KitLog pro

Powered By Kitlog Pro v2.0

ULAY'S WEB SITE
Work Logs Found: 59
Category Work Time: 318 Hours
 Date
Hours
Work Log Summary

Details

 05-26-2019
2.00
oops
Details
       

 02-19-2019
4.00
Riveted the aft top skin on the empennage
Details
       

 02-15-2019
1.00
Pitch trim servo
Details
     

 02-15-2019
1.00
Conduit
Details
     

 01-21-2019
0.50
Installed static line
Details
     

 01-01-2019
5.00
Fabricated ADAHARS shelf
Details
       

 12-07-2018
5.00
NACA vent and static port
Details
       

 12-01-2018
5.00
NACA vents
Details
       

 11-25-2018
3.50
Pushrod assembly
Details
       

 11-21-2018
3.00
Trim bellcrank, servo and cable attachment
Details
     

 11-15-2018
3.00
Trim mount bracked
Details
       

 11-13-2018
5.50
Frabrication
Details
     

 11-12-2018
5.00
Fabrication
Details
     

 11-10-2018
2.00
Hardware installation
Details

 11-08-2018
5.00
Riveting aft deck
Details

 11-07-2018
8.00
Riveting side and bottom skins
Details
       

 11-04-2018
2.00
Cont'd riveting side skins and lower forward skin
Details

 11-03-2018
2.00
Riveting of bulkheads and frames con'td
Details

 11-01-2018
3.00
Riveting side skins to frames and bulkheads
Details
     

 11-01-2018
4.00
Finished riveting side skins and lower forward sk
Details

 10-31-2018
6.00
Cont'd riveting side skins and lower forward skin
Details

 10-30-2018
3.00
Cont'd riveting side skins and lower forward skin
Details

 10-29-2018
3.00
Cont'd riveting side skins and lower forward skin
Details

 10-28-2018
2.00
Match drilled the forward top skin and stiffeners
Details
     

 10-28-2018
5.00
Began riveting stiffeners to side skins and lower
Details
 

 10-24-2018
10.00
Reassembled the entire tail cone in preparation fo
Details
       

 10-23-2018
3.00
Riveting bulkheads and frames
Details

 10-22-2018
1.00
Riveting nutplates to skins for cover plates
Details

 10-21-2018
2.00
Riveting aft bulkheads
Details
       

 10-13-2018
8.00
Dimpling Skins and bulkheads
Details
     

 10-09-2018
6.00
Dimpling and MCS stiffeners and bulkheads.
Details

 09-30-2018
10.00
Disassembly of entire empennage for deburring and
Details
       

 09-24-2018
4.00
Prep for shoulder harness anchors and fabing cover
Details

 09-21-2018
2.00
Riveting bulkheads
Details
       

 09-17-2018
6.00
Drilling aft deck
Details
     

 09-15-2018
4.00
Match drilling top skin stiffeners
Details

 09-14-2018
4.00
Fabrication support bars and elevator stops
Details
     

 09-13-2018
4.00
Clecoing aft top skin and stiffeners
Details
       

 09-11-2018
8.00
More assembly of skins and bulkheads and aft deckj
Details
       

 09-10-2018
8.00
Initial assembly of skins, stiffeners and bulkhead
Details

 09-08-2018
10.00
Clecoing the bulkheads, stiffeners, bottom and sid
Details
       

 09-07-2018
8.00
Fabrication
Details

 09-02-2018
4.00
Fabrication
Details

 09-01-2018
3.00
Fabrication
Details

 08-31-2018
5.00
Fabrication
Details

 06-20-2018
8.00
Finishing rudder and elevator leading edge rolling
Details
       

 06-19-2018
8.00
Match drilling the trim tab hinge
Details
       

 06-19-2018
8.00
Completing vertical stabilizer
       

 06-18-2018
8.00
Riveting rear spar of horizontal stabilizer
Details
       

 06-18-2018
8.00
Riveting front spar and nose ribs to skin
Details
       

 06-15-2018
8.00
Vertical Stabalizer rear spar
Details
       

 06-15-2018
8.00
Constructing front and rear spar assemblies
Details
       

 06-14-2018
16.00
Horizontal stabilizer
Details
       

 06-13-2018
16.00
Elevators cont
Details
       

 06-12-2018
8.00
Rudder skin and counter balance
Details
       

 06-12-2018
8.00
Building elevators
Details
       

 06-11-2018
4.00
Rudder spar and horn
Details
       

 06-11-2018
4.00
Rudder construction
Details
       

 06-11-2018
8.00
Assembling rudder cont
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.