KitLog pro

Powered By Kitlog Pro v2.0

N983LK
Work Logs Found: 305
Category Work Time: 958 Hours
 Date
Hours
Work Log Summary

Details

 05-28-2023
0.00
Aileron wedge
Details
       

 05-28-2022
3.00
Stall warning vane removal
Details
       

 02-13-2022
4.00
Redesigned wing tip hing pin retainers
Details
       

 09-07-2021
4.00
Wing root nut plates
Details
       

 07-20-2020
2.00
Wing tips continuuuuuuuuued
Details

 07-19-2020
3.00
Wing tip work and back to the canopy
Details

 07-18-2020
3.00
More wing tip and landing gear work
Details

 07-17-2020
2.00
Wing tips and landing gear
Details

 07-01-2020
4.00
Wing tip lenses try number 3
Details
       

 06-29-2020
1.50
More wing tip work
Details

 06-22-2020
2.00
Wing tip sanding
Details

 06-03-2020
3.00
Wingtips part 23 and some electrical work
Details

 06-02-2020
3.00
Wingtips part 22
Details

 06-01-2020
1.50
Wingtips part 21
Details

 05-31-2020
5.00
Wingtips part 20 and started the firewall forward
Details
       

 05-30-2020
1.50
Wing tips part 19
Details

 05-28-2020
5.00
Wingtips part 18
Details

 05-25-2020
3.00
Wingtips part 17 and canopy shims
Details

 05-24-2020
3.50
Wing tips part 16 and canopy work
Details
       

 05-23-2020
7.00
Wing tips part 15
Details
       

 05-22-2020
6.00
Wing tips part 14
Details
       

 05-20-2020
4.00
Wing tips part 13 and some canopy work
Details
       

 05-19-2020
3.70
Wing tips part 12 and back to the canopy
Details

 05-17-2020
5.00
Landing/Taxi Lights part 2
Details
       

 05-16-2020
6.00
Landing/Taxi Lights
Details
       

 05-15-2020
1.50
Wing Tips part 11
Details
       

 05-14-2020
1.00
Wing tips part 10
Details

 05-13-2020
2.30
Wing tips part 9
Details
       

 05-12-2020
1.00
Wing tips part 8
Details
       

 05-10-2020
5.00
Wing tips part 7 and canopy latch
Details
       

 05-09-2020
8.00
Wing tips part 6
Details
       

 05-08-2020
6.00
Wing tips part 5 and misc tasks
Details
       

 05-04-2020
1.00
Filling wing tip gaps
Details
       

 05-03-2020
5.00
RH wing tip hinges and VOR antenna
Details
       

 05-02-2020
2.00
Riveting hinges on LH wing tip
Details
       

 05-01-2020
9.00
More wing tip work
Details
       

 04-30-2020
3.00
Wing tip lenses Part 4
Details
     

 04-28-2020
2.00
Wing tip lenses part 3
Details
       

 04-27-2020
2.00
Wing tip lenses part 2
Details
       

 04-26-2020
4.00
Wing tip lens
Details
       

 01-23-2016
4.00
RH wing tip attach hinges and STARTED FUSELAGE!
Details
       

 01-21-2016
2.00
RH wing tip hinges
Details

 01-20-2016
3.00
RH wing tip hinges
Details

 01-19-2016
1.50
RH wing tip attach hinges
Details

 01-18-2016
4.00
RH wing tip attach hinges
Details
       

 01-17-2016
5.00
More wing tip work
Details
       

 01-14-2016
1.80
LH wing tip close out rib
Details
       

 01-13-2016
2.50
RH wing tip work
Details

 01-12-2016
1.40
LH Wing tip top inboard hinge half
Details
     

 01-10-2016
9.00
More LH Wing Tip work
Details
       

 01-07-2016
1.70
LH wing tip bottom hinge drilling
Details

 01-06-2016
3.00
LH wing tip bottom hinge prep
Details
       

 01-05-2016
1.50
Epoxied rivet holes in bottom flange of LH wing ti
Details

 01-04-2016
2.50
More wing tip work
Details

 01-03-2016
5.00
Continued LH wingtip fit up.
Details
       

 01-01-2016
3.00
Started wingtip fitup
Details
       

 12-31-2015
3.00
Attached RH flap to wing
Details
       

 12-30-2015
6.00
RH wing OB bottom skin riveting
Details
     

