Powered By Kitlog Pro v2.0
Edwards Web Site
RV-14A
Fuselage
Work Logs Found:
97
Category Work Time:
626 Hours
Date
Hours
Work Log Summary
Details
09-09-2023
6.00
Installed the emergency canopy eject system
Details
09-07-2023
7.00
Completde buss manager installation and engine mon
Details
07-21-2023
11.00
Installed the control cables
Details
06-25-2023
4.00
Deburred and primed miscelaneous floor panels
Details
05-10-2023
4.00
Cowling test fitting
Details
05-09-2023
7.50
Added rubber sealing strips to intakes on bottom c
Details
05-08-2023
6.00
Added rubber seal strips to the engine baffles
Details
05-04-2023
7.00
Installed air intake snorkle
Details
04-28-2023
7.00
Installed baffle assemblies to the engine
Details
04-20-2023
7.00
Continued assembling the engine baffles
Details
04-17-2023
2.00
Added RTV strips to rear baffle components
Details
04-15-2023
6.50
Started fabriaction of engine baffles
Details
04-06-2023
5.00
Added bottom cowl close-out piece
Details
04-01-2023
9.50
Fabricated the front wheel fairing
Details
03-17-2023
7.00
Added oil access door to top cowling
Details
03-09-2023
9.00
Continued cowling work
Details
02-24-2023
16.00
Continuation of fitting the cowling
Details
01-23-2023
20.00
Fitting the cowling
Details
12-01-2022
6.50
Added items to front of firewall
Details
11-03-2022
6.00
Assembled cooling flap assembly
Details
11-01-2022
6.00
Assembled and attached front landing gear
Details
10-14-2022
4.00
Attached engine mount and cleaned up some wiring.
Details
10-08-2022
6.00
Reinstalled instruments and 1st power test.
Details
10-03-2022
4.00
Started the FlyEFII Bus Manager Installation
Details
10-02-2022
2.50
Fabricated GPS antenna mount doubler
Details
10-01-2022
60.00
Nearly finished with wiring
Details
05-31-2022
1.00
test
05-30-2022
12.00
Continued landing gear and wheel fairing fitting
Details
05-13-2022
10.00
Started gear and wheel fairing fitting
Details
05-05-2022
12.00
Main Landing gear installation
Details
01-10-2022
10.00
Installing misc avionics components
Details
01-07-2022
6.00
Additional panel work
Details
01-03-2022
4.00
Preliminary seat design
Details
12-30-2021
9.00
Instrument Panel Work
Details
10-18-2021
12.00
Started instrument panel design and fabrication
Details
10-16-2021
6.00
Prepared landing gear components
Details
09-27-2021
8.00
Seat frame assembly and start of top forward skin
Details
09-17-2021
3.00
Final fitting of canopy
Details
09-15-2021
14.00
Finished build up of fiberglass transition of cano
Details
08-30-2021
4.00
Added dyed fiberclass strips to the canopy skin jo
Details
08-28-2021
4.00
Added Epoxy/microballoon filler to canopy/fuse joi
Details
08-15-2021
6.00
Built and mounted fuselage on a rotisserie
Details
08-13-2021
5.00
Assembling and test fitting canopy frame
Details
08-06-2021
5.00
Continued assembly of the canopy frame
Details
07-24-2021
6.00
Putting together the forward part of the canopy fr
Details
06-24-2021
5.00
Preparing parts for forward canopy frame
Details
06-21-2021
4.00
Added access panels for access to subpanel
Details
06-19-2021
4.00
Installed canopy latching mechanism
Details
06-18-2021
7.00
Rear window fitted
Details
06-17-2021
5.00
Added subpanel and main panel assemblies
Details
06-15-2021
6.00
Painted interior, Added pitch AP servo
Details
06-02-2021
7.00
Installed rudder/brake pedals and flap motor
Details
05-30-2021
9.00
Fuel lines in fuselage
Details
05-23-2021
5.00
More soundproofing
Details
05-19-2021
6.00
Added soundproofing and baggage area floor
Details
04-11-2021
5.00
Assembled the roll-over bar
Details
04-06-2021
7.00
Roll over bar prep.
Details
03-28-2021
5.00
Elevator push/pull rods and bellcrank
Details
03-26-2021
4.00
Forward fuselage parts
Details
03-16-2021
3.00
Assembled subpanel components
Details
03-08-2021
4.00
Preparing subpannel parts
Details
02-27-2021
5.00
Fitted firewall insulation and added master cylind
Details
02-23-2021
2.50
Assembled rudder pedals
Details
02-21-2021
9.00
Preparing inner deck and rudder pedal parts
Details
02-15-2021
6.00
Attached empanage to fuselage
Details
02-03-2021
4.00
Preparing to join fuselage to empanage
Details
01-23-2021
5.00
Installed seat back suport rail assembly
Details
01-03-2021
7.50
Riveted right side fuselage skin
Details
12-20-2020
7.00
Prepared the right side fuselage skin
Details
12-06-2020
8.00
Riveted left side fuselage skin
Details
11-28-2020
6.00
Continued preparing fuselage parts that attach to
Details
11-24-2020
5.00
Preparing left side fuselage skin and components
Details
11-19-2020
4.00
Preparing for side skin attach
Details
11-17-2020
4.00
Prepared upper and lower longerons
Details
11-08-2020
7.00
Connecting mid fuselage to firewall section
Details
10-23-2020
6.00
Joined 2 parts of lower fuselage
Details
10-11-2020
5.00
Finished firewall section of the plans...
Details
10-09-2020
3.00
Forward bottom fuselage
Details
10-05-2020
7.00
Firewall continued
Details
10-03-2020
4.00
Firewall continued
Details
10-01-2020
2.50
Firewall continued
Details
09-29-2020
3.00
Firewall continued
Details
09-27-2020
5.00
More firewall parts
Details
09-25-2020
3.50
Prepared parts for the firewall tunnel assembly
Details
09-24-2020
5.00
Firewall Parts prepped and assembed
Details
09-21-2020
3.50
Mid fuse bottom skin is on
Details
09-11-2020
1.50
Mid fuselage continued
Details
09-10-2020
1.50
Mid fuselage continued
Details
09-09-2020
5.00
Mid fuselage continued
Details
09-05-2020
3.00
Mid fuselage continued
Details
08-29-2020
3.50
Continued mid fuselage assembly
Details
08-26-2020
3.00
Continued mid fuselage assembly
Details
08-22-2020
4.50
Prepared parts for the deck of the main seating ar
Details
08-20-2020
4.00
Mid fuselage deck components
Details
08-15-2020
4.50
Forward Mid Fuselage Bulkheads continued
Details
08-09-2020
4.00
Forward Mid Fuselage Bulkheads
Details
08-01-2020
4.50
Started fuselage assembly
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
263
1575
Avionics
2
60
Empennage
59
200
Engine
6
34
Fuselage
97
626
Miscellaneous
35
304
Wings
64
351