Date
|
Hours
|
Work Log Summary
|
Details
|
09-15-2022
|
6.00
|
Tested pitot/static ports, reduce idle
|
Details
|
|
|
07-20-2022
|
2.00
|
put on cowls, show the plane
|
Details
|
|
|
07-19-2022
|
2.25
|
wire-ties and RTV on the engine
|
Details
|
|
|
07-18-2022
|
1.25
|
wire-tie and one RTV on the engine
|
Details
|
|
|
07-17-2022
|
2.90
|
More taxi testing
|
Details
|
|
|
07-16-2022
|
1.25
|
First time taxi testing
|
Details
|
|
|
06-26-2022
|
1.75
|
torque the engine throttle cable clamps
|
Details
|
|
|
06-25-2022
|
4.50
|
syncronized the engine carbs
|
Details
|
|
|
06-16-2022
|
2.00
|
replaced valve cover bolt
|
Details
|
|
|
06-13-2022
|
2.25
|
check engine lifters
|
Details
|
|
|
06-04-2022
|
1.50
|
major engine run, very successful
|
Details
|
|
|
05-31-2022
|
3.25
|
adjusted thottle cables, misc
|
Details
|
|
|
05-29-2022
|
2.25
|
fixed EGT wiring, and misc
|
Details
|
|
|
05-28-2022
|
2.00
|
first engine start!!
|
Details
|
|
|
05-19-2022
|
1.50
|
get engine ready to run
|
Details
|
|
|
05-06-2022
|
2.00
|
added more oil, install seat ramp
|
Details
|
|
|
05-05-2022
|
1.25
|
added engine antifreeze
|
Details
|
|
|
04-26-2022
|
2.40
|
perform SB 10-3-17 radiator clearance
|
Details
|
|
|
04-24-2022
|
2.00
|
Engine oil purge
|
Details
|
|
|
04-22-2022
|
1.50
|
safety wire oil tank drain, oil purge
|
Details
|
|
|
04-18-2022
|
1.00
|
Tested oil purge and vinegar cleaning
|
Details
|
|
|
12-16-2021
|
0.75
|
re-install top cowling, install screws in spinner
|
Details
|
|
|
12-03-2021
|
1.00
|
install both cowlings
|
Details
|
|
|
10-02-2021
|
3.00
|
mount prop blades and adjust pitch
|
Details
|
|
|
10-01-2021
|
1.00
|
mount propeller aft mount hub
|
Details
|
|
|
09-30-2021
|
2.50
|
more spinner work plus rivetting
|
Details
|
|
|
09-29-2021
|
2.75
|
more spinner work
|
Details
|
|
|
09-27-2021
|
2.00
|
work on the spinner
|
Details
|
|
|
09-26-2021
|
3.25
|
work on spinner gap spacers
|
Details
|
|
|
09-25-2021
|
1.25
|
more spinner work
|
Details
|
|
|
09-24-2021
|
3.75
|
finish spinner while mounted
|
Details
|
|
|
09-23-2021
|
2.75
|
work on the spinner, mount prop blades
|
Details
|
|
|
09-22-2021
|
4.00
|
pitot yube and spinner work
|
Details
|
|
|
09-21-2021
|
2.50
|
work on pitot tube
|
Details
|
|
|
09-19-2021
|
1.50
|
attached throttle cables
|
Details
|
|
|
09-17-2021
|
0.03
|
attach choke cables to carb
|
Details
|
|
|
09-16-2021
|
1.00
|
finished cable spacer, installed cushioned clamp
|
Details
|
|
|
09-14-2021
|
5.50
|
work on engine throttle controls
|
Details
|
|
|
09-13-2021
|
0.50
|
Look at engine controls details
|
Details
|
|
|
09-11-2021
|
3.50
|
install choke in instrument panel
|
Details
|
|
|
09-10-2021
|
1.50
|
install throttle cable in instrument panel
|
Details
|
|
|
09-08-2021
|
2.25
|
finish oil hoses, start install of throttle
|
Details
|
|
|
09-07-2021
|
2.75
|
talked to Vans on the oil hoses
|
Details
|
|
|
09-03-2021
|
1.25
|
worked on fit of oil cooler and hose plaecment
|
Details
|
|
|
09-02-2021
|
2.75
|
finish cowl heat shield foil, install oil hose
|
Details
|
|
|
09-01-2021
|
1.50
|
attach two oil hoses finger tight
|
Details
|
|
|
08-31-2021
|
1.50
|
|
Details
|
|
|
08-29-2021
|
2.00
|
install EGT sensors
|
Details
|
|
|
08-27-2021
|
2.75
|
torque exhaust tubes, RTV on retention springs
|
Details
|
|
|
08-26-2021
|
2.25
|
partial install of muffler
|
Details
|
|
|
08-25-2021
|
1.60
|
applied duct seals, install exhaust pipes
