Powered By Kitlog Pro v2.0
Mark Weitkamp CX4
CX4
Control system
Work Logs Found:
24
Category Work Time:
133 Hours
Date
Hours
Work Log Summary
Details
02-18-2023
8.00
finally got all four aileron control rods cut into
Details
02-17-2023
4.00
cutting metal for aileron control rods
Details
02-15-2023
6.00
continued baby steps on aileron controls
Details
02-14-2023
7.00
aileron belcranks in final form
Details
02-13-2023
6.00
moving forward with aileron controls
Details
02-12-2023
4.00
left side aileron
Details
02-10-2023
6.00
aileron control rods
Details
02-04-2023
6.00
more struggles with aileron pushrods
Details
02-03-2023
6.00
mockup of aileron control pushrods in wooden dowel
Details
02-02-2023
6.00
aileron controls and fuel tank fitting
Details
01-24-2023
7.00
rudder pedal subassembly rivetted, cables connecte
Details
01-23-2023
7.00
pedals clecoed into place
Details
01-22-2023
4.00
fine tuning the attachment of master cylinder
Details
01-21-2023
6.00
modelling multiple approaces to rudder/brake insta
Details
01-20-2023
3.00
rudder pedal / brake pedal inventory
Details
11-02-2022
1.00
working on control system
Details
05-31-2020
5.00
working on elevator pushrod and rudder cables
Details
05-29-2020
8.00
working control system
Details
05-20-2020
8.00
left side brake cable installed
Details
04-19-2020
3.00
continued work on control stick and rudder pedals
Details
04-13-2020
6.00
continued work on brake pedals and MM 3.0
Details
04-10-2020
6.00
cutting out brake pedal toe brakes
Details
04-09-2020
6.00
Welding on rudder pedals and control stick belcran
Details
04-06-2020
4.00
Welding on rudder pedals and belcrank
Details
SITE NAVIGATION
Contact Builder
CX4 Home
Category
# Logs
# Hours
All
504
2592
Control system
24
133
cylinder baffling, p
26
93
Empennage
44
216
Engine
41
223
engine cowling
86
365
fixtures and forms
17
86
Fuel System
3
13
Fuselage
57
390
Landing Gear
7
54
Miscellaneous
20
81
paperwork for regist
1
100
Time spent on projec
4
24
Wings
174
814
Copyright © 2001-2024 Matronics. All Rights Reserved.