Powered By Kitlog Pro v2.0
ULAY'S WEB SITE
RV-10
Empennage
Work Logs Found:
59
Category Work Time:
318 Hours
Date
Hours
Work Log Summary
Details
05-26-2019
2.00
oops
Details
02-19-2019
4.00
Riveted the aft top skin on the empennage
Details
02-15-2019
1.00
Pitch trim servo
Details
02-15-2019
1.00
Conduit
Details
01-21-2019
0.50
Installed static line
Details
01-01-2019
5.00
Fabricated ADAHARS shelf
Details
12-07-2018
5.00
NACA vent and static port
Details
12-01-2018
5.00
NACA vents
Details
11-25-2018
3.50
Pushrod assembly
Details
11-21-2018
3.00
Trim bellcrank, servo and cable attachment
Details
11-15-2018
3.00
Trim mount bracked
Details
11-13-2018
5.50
Frabrication
Details
11-12-2018
5.00
Fabrication
Details
11-10-2018
2.00
Hardware installation
Details
11-08-2018
5.00
Riveting aft deck
Details
11-07-2018
8.00
Riveting side and bottom skins
Details
11-04-2018
2.00
Cont'd riveting side skins and lower forward skin
Details
11-03-2018
2.00
Riveting of bulkheads and frames con'td
Details
11-01-2018
3.00
Riveting side skins to frames and bulkheads
Details
11-01-2018
4.00
Finished riveting side skins and lower forward sk
Details
10-31-2018
6.00
Cont'd riveting side skins and lower forward skin
Details
10-30-2018
3.00
Cont'd riveting side skins and lower forward skin
Details
10-29-2018
3.00
Cont'd riveting side skins and lower forward skin
Details
10-28-2018
2.00
Match drilled the forward top skin and stiffeners
Details
10-28-2018
5.00
Began riveting stiffeners to side skins and lower
Details
10-24-2018
10.00
Reassembled the entire tail cone in preparation fo
Details
10-23-2018
3.00
Riveting bulkheads and frames
Details
10-22-2018
1.00
Riveting nutplates to skins for cover plates
Details
10-21-2018
2.00
Riveting aft bulkheads
Details
10-13-2018
8.00
Dimpling Skins and bulkheads
Details
10-09-2018
6.00
Dimpling and MCS stiffeners and bulkheads.
Details
09-30-2018
10.00
Disassembly of entire empennage for deburring and
Details
09-24-2018
4.00
Prep for shoulder harness anchors and fabing cover
Details
09-21-2018
2.00
Riveting bulkheads
Details
09-17-2018
6.00
Drilling aft deck
Details
09-15-2018
4.00
Match drilling top skin stiffeners
Details
09-14-2018
4.00
Fabrication support bars and elevator stops
Details
09-13-2018
4.00
Clecoing aft top skin and stiffeners
Details
09-11-2018
8.00
More assembly of skins and bulkheads and aft deckj
Details
09-10-2018
8.00
Initial assembly of skins, stiffeners and bulkhead
Details
09-08-2018
10.00
Clecoing the bulkheads, stiffeners, bottom and sid
Details
09-07-2018
8.00
Fabrication
Details
09-02-2018
4.00
Fabrication
Details
09-01-2018
3.00
Fabrication
Details
08-31-2018
5.00
Fabrication
Details
06-20-2018
8.00
Finishing rudder and elevator leading edge rolling
Details
06-19-2018
8.00
Match drilling the trim tab hinge
Details
06-19-2018
8.00
Completing vertical stabilizer
06-18-2018
8.00
Riveting rear spar of horizontal stabilizer
Details
06-18-2018
8.00
Riveting front spar and nose ribs to skin
Details
06-15-2018
8.00
Vertical Stabalizer rear spar
Details
06-15-2018
8.00
Constructing front and rear spar assemblies
Details
06-14-2018
16.00
Horizontal stabilizer
Details
06-13-2018
16.00
Elevators cont
Details
06-12-2018
8.00
Rudder skin and counter balance
Details
06-12-2018
8.00
Building elevators
Details
06-11-2018
4.00
Rudder spar and horn
Details
06-11-2018
4.00
Rudder construction
Details
06-11-2018
8.00
Assembling rudder cont
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
91
476
Avionics
1
4
Empennage
59
318
Fuselage
25
118
Modifications
6
36
Copyright © 2001-2024 Matronics. All Rights Reserved.