KitLog pro

Powered By Kitlog Pro v2.0

Norris's RV Construction
Work Logs Found: 95
Category Work Time: 527 Hours
 Date
Hours
Work Log Summary

Details

 04-22-2022
3.00
adjusting control surfaces

 04-21-2022
4.00
Install and adjust flalp. Adjust sticks and ailer

 04-20-2022
5.00
Painting the flaps

 04-19-2022
3.50
Paint flaps and install the Pitot assembly

 04-18-2022
2.00
Prep and etch and prime flaps and wing farings

 04-15-2022
6.00
Finished the R wing root farings

 04-14-2022
0.45
R wing root faring

 04-13-2022
3.50
L wing fairing

 04-12-2022
1.00
L wing faring

 04-11-2022
3.50
Working on the farings for the left wing

 04-08-2022
5.00
L wing faring work

 04-07-2022
5.00
R wing faring work

 04-06-2022
7.00
working on the wing farings

 04-05-2022
4.00
Start working on the wing farings

 03-22-2022
5.00
Finished Right flap

 03-21-2022
8.00
Working on the Right flap.

 03-18-2022
7.00
Finishing making the Left Flap

 03-17-2022
5.50
Working on L flap

 03-16-2022
7.50
Working on making the L flap

 03-15-2022
3.50
Start on the flaps

 03-15-2022
1.50
Install right wing tip

 03-14-2022
3.00
Installed the L wing tip onto the wing
     

 03-11-2022
4.50
Install R. aileron and adjust the linkeages for bo

 02-21-2022
1.00
For wing install put on nuts and tourque

 02-18-2022
5.00
Install wings with help from Wally, Allen, and Ron

 02-17-2022
2.00
Fit the two wing tip lenses

 02-15-2022
5.00
Working on the fiberglass wingtips

 01-24-2022
1.50
Finished the R aileron

 01-21-2022
3.50
Continue with R aileron. Making jig to rivit stra

 01-20-2022
8.00
Working on R aileron
     

 01-13-2022
4.00
Testing stick throws.
Details

 01-11-2022
5.00
Worked on aileron deflection and stick clearance

 01-07-2022
6.00
l eft aileron

 01-06-2022
7.00
Made L and R aileron skins
     

 01-05-2022
4.00
Started asembling the Left aileron

 01-03-2022
5.00
Finished left aileron and temp installed L wing
     

 04-14-2021
4.00
Buffing and riveting
Details

 04-12-2021
8.00
Preped, painted, and clear coated the Left Wing

 04-02-2021
3.00
Priming and sanding R wing

 04-01-2021
8.50
Preped and started priming the R wing

 03-31-2021
9.00
R wing
Details

 03-30-2021
4.50
Finished riveting on the bottom skin of R wing

 03-29-2021
7.00
Continue riviting on bottom skin

 03-26-2021
9.00
Install fuel tank. Prep and start installing botto

 03-25-2021
7.00
Ran wiring lfor the R wing.

 03-24-2021
6.50
Install roll servo. Wire wing lights.

 03-23-2021
6.00
R wing work
Details

 03-22-2021
3.00
Started riveting the forward outboard piece to the

 03-15-2021
9.00
Finished tank sealing and riveting the R fuel tank

 03-12-2021
8.00
Continued riviting with tank sealer. Messy job!

 03-11-2021
5.00
R wing tank
Details

 03-10-2021
8.00
Riviting and sealing the R wing tank

 03-05-2021
6.50
Preping the R wing tank parts for assembly

 03-02-2021
7.50
R wing outboard leading edge
Details
     

 03-02-2021
1.50
Assembling, cutting, deburring parts for R fuel ta

 03-01-2021
7.00
see details
Details

 02-25-2021
8.50
Finished riveting on the top skin of R wing
Details
       

 02-24-2021
7.50
Wing top skin and outboard leading edge
Details

 02-23-2021
8.00
Preped the R top wing skin and started riveting
     

 02-22-2021
8.50
Attached rear spar to the R eing
     

 02-19-2021
2.00
Finished riveting land bolting on the R wing aft r

 02-18-2021
8.50
Ready and install the R wing aft ribs
     

 02-17-2021
7.00
Continue working on right wing

 02-16-2021
5.00
Started working on tghe right wing

 02-15-2021
8.00
Installed vor ant in left wing tip and installed n

 02-12-2021
4.00
Trimming and start nutplating the L wing tip

 02-04-2021
7.00
Prep, spray one coat of white then spray clear coa

 02-03-2021
6.00
Prepping, cleaning, and applying white basecoat

 02-02-2021
5.00
Sand and prime L wing and rudder

 02-01-2021
8.00
Paint prep and prime L wing

 01-26-2021
3.00
Worked on prepping the left wing for paint

 01-21-2021
5.00
Wire up fuel tank capacitive probs

 01-20-2021
5.00
Made the aileron actuators and installed on L wing

 01-19-2021
7.00
Finished riviting the left wing

 01-18-2021
7.00
continue riviting bottom skins on left wing

 01-15-2021
9.00
L wing bottom skin. Finished prepping and start r

 01-14-2021
5.00
Finished prepping the bottom outboard wing skin
Details

 01-13-2021
7.00
Preped the L outboard bottom skin
Details
     

 01-06-2021
9.00
Finished running wires and making plugs

 01-05-2021
2.00
Continue pulling wire

 01-04-2021
9.00
Install Pitot tude support and plan wire runs

 12-28-2020
9.00
Making Aileron push rods for both wings

 12-21-2020
6.00
Finished sealing the left fuel tank
       

 12-18-2020
9.00
Continuing sealing and riviting the left tank

 12-17-2020
7.00
Making and installing Magnetometer bracket
     

 12-14-2020
5.50
sealing, riviting, and cleaning up L tank sealent

 12-11-2020
6.00
Continue riveting and tank sealing the L fuel tank

 12-10-2020
5.00
tank sealed and riveted the trough in place

 12-09-2020
9.00
Finish getting the fuel take ready to rivet

 11-27-2020
4.00
Clekod the left fuel tank together
     

 11-25-2020
7.00
Drill, DEbure, dimple Left fuel tank parts

 11-23-2020
3.00
Prep parts for left fuel tank

 10-23-2020
3.00
Clekod the L forward skin

 10-15-2020
7.00
Finished riveting the top wing skin

 10-14-2020
2.00
Started riveting the top L wing skin on










Copyright © 2001-2024 Matronics. All Rights Reserved.