Powered By Kitlog Pro v2.0
Darrel's Kitfox - SS7
DEW2
Wings
Work Logs Found:
64
Category Work Time:
228 Hours
Date
Hours
Work Log Summary
Details
06-11-2020
1.00
Installed the wing drains
Details
05-24-2020
5.10
Installation of aero fairings on lift struts
Details
05-23-2020
3.10
More lift strut fairing work
Details
05-22-2020
2.50
Started installation of the aero fairings on the l
Details
12-11-2018
2.50
Applied 2nd coat of varnish
Details
12-04-2018
2.10
Fit landing light
Details
12-02-2018
4.50
Completed pitot tube install and installed the mag
Details
12-01-2018
5.20
Installed strengthening additions to the trailing
Details
11-28-2018
6.00
Removed flaperons and started magnetometer install
Details
11-27-2018
2.30
Completed install of right flaperon
Details
11-24-2018
5.80
Install flaperon mounting reinforcement
Details
11-23-2018
2.00
Final drill and alodine flaperon reinforcement
Details
11-22-2018
6.50
Bellcrank install, begin flaperon install
Details
11-21-2018
1.90
Continued assemblying flaperon bellcranks
Details
11-20-2018
4.00
Began flaperon belcrank assembly
Details
11-19-2018
3.50
Finished the mass balance and built pitot tube
Details
11-18-2018
2.10
Installed mass balance weights
Details
11-17-2018
1.70
Began fitting mass balance
Details
11-16-2018
3.50
Finished ends of flaperons
Details
11-15-2018
5.60
Rivet trailing edge, add end rib
Details
11-13-2018
4.80
Finished NSP light install and rivet flaperon
Details
11-09-2018
4.50
More on preparing the wings for covering
Details
11-08-2018
6.10
Finished wing tips and contoured fuel tanks
Details
11-07-2018
3.10
Wing tip prep and contour improvement
Details
11-06-2018
2.30
More wing profiling and tip preparation
Details
11-03-2018
4.00
Contoured rib profile and more work on tip
Details
11-01-2018
3.50
Install left wing leading edge
Details
10-31-2018
1.00
Installed the leading edge, right wing
Details
10-29-2018
2.00
Prepped leading edge extrusion
Details
10-28-2018
1.50
Rough fit leading edges
Details
10-27-2018
3.00
Installed trailing edge pieces
Details
10-25-2018
2.50
Installed the end rib standoff/supports
Details
10-20-2018
2.50
Installed false ribs under fuel tanks
Details
10-17-2018
3.10
Installed thel #2 Ribs
Details
10-16-2018
2.00
Fitted #2 ribs
Details
10-14-2018
2.00
Varnish and tank install
Details
10-12-2018
6.50
Install fuel tanks and varnsh coat #2
10-11-2018
7.00
Fuel tank final fitting and fuel backing plates
Details
10-10-2018
1.50
Continued installation of fuel tanks
Details
10-09-2018
5.50
Completed fuel tank install and leak checked right
Details
10-08-2018
3.50
More work on fuel tanks, varnish prep and instrume
Details
10-07-2018
0.75
More sanding
Details
10-06-2018
1.50
Trimmed and fitted tanks and sanded ribs
Details
10-05-2018
1.50
Started fitting the fuel tanks
Details
10-03-2018
2.50
The last of varnish activity
Details
10-02-2018
3.00
More on the varnishing front
Details
10-01-2018
4.50
More epoxy varnishing
Details
09-25-2018
1.00
Installed bottom false ribs
Details
09-24-2018
5.30
Install false ribs
Details
09-23-2018
1.50
Fabricated and installed reinforcement strip
Details
09-22-2018
5.50
Installed jury struts
Details
09-19-2018
1.00
Bond #1 ribs
Details
09-17-2018
6.00
Installed wings and set root rib
Details
09-15-2018
4.50
Rough install #1 and root ribs
Details
09-14-2018
7.30
Finished install of wing strut attach brackets
Details
09-13-2018
4.50
Finish install of forward strut attach right wing
Details
09-12-2018
5.00
Set up and drilled strut attach brackets
Details
09-11-2018
6.00
Final fit of the spar attach fittings
Details
09-10-2018
4.50
Fixed the mistake
Details
09-09-2018
3.00
Re-did the wing set up
Details
09-08-2018
6.00
Wing install and begin jigging
Details
09-07-2018
3.90
Added strut mount weldments and completed tires
Details
09-06-2018
4.00
Set up for wing rigging
Details
08-24-2018
2.00
Prepped the wing struts for installation
Details
SITE NAVIGATION
Contact Builder
H-5 Home
DEW2 Home
Category
# Logs
# Hours
All
645
3091
Avionics
39
154
Basic Kit
3
14
Empennage
25
214
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
701
Inspection
1
1
Kitfox Avionics
39
154
Kitfox tooling
6
14
Kitfox Undercarriage
11
45
Kitfox wings
64
389
Lighting
2
12
Miscellaneous
26
111
Modifications
11
21
Paint System
86
330
Tooling
2
0
Tooling
6
14
Tools
2
0
Undercarriage
11
45
Wings
2
5
Wings
64
389
Copyright © 2001-2024 Matronics. All Rights Reserved.