 12-29-2015
10.00
RH wing bottom IB skin
Details
       

 12-28-2015
2.50
NACA Vent installation
Details
       

 12-25-2015
1.50
Autopilot roll servo harness connection
Details
     

 12-23-2015
3.00
Finished riveting LH wing bottom skin
Details

 12-22-2015
7.00
LH wing outboard skin riveting
Details
       

 12-20-2015
2.00
Wing inspection hatch work
Details

 12-19-2015
7.00
Riveted LH inner bottom skin
Details
       

 12-14-2015
2.00
Prep for closing up the wing
Details
       

 12-13-2015
3.00
Finished mounting flaps and installed a wing skin
Details
       

 12-12-2015
4.00
Fitting flaps to wings
Details
       

 12-09-2015
2.50
Finished RH flap
Details
     

 12-06-2015
3.00
Finished riveting ribs to RH flap skin
Details

 12-05-2015
2.00
RH Flap riveting
Details

 12-04-2015
2.00
RH flap skins
Details

 12-02-2015
2.50
RH flap deburring
Details

 12-01-2015
1.00
Deburring RH flap substructure
Details

 11-30-2015
2.50
Finished LH flap
Details
       

 11-29-2015
7.00
Riveting LH flap
Details
       

 11-28-2015
5.00
More flap work
Details
       

 11-27-2015
2.50
Priming RH flap parts
Details

 11-25-2015
4.00
More LH flap prep
Details
       

 11-22-2015
4.00
RH flap continued
Details

 11-21-2015
3.00
RH Flap
Details

 11-20-2015
2.00
More flap prep
Details

 11-19-2015
2.00
LH flap continued
Details

 11-18-2015
2.50
Contiuned on LH flap
Details
       

 11-17-2015
1.50
Started flaps
Details

 11-15-2015
3.00
RH wing aileron bell crank
Details

 11-14-2015
8.00
Completed pitot tube pumbing and wiring
Details
       

 11-13-2015
2.00
More pitot harness work
Details
       

 11-12-2015
1.50
Started building the pitot controller harness
Details

 11-11-2015
3.50
More pitot tube and wiring routing
Details
       

 11-10-2015
1.80
Pitot plumbing
Details

 11-07-2015
10.00
Pitot/AOA lines
Details
       

 11-05-2015
1.80
LH Aileron Hardware
Details
       

 11-04-2015
4.00
Aileron pushrods and LH bell crank
Details
       

 11-01-2015
4.00
More pushrod work
Details
       

 10-31-2015
4.00
Long aileron control rods
Details
       

 10-30-2015
4.00
Aileron push rods - short
Details
       

 10-29-2015
2.00
Pitot mast
Details
       

 10-29-2015
1.80
LH aileron hardware
Details

 10-28-2015
3.50
Pitot tube heat controller
Details
       

 10-27-2015
2.00
Finished RH aileron
Details
       

 10-25-2015
3.50
Riveting RH aileron
Details
       

 10-24-2015
7.00
Bottom wing skin prep and priming
Details
       

 10-23-2015
3.00
More wing skin prep
Details

 10-22-2015
7.00
RH bottom wing skins
Details

 10-21-2015
3.00
RH aileron prep and prime and RH bottom wing skin
Details

 10-17-2015
4.00
RH aileron prep
Details

 10-16-2015
1.00
FInished LH aileron
Details
       

 10-15-2015
2.00
Completted riveting LH aileron
Details

 10-14-2015
3.00
LH Aileron final assembly
Details
       

 10-13-2015
4.00
More aileron prep
Details
       

 10-11-2015
2.50
LH aileron prep
Details

 10-10-2015
6.00
More aileron prep
Details

 10-04-2015
3.50
Aileron build up
Details
       

 10-03-2015
6.00
Aileron skins
Details
       

 10-01-2015
3.00
Primed aileron stiffeners
Details

 09-30-2015
2.50
Aileron skin prep
Details
     

 09-29-2015
2.00
Aileron stiffeners continued
Details

 09-27-2015
3.00
Aileron stiffeners
Details
     

 09-26-2015
3.50
Flap brace riveting
Details
       

 09-25-2015
3.50
Riveted aileron gap fairings
Details

 09-24-2015
1.50