|
Details
|
|
|
08-24-2021
|
1.50
|
cut cooling air duct seals
|
Details
|
|
|
08-23-2021
|
1.00
|
sand repair some items on cowls
|
Details
|
|
|
08-20-2021
|
2.25
|
fill gaps in cowl air duct, affix label on duct
|
Details
|
|
|
08-19-2021
|
3.00
|
epoxy the colling duct and interface
|
Details
|
|
|
08-18-2021
|
2.00
|
more sanding and fitting duct
|
Details
|
|
|
08-16-2021
|
3.00
|
sand and fit the cooling duct for radiator clearan
|
Details
|
|
|
08-15-2021
|
1.00
|
trim aft edge of cooling duct
|
Details
|
|
|
08-14-2021
|
4.50
|
trim cooling for fit, test cleco, ready to trim
|
Details
|
|
|
08-12-2021
|
1.50
|
drill oil cooler assy. mount holes in duct, rivet
|
Details
|
|
|
08-11-2021
|
3.00
|
finish fabficating oil cooling box with radiator
|
Details
|
|
|
08-10-2021
|
1.50
|
prepare and rivet top plate on cooling box
|
Details
|
|
|
08-08-2021
|
1.25
|
fab wood plates, deburr cooling box parts
|
Details
|
|
|
08-07-2021
|
1.00
|
mark scribe lines on cooling duct
|
Details
|
|
|
08-06-2021
|
4.25
|
install heater cable onto heater door
|
Details
|
|
|
08-05-2021
|
7.00
|
debur friction comb, apply wrap to instrument pane
|
Details
|
|
|
08-04-2021
|
3.00
|
secure coolant hose to front gear leg
|
Details
|
|
|
08-03-2021
|
5.25
|
sand cowling, install radiator and hoses
|
Details
|
|
|
08-02-2021
|
3.80
|
epoxy scoop onto cowl, RTV cooling door
|
Details
|
|
|
07-28-2021
|
2.65
|
work on top cowl scoop
|
Details
|
|
|
07-27-2021
|
1.25
|
work on NACA template
|
Details
|
|
|
07-26-2021
|
3.00
|
finish up bottom cowl close out and cut holes
|
Details
|
|
|
07-22-2021
|
1.50
|
work on bottom cowl close out
|
Details
|
|
|
07-21-2021
|
1.60
|
more work on oil door
|
Details
|
|
|
07-20-2021
|
3.50
|
top cowling oil door work
|
Details
|
|
|
07-09-2021
|
3.25
|
rivet front cowl rivuts, assemble oil door
|
Details
|
|
|
07-08-2021
|
1.75
|
drill forward colwing holes to #19, rivet 2 knuckl
|
Details
|
|
|
07-07-2021
|
3.00
|
finish riveting cowls
|
Details
|
|
|
07-05-2021
|
2.25
|
more riveting
|
Details
|
|
|
07-02-2021
|
4.00
|
rivet hinges onto the cowlings
|
Details
|
|
|
07-01-2021
|
1.50
|
fabricate oil door and hinge pieces
|
Details
|
|
|
06-27-2021
|
2.80
|
drill remaining cowling hinge holes
|
Details
|
|
|
06-24-2021
|
3.50
|
sanded top and bottom cowls for better fit, drille
|
Details
|
|
|
06-23-2021
|
7.50
|
attach mid cowl hinges, trim pins, sand to fit
|
Details
|
|
|
06-22-2021
|
2.50
|
flute cowling hinges to match curves
|
Details
|
|
|
06-19-2021
|
2.00
|
remarked hinges and reinstalled on fuselage
|
Details
|
|
|
06-18-2021
|
4.25
|
fabricate and mark other cowling hinges
|
Details
|
|
|
06-17-2021
|
1.25
|
layout holes on hinge pieces
|
Details
|
|
|
06-16-2021
|
2.00
|
cut bend and grind hinge pins, re-install panel
|
Details
|
|
|
06-15-2021
|
1.50
|
cut cowling hinges
|
Details
|
|
|
06-11-2021
|
4.85
|
finish sanding bottom cowling, cut slot
|
Details
|
|
|
06-10-2021
|
1.25
|
finish sanding top cowling
|
Details
|
|
|
06-09-2021
|
4.00
|
work on cowling
|
Details
|
|
|
06-08-2021
|
1.50
|
worked on getting ready for cowling work
|
Details
|
|
|
06-07-2021
|
1.25
|
connect wires to voltage reg., order 3M Wrap
|
Details
|
|
|
06-04-2021
|
1.50
|
reroute WH-P156 & WH-P761, safety wire plugs
|
Details
|
|
|
06-02-2021
|
2.50
|
fabricate and install fuel drain hose and tube
|
Details
|
|
|
06-01-2021
|
1.50
|
connect starter wires, connect man. press. hose
