Misc work
Details
04-28-2019
6.00
Finished battery and ELT access door mods
Details
04-27-2019
4.50
ELT access door part 3
Details
04-24-2019
3.00
ELT access door part 2
Details
04-19-2019
1.50
ELT access hatch part 1
Details
04-15-2019
2.50
Battery access door part 4
Details
04-14-2019
2.50
Battery access door part 3
Details
04-13-2019
6.00
Battery access door part 2
Details
04-10-2019
2.50
Battery access door part 1
Details
03-17-2019
4.00
Started baggage door
Details
03-16-2019
2.00
Upper forward skin substructure
Details
03-15-2019
4.00
Forward upper fuselage skin
Details
03-13-2019
2.50
Misc
Details
03-06-2019
2.00
Primed panel and deburred aft cabin covers
Details
08-26-2018
4.00
Mounting the ELT audio alerter
Details
08-17-2018
1.50
Sub-panel painting part 1
Details
07-29-2018
2.50
Brackets for adel clamps
Details
06-16-2018
2.50
Avionics shelves
Details
05-22-2018
2.50
LH Com 1 antenna doubler riveting
Details
05-06-2018
4.00
More underfloor wiring
Details
04-15-2018
2.00
LH com antenna doubler/stiffener
Details
04-14-2018
4.00
LH antenna doubler and harness bracket
Details
04-08-2018
4.00
Pitot-static line securing
Details
04-05-2018
2.00
Pitot/static tube and wire guide
Details
03-23-2018
4.00
Front seat vents
Details
03-12-2018
1.70
LH replacement brakeline
Details
03-11-2018
4.00
Brakeline redo number three
Details
03-03-2018
3.00
Reprimed lower switch panel and installed power c
Details
02-21-2018
2.00
Misc stuff
Details
02-03-2018
5.00
Replacement pilot's stick etc
Details
01-28-2018
5.00
Pilot's USB charge port
Details
01-27-2018
5.00
Seat mockup and lower switch console
Details
01-24-2018
2.50
Front stick grip mounting
Details
01-17-2018
2.00
More stick grip work
Details
01-13-2018
4.00
Stick and stick grip
Details
01-07-2018
4.00
Misc work
Details
01-06-2018
6.00
Aileron trim
Details
01-03-2018
1.50
Completed tailcone riveting
Details
12-30-2017
4.00
Finished installing equipment in aft avionics bay
Details
12-29-2017
7.00
Re-populating aft fuselage avionics bay
Details
12-28-2017
7.00
Riveting aft upper tailcone skin
Details
12-17-2017
3.50
Temporary aft fuselage floors
Details
12-13-2017
3.00
Removable floor mod part 8
Details
12-10-2017
7.00
Removable floor mod part 7
Details
12-09-2017
7.00
Removable floor mod part 6
Details
12-08-2017
3.00
Removable floor mod part 5
Details
12-06-2017
3.00
Removable floor mod part 4
Details
12-05-2017
2.50
Removable floor mod part 3
Details
12-03-2017
6.00
Removable floor mod part 2
Details
12-02-2017
8.00
Started removable floor mod
Details
11-22-2017
3.00
Com antenna mounting holes
Details
11-21-2017
5.50
Flap motor wire routing and comm antenna doublers
Details
09-19-2017
1.00
Throttle quadrant support disassembly
Details
09-02-2017
3.50
Nutplates for wire run support
Details
06-30-2017
1.00
Riveted antenna doublers and step cover
Details
06-28-2017
2.50
OAT sensors and wiring
Details
06-25-2017
3.00
Completed aft SV hub and ADS-B RX mount
Details
06-24-2017
2.80
Aft SV hub and ADS-B mount part 5
Details
06-21-2017
2.00
Skyview hub and ADS-B RX mount continued
Details
06-19-2017
2.50
Aft SV hub and ADS-B RX mount
Details
06-18-2017
3.00
Continued fabricating the mount aft equipment moun
Details
06-17-2017
6.00
Started a mount for the aft skyview hub and ADS-B
Details
06-14-2017
2.50
ADS-B antenna doubler and step cutout cover
Details
05-25-2017
2.00
Completed ADAHRS shelf
Details
05-24-2017
2.50
Flap actuator cover nutplates and ADAHRS shelf deb
Details
05-21-2017
6.00
ADAHRS Shelf
Details
05-20-2017
4.00
Static line and AP servo
Details
05-17-2017
3.00
Static lines
Details
05-10-2017
2.00
More flap actuator cover work
Details
05-09-2017
3.00
Flap motor assembly cover
Details
04-20-2017
2.00
Rudder cable exit fairings and flap position senso
Details
04-19-2017
2.00
Rudder cable exit fairings
Details
04-12-2017
2.00
Riveted 807 upper bulkhead and gussets to fuselage
Details
04-01-2017
3.00
Forward skin attach ribs and aft upper bulkhead ri
Details
03-26-2017
4.00
Forward top skin work
Details
03-22-2017
2.50
Instrument subpanel riveting
Details
03-21-2017
1.00
Deburred instrument panel mounting flange
Details
03-19-2017
3.00
Instrument panel prep
Details
03-18-2017
8.00
LG tower screws, fwd baggage riveting, and started
Details
03-15-2017
2.00
Windscreen support
Details
03-11-2017
7.00
More upper tailcone prep work.