Dimpling and priming aileron gap fairings
Details
       

 09-23-2015
2.50
Aileron gap fairings and flap brace prep for prime
Details

 09-22-2015
2.00
Match drilled flap brace flanges to bottom skins
Details

 09-20-2015
4.00
Flap braces and aileron gap fairings
Details

 09-19-2015
7.00
Wing cart and aileron bracket installation
Details
       

 09-17-2015
1.00
Aileron stiffeners
Details

 09-16-2015
1.50
Fitting aileron brackets to wings
Details

 09-13-2015
3.50
Misc wing tasks
Details
       

 09-11-2015
6.00
RH top wing skin riveting
Details
       

 09-09-2015
6.00
Finished riveting LH top skins
Details
       

 09-08-2015
4.00
Started riveting wing skins and misc deburring
Details
       

 09-06-2015
4.00
Misc leading edge tasks
Details
       

 09-03-2015
1.00
Replacement aileron brackets
Details

 08-30-2015
3.00
Priming
Details

 08-29-2015
6.00
Leading edge sikin to spar rivets
Details
       

 08-28-2015
2.50
RH LE rib to spar rivets
Details
       

 08-27-2015
1.50
Fabricated another bucking bar guide
Details
     

 08-26-2015
2.50
More LE rib riveting
Details

 08-23-2015
3.00
Pitot Static Mast location layout
Details
     

 08-22-2015
3.00
Aileron bracket priming
Details

 08-21-2015
6.00
More LE riveting and preassembly of aileron bracke
Details
       

 08-20-2015
2.00
More LH LE to spar riveting
Details

 08-19-2015
2.00
Riveted second LH LE rib flange to the spar
Details
       

 08-18-2015
2.50
Started riveting LH LE to spar
Details
       

 08-16-2015
3.50
RH OB top skin dimpling and priming
Details

 08-14-2015
2.00
RH top wing skin prep
Details
     

 08-14-2015
6.00
OB LH LE Rib riveting and aileron bracket prep
Details

 08-13-2015
2.20
More RH wing skin prep
Details

 08-12-2015
2.50
RH wing skin and substructure prep
Details

 08-11-2015
1.50
More RH substructure prep for skins
Details

 08-10-2015
2.00
Deburring and dimpling RH wing substructure
Details

 08-08-2015
0.70
Primed LH top wing skins
Details

 08-07-2015
7.00
LH wing skin dimpling etc
Details
       

 08-06-2015
0.70
LH wing walk doubler prep
Details

 07-31-2015
0.00
LH leak check PASSED!
Details
     

 07-30-2015
1.00
More LH sub stucture deburring and dimpling
Details

 07-29-2015
1.50
More deburring and dimpling of LH wing structure

 07-28-2015
1.00
LH wing rib prep
Details

 07-25-2015
3.00
More RH spar prep
Details
       

 07-24-2015
4.00
LH tank leak check and RH spar prep
Details
       

 07-23-2015
2.50
RH Spar flange countersinking
Details

 07-21-2015
2.00
LH fuel tank end plate
Details

 07-19-2015
2.00
LH tank sending unit attachement
Details

 07-17-2015
2.50
LH tank final riveting and sealing
Details

 07-15-2015
4.50
LH fuel tank baffle installation
Details
       

 07-11-2015
1.50
More LH tank work
Details

 07-10-2015
3.00
LH fuel tank IB rib
Details

 07-08-2015
3.00
LH fuel tank OB rib
Details
       

 07-07-2015
1.50
LH tank fuel pickup
Details

 07-04-2015
2.00
Sealing LH tank inner rib shop heads
Details
       

 07-03-2015
7.00
LH tank riveting
Details
       

 07-02-2015
4.00
Sealing LH fuel tank
Details
       

 07-02-2015
0.00
More photos from 7/2
Details
       

 07-01-2015
2.00
LH wing skin prep
Details

 06-30-2015
1.50
RH wing skin prep work
Details

 06-28-2015
1.30
RH wing skin prep
Details

 06-26-2015
1.50
RH fuel tank leak check
Details
       

 06-25-2015
2.00
LH spar countersinking
Details

 06-23-2015
1.50
RH access cover
Details
     

 06-21-2015