|
Details
|
|
|
05-29-2021
|
5.25
|
connect sensors to the engine
|
Details
|
|
|
05-27-2021
|
2.50
|
torqued engine bracket bolts,
|
Details
|
|
|
05-25-2021
|
2.50
|
replace engine mount bracket per SB00023
|
Details
|
|
|
04-29-2021
|
4.00
|
torqued engine bolts, fuel line install, ignition
|
Details
|
|
|
04-27-2021
|
2.00
|
deburr holes, mount the engine
|
Details
|
|
|
04-21-2021
|
0.10
|
vans correspondence
|
Details
|
|
|
03-29-2021
|
1.75
|
connect oil tank vent, cooling overflow bottle
|
Details
|
|
|
03-25-2021
|
0.75
|
install oil tank assembly
|
Details
|
|
|
03-24-2021
|
1.00
|
cut hoses for oil tank vent and coolant overflow
|
Details
|
|
|
03-09-2021
|
2.75
|
drilled larger two engine mount holes
|
Details
|
|
|
03-08-2021
|
1.50
|
redo placement of fuel line banjo bolts
|
Details
|
|
|
03-07-2021
|
1.00
|
cut and mount carb drip tray dampeners
|
Details
|
|
|
03-06-2021
|
1.00
|
final torqued the upper left engine mount
|
Details
|
|
|
02-27-2021
|
0.50
|
finish riveting the cooling box
|
Details
|
|
|
02-26-2021
|
1.50
|
Make new cooling box hinge, match drill, rivet
|
Details
|
|
|
02-22-2021
|
0.75
|
drill #30 holes in cooling box hinge
|
Details
|
|
|
02-18-2021
|
1.50
|
rivet colling box hinge and bracket to door
|
Details
|
|
|
02-15-2021
|
1.00
|
countersink the hinge holes
|
Details
|
|
|
02-11-2021
|
1.50
|
colling box parts
|
Details
|
|
|
02-10-2021
|
1.25
|
Cooling hoses
|
Details
|
|
|
01-29-2021
|
1.00
|
install ignition screw, modify 8mm hex wrench
|
Details
|
|
|
01-20-2021
|
0.75
|
packed exhaust pieces to send to Vans
|
Details
|
|
|
01-13-2021
|
2.25
|
install carb drip trays
|
Details
|
|
|
12-29-2020
|
0.75
|
install regulator monitor wire
|
Details
|
|
|
12-20-2020
|
1.00
|
work on voltage regulator mounting
|
Details
|
|
|
12-15-2020
|
1.25
|
seal corners of carb drip trays
|
Details
|
|
|
12-12-2020
|
1.50
|
work on voltage regulator mounting
|
Details
|
|
|
12-11-2020
|
1.75
|
complete drip trays riveting, glue/clamp doubler
|
Details
|
|
|
12-10-2020
|
1.75
|
partial assembly of carburetor drip trays
|
Details
|
|
|
12-09-2020
|
1.00
|
paint tie-down rings, prime rivnuts
|
Details
|
|
|
12-05-2020
|
1.00
|
cut and deburr carburetor drip pan pieces
|
Details
|
|
|
12-02-2020
|
0.75
|
start prep of carb drip pan pieces
|
Details
|
|
|
11-22-2020
|
1.75
|
wire some power wires
|
Details
|
|
|
11-20-2020
|
1.25
|
replace connectors on EGT sensors, prime parts
|
Details
|
|
|
11-18-2020
|
2.25
|
Install firewall forward wiring
|
Details
|
|
|
11-14-2020
|
2.00
|
torque engine mount, install master relay, wiring
|
Details
|
|
|
11-11-2020
|
4.50
|
INstall engine mount on the engine
|
Details
|
|
|
11-09-2020
|
1.75
|
remove both carbs, cut lug on starter
|
Details
|
|
|
11-08-2020
|
2.00
|
verify ignition coil spacing, start other engine m
|
Details
|
|
|
11-04-2020
|
1.50
|
disconnect the Rotax ignition connectors, etc.
|
Details
|
|
|
11-03-2020
|
2.00
|
redo safety wire on gascolator,install pitot exten
|
Details
|
|
|
10-31-2020
|
3.25
|
firewall forward wiring
|
Details
|
|
|
10-27-2020
|
2.80
|
Start install of engine wiring
|
Details
|
|
|
10-24-2020
|
1.50
|
Got new prints, gathered engine parts
|
Details
|
|
|
10-23-2020
|
3.00
|
Review engine drawings, order DynaVibe
|
Details
|
|
|
10-22-2020
|
1.50
|
Review SD-00001 and engine drawings
|
Details
|
|
|
10-16-2020
|
3.00
|
Received 912ULS powerplant kit
|
Details
|
|