Details
03-08-2017
2.50
Upper aft skin drilling
Details
03-05-2017
8.00
Upper aft fuselage skin
Details
03-04-2017
2.00
Rudder stop riveting
Details
03-03-2017
1.50
Installed rudder pedal assemblies
Details
03-01-2017
2.50
Completed rudder peddal assembly
Details
02-26-2017
8.00
Rudder pedal assembly
Details
02-25-2017
8.00
Finished flap actuator and started the rudder peda
Details
02-22-2017
3.50
Rudder cable
Details
02-19-2017
4.50
Rudder stops
Details
02-18-2017
4.00
Forward elevator control stop and rudder
Details
02-17-2017
2.50
Trimmed aft elevator stop
Details
02-16-2017
2.00
Elevator stops
Details
02-15-2017
2.50
Elevator linkage adjustment
Details
02-13-2017
2.80
More control work
Details
02-12-2017
5.00
Control column adjustment
Details
02-11-2017
6.00
Began mounting control rods in fuselage
Details
02-10-2017
2.00
Rear stick dtilling
Details
02-09-2017
2.00
Control rods continued
Details
02-08-2017
2.50
Control rods
Details
02-04-2017
5.00
Completed drilling elevator horns. Continued fabri
Details
02-01-2017
3.00
Elevator bushings and horn drilling
Details
01-29-2017
6.00
Completed installing VS and installed elevators
Details
01-28-2017
6.00
Drilled mounting holes for vertical stabilizer
Details
01-27-2017
2.50
Vertical stabillizer alignment part one
Details
01-25-2017
3.00
HS attachment final drilling
Details
01-23-2017
1.50
HS mounting part 2
Details
01-21-2017
5.00
Landing gear covers and started mounting horizonta
Details
01-18-2017
2.00
Finished riveting forward forward bottom skins
Details
01-15-2017
2.00
Started riveting forward forward bottom skins
Details
01-14-2017
6.00
Completed aft forward bottom skin
Details
01-13-2017
2.00
Started riveting aft forward bottom skin
Details
01-11-2017
2.50
Lower brake lines
Details
01-08-2017
5.00
Forward bottom skins ready for riveting
Details
01-07-2017
4.00
More forward bottom skin work
Details
01-04-2017
2.50
Forward bottom skins
Details
12-31-2016
7.00
Drilled mounting holes for landing gear.
Details
12-30-2016
8.00
Landing gear leg alignment
Details
12-29-2016
5.00
Started landing gear installation
Details
12-26-2016
1.00
Elevator push rod
Details
12-22-2016
4.00
Started tail flight control components
Details
12-18-2016
2.50
Seat ramp and throttlle quadrant mount
Details
12-17-2016
6.00
Seat ramp and throttle mount
Details
12-16-2016
2.00
Misc cockpit floor tasks
Details
12-13-2016
1.50
Switch console
Details
12-11-2016
3.00
Front seat ramp
Details
12-10-2016
5.50
Misc fuselage work
Details
12-08-2016
1.00
Nutplates
Details
12-07-2016
2.50
More floor panel riveting
Details
12-06-2016
0.00
Grove Landing Gear Arrived
Details
12-03-2016
4.50
Floor assembly riveting
Details
11-30-2016
2.50
Primed RH aft floor
Details
11-27-2016
3.00
More floor work
Details
11-26-2016
6.00
Additional floor panel prep
Details
11-25-2016
2.00
More floor panel prep
Details
11-21-2016
2.50
Some more floor work
Details
11-20-2016
6.00
More fuselage floor work
Details
11-16-2016
2.50
Cabin floor and flap bearing block drilling
Details
11-11-2016
8.00
Rear seat back and cockpit floor
Details
11-09-2016
1.70
Riveting rear seat back
Details
11-06-2016
6.00
More rear seat back prep work and installing front
Details
11-05-2016
4.50
Fuselage rotator and rear seat back deburring
Details
11-03-2016
1.00
Rear seat back
Details
11-01-2016
1.50
Riveted front seat back
Details
10-30-2016
4.00
Primed front seat back parts and painted seatback
Details
10-29-2016
8.00
Front seat back and painting seat back support
Details
10-28-2016
1.50
Seat back support plates
Details
10-27-2016
2.00
RH fuselage rail riveting and started on battery t
Details
10-26-2016
3.00
LH Fuselage rail
Details
10-25-2016
2.50
Rotisserie,servo bracket and some priming