4.00
RH tank
Details
     

 06-20-2015
1.50
Mounted RH sending unit
Details
       

 06-19-2015
2.50
RH tank finish work
Details

 06-18-2015
2.00
RH tank clean up
Details
       

 06-17-2015
5.00
RH tank baffel installation
Details
       

 06-16-2015
2.50
Main spar countersinking
Details

 06-14-2015
1.50
Spar Countersinking
Details
       

 06-13-2015
5.00
More fuel tank work
Details
       

 06-11-2015
1.50
Misc prosealing
Details
       

 06-10-2015
2.30
RH fuel sender float and fuel pickup
Details
       

 06-09-2015
1.50
Fuel tank access plates
Details
       

 06-06-2015
5.50
RH tank IB rib installation
Details
       

 06-05-2015
5.50
End rib work
Details
       

 06-04-2015
1.50
Prep for RH tank end rib proseal
Details

 06-02-2015
4.00
Prosealing rivet shop heads
Details

 06-01-2015
3.00
Prosealing shopheads
Details
       

 05-31-2015
7.00
Riveting RH ribs
Details
     

 05-30-2015
4.00
Prosealed 5 inner ribs to RH tank skin
Details
       

 05-28-2015
3.00
Replacing rivets on tank flanges
Details

 05-27-2015
4.50
Tank rib dimpling and cap flange riveting
Details

 05-25-2015
8.00
Fuel tankwork
Details
       

 05-22-2015
7.00
Fuel tank stiffener sealing and riveting
Details
       

 05-21-2015
3.00
Tank skin and stiffener dimpling
Details
       

 05-20-2015
2.00
Fuel vent clips and tank skin dimpling
Details
       

 05-18-2015
1.50
Tank prep
Details

 05-17-2015
2.50
Tank prep
Details

 05-14-2015
1.20
Deburring ribs
Details

 05-13-2015
3.00
Deburring wing skins
Details

 05-12-2015
2.00
Tank rib prep
Details
       

 05-10-2015
5.00
Fuel caps contiuned and fuel drains
Details
       

 05-08-2015
2.30
Inboard rib prep and fuel cap flange installation.
Details
       

 05-06-2015
1.50
Tank end rib prep
Details
       

 05-03-2015
2.00
Fuel tank end rib prep
Details

 05-01-2015
3.00
Modified T-405 tank brackets and cut holes in end
Details
       

 04-29-2015
3.20
T-405 tank rib attach angles.
Details

 04-26-2015
5.00
T-405 tank attach angles
Details
       

 04-24-2015
6.00
Fuel tank match drilling and countersinking
Details
       

 04-23-2015
3.00
Match drilling fuel tanks
Details

 04-22-2015
3.00
Tank stiffeners
Details

 04-21-2015
1.00
LH inboard top forward rib to spar rivets
Details

 04-18-2015
1.00
Finished riveting RH leading edge
Details

 04-17-2015
2.00
RH LE riveting
Details

 04-15-2015
3.00
Riveting RH leading edge
Details

 04-12-2015
2.00
LH landing light lens
Details
       

 04-11-2015
7.00
Landing light bays
Details
       

 04-10-2015
2.50
More work on LH LE landing light
Details

 04-09-2015
2.00
LH Landing light cut out
Details
       

 04-08-2015
3.00
LH LE landing light cut out
Details

 04-07-2015
1.50
RH wing LE priming and spar to rib rivets
Details

 04-05-2015
2.00
Misc RH wing items
Details

 04-04-2015
5.00
More RH LE prep
Details
       

 04-03-2015
10.00
RH Leading Edge prep
Details

 04-01-2015
3.50
RH LE Landing light lens
Details
       

 03-28-2015
4.00
RH LE langing light cut out
Details
       

 03-27-2015
2.00
RH Leading edge work
Details
       

 03-25-2015
3.00
RH fuel tank attachment
Details

 03-24-2015
1.20
Removed vinyl strips from LH fuel tank
Details

 03-23-2015
8.00
Stall horn switch bracket, RH wing tank zees, RH t
Details
       

 03-22-2015
0.00
More photos from 3/22/15
Details
       

 03-21-2015
8.00
Misc work on LH and RH wing
Details
       

 03-20-2015
2.30
RH tank zees
Details

