KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
Work Logs Found: 43
Category Work Time: 84 Hours
 Date
Hours
Work Log Summary

Details

 09-15-2021
1.00
5th bearing oil line
Details
       

 09-15-2021
1.00
5th bearing AN oil fitting
Details
       

 05-22-2021
4.50
Prep Engine for prime and paint
Details
       

 05-21-2021
1.50
Prep to install the oil pump housing
Details
       

 05-21-2021
0.50
Final Torque of oil pump cover
Details
       

 05-21-2021
1.00
5th Bearing oil seal install
Details
       

 05-13-2021
1.50
Prep for 5th bearing install
Details
       

 05-13-2021
1.00
Finished 5th bearing install
Details
       

 05-13-2021
2.00
Drilling new pin holes thru 5th bearing
Details
       

 05-13-2021
1.00
Checking 5th bearing runout.
Details
       

 05-07-2021
1.00
Torqing the case bolts
Details
       

 05-07-2021
1.50
putting cam in case half
Details
       

 05-07-2021
0.50
Fitting crank and cam into case half
Details
       

 05-07-2021
1.50
closing case halves
Details
       

 05-07-2021
0.50
Case halves bolted and torqued.
Details
     

 05-07-2021
0.50
Cam & crank alignment
Details
       

 05-02-2021
0.75
Plastigage test prep.
Details
       

 05-02-2021
1.00
Plastigage test and case storage.
Details
       

 05-02-2021
0.50
Plastigage check
Details
       

 05-02-2021
0.50
Main Bearings verification
Details
       

 05-02-2021
0.50
Installing oil galley plugs
Details
       

 05-02-2021
1.00
Installing bushing plugs for 5th bearing
Details
       

 05-02-2021
0.25
Documenting Main bearing numbers
Details
       

 05-02-2021
0.25
Bagging The engine for short storage
Details
     

 09-30-2020
2.50
Dip stick tube clamp
Details
       

 09-28-2020
1.50
OIl pump primer tool
Details
     

 09-23-2020
2.50
Modifying Valve covers for Corvair
Details
       

 09-15-2020
1.50
Torq testing head studs
Details
       

 08-29-2020
1.50
Installing replacement head studs
Details
     

 08-16-2020
3.50
Fitting the oil filler neck to Valve cover
Details
       

 08-16-2020
0.50
Cutting Filler neck
Details
     

 08-15-2020
2.50
Tapping hole for Keen sert
Details
       

 08-15-2020
2.00
Keen-sert hole prep
Details
       

 08-15-2020
3.00
Hole prep for Keen-sert
Details
       

 08-08-2020
3.50
Stuck Head Stud
Details
       

 08-02-2020
4.00
Cleaning threads & install head studs
Details
       

 07-11-2020
3.00
Chasing holes and pulling studs
Details
       

 07-11-2020
3.00
Chasing all the threads in the engine case
Details
       

 07-04-2020
14.00
engine inspection
Details
       

 07-03-2020
5.00
cleaning engin oil passages
Details
       

 06-27-2020
2.00
engine teardown, pull harmonic balancer
Details
       

 06-27-2020
1.50
Engine Teardown / remove cylinders
Details
       

 06-27-2020
1.50
Clean crank and split case
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.