Details
10-23-2016
3.00
Baggage rail bulkhead and rear seatbelt brackets
Details
10-22-2016
8.00
Completed skin riveting
Details
10-21-2016
1.50
Aft deck
Details
10-20-2016
1.50
Finished riveting RH aft side skin
Details
10-16-2016
2.00
Interior painting and continued riveting
Details
10-15-2016
6.00
RH aft skin riveting
Details
10-14-2016
2.50
Completed riveting LH aft side skin
Details
10-13-2016
1.50
More LH forward side skin riveting
Details
10-12-2016
3.00
LH aft side skin riveting
Details
10-11-2016
1.00
Fuselage riveting continued
Details
10-08-2016
4.00
More fuselage riveting
Details
10-07-2016
6.50
Still more fuselage riveting
Details
10-06-2016
1.50
More riveting
Details
10-05-2016
2.50
More skin riveting
Details
10-04-2016
2.00
Fuselage riveting
Details
10-02-2016
4.00
Ready for skin riveting
Details
10-01-2016
6.50
Tailcone assembly
Details
09-30-2016
1.50
Fuselage NACA vent
Details
09-29-2016
2.50
Prep for skin installation
Details
09-28-2016
3.20
New Brake lines
Details
09-25-2016
7.00
Parking brake valve brace
Details
09-23-2016
1.50
Parking brake valve mounting
Details
09-21-2016
3.00
Parking brake valve bracket
Details
09-17-2016
3.50
Installed LH side skin and drilled forward end of
Details
09-16-2016
12.00
Tail cone assembly & pitch servo bracket
Details
09-14-2016
2.00
Misc tasks
Details
09-11-2016
3.00
RH brake line
Details
09-10-2016
7.00
Finish fuel lines and started brake lines
Details
09-07-2016
3.00
RH fuel vent line
Details
09-06-2016
2.00
LH fuel vent line
Details
09-05-2016
4.00
More fuel lines
Details
09-04-2016
3.50
Fuel tubing
Details
09-03-2016
4.00
Fuel tubing
Details
08-17-2016
3.00
Aux fuel pump etc
Details
08-16-2016
2.50
Fuel fllter installation
Details
08-14-2016
8.00
Continued fuselage construction
Details
08-13-2016
8.00
Assembly
Details
08-10-2016
4.00
Finished prepping for final assy
Details
08-09-2016
1.50
Lower forward longeron riveting
Details
08-07-2016
3.00
Aft bottom skin & started fuselage final assembly
Details
08-06-2016
6.00
Upper longeron prep
Details
08-03-2016
1.50
Interior paint on forward section and fwd baggage
Details
07-31-2016
2.00
Fuselage bulkhead painting
Details
07-30-2016
2.50
Prep for fuselage interior paint
Details
07-29-2016
4.00
RH Aft side skin priming
Details
07-27-2016
3.00
LH aft side skin prep and priming lower longerons
Details
07-24-2016
7.00
Prep and painting side panels
Details
07-24-2016
6.00
Forward side skin prep
Details
07-16-2016
6.00
Misc prep tasks
Details
07-10-2016
4.00
More fuselage prep
Details
07-09-2016
4.00
Downdraft table improvements and painting interior
Details
07-07-2016
1.50
Scuffed, cleaned and primed armrests for RH skin
Details
07-06-2016
2.00
Painting arm rests and dimpling/priming bulkheads
Details
06-29-2016
3.00
Dimpling
Details
06-28-2016
2.00
Rear seat USB outlet location
Details
06-25-2016
6.00
Finished deburring and started priming and dimplin
Details
06-23-2016
3.00
Skin deburring
Details
06-22-2016
3.00
Upper longeron countersinking and misc deburring
Details
06-21-2016
1.50
Counterinking upper longerons
06-17-2016
2.00
Fuselage deburring
Details
06-08-2016
2.50
More countersinking
Details
06-05-2016
4.00
Finished fuel valve bracket and started countersin
Details
06-01-2016
2.50
Fuel valve bracket
Details
05-28-2016
8.00
Tailwheel spring drilling
Details
05-25-2016
2.00
Tailwheel spring bracket spring shim
Details
05-21-2016
8.00
Fuselage rails, seatback support and tailwheel sup
Details
05-19-2016
0.70
Aft deck
Details
05-17-2016
2.00
More final drilling and fitting tailcone upper ski
Details
05-16-2016
2.00
Final drilled aft side skins
Details
05-15-2016
5.00
Match drilling and finishing up the drilling the u
Details
05-14-2016
10.00