 03-19-2015
2.00
Finished riveting LH leading edge
Details
       

 03-18-2015
3.00
Started riveting LH leading edge together
Details
       

 03-17-2015
1.50
More LH leading edge prep
Details

 03-16-2015
1.50
Dimpled LH LE
Details

 03-15-2015
7.00
LH LE prep
Details
       

 03-14-2015
9.00
LH wing leading edge Prep
Details
       

 03-12-2015
2.30
RH fuel tank rib prep
Details

 03-11-2015
3.00
RH wing LE inbrd rib
Details

 03-10-2015
2.00
Clecoed RH LE ribs to skin
Details

 03-08-2015
0.00
More photos from 4/8/15
       

 03-08-2015
6.00
LH fuel tank fit up
Details
       

 03-07-2015
6.00
LH fuel tanks
Details

 03-04-2015
3.00
LH Wing tank attach angles
Details
       

 03-03-2015
1.50
Wing rib prep
Details

 03-01-2015
2.50
Misc wing stuff
Details
       

 02-28-2015
0.00
More photos from 2/27/15
Details
       

 02-27-2015
4.00
LH leading edge prep
Details
       

 02-25-2015
1.00
More match drilling RH bottom skins
Details

 02-24-2015
1.50
RH wing skins
Details

 02-22-2015
5.00
RH wing skins
Details
       

 02-21-2015
2.00
Finished match drilling LH bottom wing skins and m
Details
       

 02-20-2015
2.00
Match drilling wing skins
Details
     

 02-19-2015
2.50
More LH skin prep
Details
     

 02-18-2015
4.00
LH Wing top skin
Details
     

 02-17-2015
1.50
Wing skins
Details

 02-15-2015
0.00
Built a wing stand/jig
Details
       

 02-11-2015
2.50
Finished riveting aft ribs to spars
Details
       

 02-10-2015
2.00
Finished riveting aft ribs to RH main spar

 02-09-2015
2.50
More riveting aft ribs to RH main spar

 02-08-2015
2.00
Riveting aft ribs to RH main spar

 02-06-2015
3.00
Finished LH wing skeleton
Details
       

 02-05-2015
0.00
More photos from last night
       

 02-05-2015
2.50
Continued riveting aft ribs to main spar
Details

 02-04-2015
3.50
Riveting ribs to main spar
Details
       

 02-01-2015
5.00
More aft rib priming

 01-31-2015
2.50
Aft rib priming

 01-29-2015
1.50
Rib priming and scuffing
Details

 01-28-2015
2.00
Wing rib priming
Details

 01-27-2015
2.50
Aft rib priming
Details
     

 01-26-2015
2.00
Rib deburring and priming
Details
     

 01-25-2015
4.00
Deburred rib flange holes and drilled holes for wi
Details
       

 01-24-2015
5.00
More wing rib prep and wing aft section fit up
Details
       

 01-22-2015
2.00
Assembled rear spars
Details
       

 01-21-2015
3.00
More rib prep
Details

 01-18-2015
2.00
More wing rib prep
Details

 01-17-2015
2.50
More rib prep
Details
       

 01-16-2015
1.50
Rib prep
Details

 01-05-2015
2.50
Riveted tie down brackets
Details
       

 01-03-2015
1.00
Primed parts for tiedown brackets

 12-30-2014
2.00
More wing rear spar prep
Details

 12-29-2014
4.00
Wing rear spar prep
Details
       

 12-28-2014
6.00
Rear wing spar prep
Details

 12-26-2014
2.00
Tiedown brackets
Details

 12-24-2014
1.00
Tapped tiedown bracket for tie down bolts.
Details
       

 12-23-2014
3.50
Wing spar countersinking
Details

 12-22-2014
1.50
Spar countersinking
Details

 12-21-2014
7.00
Spar nutplates and countersinking
Details
       

 12-20-2014
5.00
Countersinking for tank attach screws
Details

 12-18-2014
2.00
RH spar prep
Details

 12-17-2014
2.00
RH wing spar prep
Details

 12-16-2014
3.00
LH spar countersinking
Details

 12-15-2014
2.00
Started wing
Details

 11-25-2014
0.00
Finished inventorying wing kit - nothing missing

 11-24-2014
0.00
Wing kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.