Powered By Kitlog Pro v2.0
MIKE'S WEB SITE
RV-14A
Empennage
Work Logs Found:
16
Category Work Time:
36 Hours
Date
Hours
Work Log Summary
Details
01-11-2021
1.00
Finished Up Tail Fairings
Details
10-07-2020
1.00
Trimmed cured glass and mixed flox to fill recesse
Details
10-06-2020
2.00
Mixed up epoxy and laid fiberglass in fairings
Details
10-05-2020
2.00
Attached elevator fairings and sized HS fairing ti
Details
10-02-2020
2.00
Prepped HS fairings.
Details
10-01-2020
3.00
Rudder top fairing
Details
09-30-2020
2.00
Rudder bottom fairing nutplates
Details
09-28-2020
3.00
Began Chpt 12...Installing fairings
Details
09-22-2020
2.00
Assembled HS with elevators
Details
09-22-2020
0.50
Details
07-24-2020
3.00
Fabricated counterweights
Details
07-23-2020
2.00
Rolled leading edge of right elevator
Details
05-28-2020
5.50
Vertical Stabilizer Complete
Details
05-28-2020
0.00
Vertical Stabilizer
04-13-2020
3.00
The build begins
Details
04-04-2020
4.00
Inventory
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
137
390
Aft Fuselage
37
98
Baggage Area
5
19
Brakes
6
14
Elevators
29
84
Empennage
16
36
Fuel System
1
2
Horizontal Stabilize
17
61
Miscellaneous
2
3
Rudder
15
47
Shop Supplies
2
6
Tools
2
4
Vertical Stabilizer
5
16
Copyright © 2001-2024 Matronics. All Rights Reserved.