Longeron drilling
Details
05-11-2016
2.00
Replacement F811 bulkhead parts
Details
05-08-2016
2.50
Fuselage rails and bulkhead cap deburring
Details
05-07-2016
5.00
Tail cone build up
Details
05-06-2016
5.00
Tail cone skin prep
Details
05-04-2016
2.30
Riveted rear seat belt bracket assys and deburred
Details
05-02-2016
2.50
Rear seat lap belt bracktets, aft deck and lower l
Details
05-01-2016
5.50
Tailcone bulkhead riveting and rear seat harness s
Details
04-30-2016
6.00
More tailcone bulkhead prep
Details
04-27-2016
2.00
More tailcone bulkhead prep
Details
04-26-2016
2.00
Tailcone prep
Details
04-23-2016
7.00
Forward skins and tailcone prep
Details
04-20-2016
0.00
Saw Horses
Details
04-17-2016
5.00
RH center section side skin assy and joining front
Details
04-16-2016
4.50
Fuselage side skins
Details
04-15-2016
2.00
More mid-section side skin assembly prep
Details
04-13-2016
2.50
Mid fuselage sideskin structure prep
Details
04-10-2016
7.00
Drilling lower longerons
Details
04-09-2016
7.00
Bend the top (long) longerons - other prep work
Details
04-03-2016
4.00
Started longeron prep
Details
04-02-2016
7.00
Assembled seat rib assemby
Details
03-30-2016
3.00
Finished prepping seat rib substructure
03-28-2016
2.50
More prep and prime of seat rib assy parts
03-27-2016
2.00
More prep and prime of seat rib assy parts
03-26-2016
8.00
Fuselage center section continued
Details
03-24-2016
1.50
More seat rib assy prep
Details
03-23-2016
2.50
Inboard seat rib prep
Details
03-22-2016
1.50
Seat support
Details
03-20-2016
4.00
Assembled the center section
Details
03-19-2016
1.00
Center section work
Details
03-17-2016
2.50
Aft center section bulkhead assembly
Details
03-16-2016
3.50
Riveting firewall to floor and started assembling
Details
03-15-2016
1.30
Seat rib structure prep
Details
03-14-2016
2.00
Priming center section parts and started rear seat
Details
03-13-2016
4.00
Center section aft bulkhead prep
Details
03-12-2016
8.00
Forward section and started center section
Details
03-11-2016
8.00
More forward section work
Details
03-10-2016
2.00
Priming avionics access door parts
Details
03-09-2016
3.50
Drilled holes in avionics access door doubler.
Details
03-08-2016
2.00
Avionics access door doubler
Details
03-06-2016
6.00
Fwd baggage compartment avionics access panel
Details
03-05-2016
4.00
Forward fuselage work
Details
03-04-2016
1.70
Mid cabin braces
Details
03-02-2016
1.50
Upper cabin braces
Details
02-29-2016
2.50
Forward fuselage structure
Details
02-28-2016
7.00
Finished landing gear boxes
Details
02-27-2016
3.50
Landing gear box bolt weldments
Details
02-24-2016
2.50
Began riveting the LG towers together
Details
02-23-2016
1.00
LG Tower access cover nutplates
Details
02-21-2016
4.00
Landing gear tower prep
Details
02-20-2016
7.00
Landing gear tower mod
Details
02-19-2016
7.00
Landing gear tower prep
Details
02-17-2016
2.50
Riveting forward floor and cooling ramp
Details
02-16-2016
1.00
Landing gear tower side angles
Details
02-15-2016
2.50
Misc forward fuselage tasks
Details
02-14-2016
8.00
Finished firewall and primed fwd floor parts
Details
02-13-2016
5.00
More fwd floor prep and firewall riveting
Details
02-11-2016
1.50
Forward fuselage floor
Details
02-10-2016
2.50
Firewall angle priming and started forward fuselag
Details
02-09-2016
1.50
Firewall angle counter sinking
Details
02-08-2016
2.50
Firewall continued
Details
02-07-2016
4.00
Firewall match drilling and deburring
Details
02-01-2016
2.50
Firewall
Details
01-27-2016
2.50
Firewall prep
Details
12-08-2015
2.00
Inventoried fuselage kit hardware bags
Details
12-05-2015
4.00
Fuselage parts storage
Details
12-04-2015
5.00
Fuselage kit arrival and inventory
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.