KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
Work Logs Found: 21
Category Work Time: 96 Hours
 Date
Hours
Work Log Summary

Details

 10-23-2020
5.00
F-01207B-1 and Foward Lower Fuselage Bulkhead
Details
     

 10-22-2020
1.00
Forward Fuselage Details
Details
       

 10-21-2020
5.00
Bottom Skin Doublers, F-01213-L-1 & R-1
Details
       

 10-19-2020
4.50
Bottom F-01276-1 Skin Prep and Install
Details
       

 10-17-2020
5.00
Bottom sie skins
Details
       

 10-16-2020
5.00
Installing F-01203A-1 and F-01226-R-1 and L-1, Ste
Details
       

 10-13-2020
2.50
Step rib and bulkhead part prep
Details
       

 10-12-2020
5.00
F-01203A-1 Assembly and F-1204C-L&R Install
Details
       

 10-11-2020
5.00
F-01203A-1 Bulkhead Buildup
Details
       

 10-03-2020
5.00
Installing Seat Floor Assemblies
Details
       

 10-01-2020
7.00
Assembled floor panels and installed to seat ribs
Details
       

 09-26-2020
7.00
Prepped floor panels and other parts
Details
       

 09-22-2020
5.00
Seat Rib Subassembly
Details
       

 09-19-2020
6.00
Seat Rib Assembly
Details
       

 02-16-2019
5.00
Pulley Bracket and Flaperon Mixer Arm
Details
       

 01-13-2019
4.00
Riveting Baggage Ribs
Details
       

 01-12-2019
6.00
Bulkhead Assembly
Details

 01-06-2019
2.00
Riveting Baggage Ribs
Details
       

 01-05-2019
6.00
Riveting Baggage Ribs
Details

 01-02-2019
3.00
ELT Bracket Assembly
Details
       

 01-01-2019
2.00
Fuel Tank Pads and Baggage Floors
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.