KitLog pro

Powered By Kitlog Pro v2.0

Safari Helicopter Construction
Work Logs Found: 40
Category Work Time: 166 Hours
 Date
Hours
Work Log Summary

Details

 05-29-2010
4.00
Modification of Fuel Tank Caps
Details
       

 09-05-2008
4.00
Installing Cabin Heat Box/Tubing
Details
       

 08-15-2008
3.00
Mounting Cabin Heat Box
Details
       

 08-04-2008
7.50
Installing Carb Heat Selector Box
Details
       

 08-03-2008
2.25
Adding Nutplates to Heat Collector
Details
       

 08-02-2008
3.25
Modification of Heat Collector
Details
       

 06-14-2008
1.50
Remounted Exhaust
Details
     

 04-19-2008
3.00
Installing Exhaust System
Details
       

 04-12-2008
3.50
Carb Heat/Filter Box Inlet Hose Adapter
Details
       

 04-06-2008
4.50
Secured Fuel Tank Wire Bundles
Details
       

 03-23-2008
8.50
Routing Engine Lines
Details
       

 03-22-2008
4.50
Mounting of Oil Sump
Details
       

 03-16-2008
10.00
Installed Ignition Harness
Details
       

 03-15-2008
4.00
Installing Intake Runners and Manifold pressure Li
Details
       

 03-09-2008
2.50
Installing the Intake Manifold Runners
Details
       

 03-09-2008
4.00
Installation of Oil Cooler
Details
       

 02-17-2008
2.00
Mounting of Carb
Details
       

 02-17-2008
2.25
Installing the Fuel Shut-off Valve and Gascolator
Details
       

 02-16-2008
3.25
Fuel Tank Installation
Details
       

 01-16-2008
2.00
Installation of Mixture Control
Details
       

 08-12-2007
6.00
Prep and Installation of Engine
Details
       

 08-11-2007
2.00
Shimming Fuel Control valve
Details
       

 08-11-2007
4.00
Fuel Shut-off Valve Placard
Details
       

 08-10-2007
4.50
Extension for Fuel Shut-off Valve
Details
       

 06-26-2007
3.50
Vacuum Forming Shroud Cut-outs (Part 3)
Details
       

 06-25-2007
4.50
Vacuum Forming Shroud Cut-outs (Part 2)
Details
       

 06-24-2007
3.50
Vacuum Forming Shroud Cut-outs (Part 1)
Details
       

 06-23-2007
6.50
Engine Shroud Cut-outs (Molding)
Details
       

 06-18-2007
4.00
Shroud Cut-outs
Details
       

 06-09-2007
5.00
First Installation of Engine
Details
       

 06-09-2007
2.50
Ceramic Coating of Exhaust System
Details
       

 06-04-2007
4.50
Installing Ignition Wire Seals In Bottom of Shroud
Details
       

 06-03-2007
5.50
Modification of Bottom Engine Shroud Pieces
Details
       

 06-03-2007
2.50
Determining Routing of Ignition Leads
Details
       

 05-25-2007
7.50
Engine Cooling Shroud Fitting
Details
       

 05-24-2007
4.50
Oil Sump Cover
Details
       

 05-19-2007
7.00
Engine Valve Cover Modifications
Details
       

 04-26-2007
2.00
New Engine Arrives!
Details
       

 12-04-2006
6.00
Fabricated Engine Stand
Details
     

 02-16-2006
1.50
Assembled Cooling Shroud for test fit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.