KitLog pro

Powered By Kitlog Pro v2.0

LAUREN'S WEB SITE
Work Logs Found: 37
Category Work Time: 298 Hours
 Date
Hours
Work Log Summary

Details

 06-28-2021
10.00
flapperon final install
       

 02-12-2021
4.00
painting lift struts
Details
       

 02-05-2021
4.00
Gluing to lift strut
Details
     

 01-29-2021
7.00
Lift strut fairing covers
Details
       

 01-22-2021
8.00
Freedom of movement test post covering
Details
       

 01-08-2021
5.00
left wing tip fences
Details
       

 01-01-2021
4.00
PVC lift struts
Details
       

 12-25-2020
12.00
PVC lift strut fairings
Details
       

 12-18-2020
12.00
Paint rib roots/fuel placards
Details
       

 12-11-2020
6.00
Sanding and painting of stall fences
Details
       

 12-04-2020
7.00
Covering tip in Oratex
Details
     

 11-27-2020
8.00
match drilling and mounting tips
Details
       

 11-13-2020
4.00
filling of wing tip edges
Details
     

 11-06-2020
6.00
wing tip mounting brackets
Details
     

 10-23-2020
7.00
Rib stitching left wing
Details
     

 10-16-2020
30.00
Left wing Top and Bottom blanker
Details
       

 10-15-2020
4.00
pitot tube and tubing mounting
Details
     

 10-09-2020
8.00
Rib stitching right wing
Details
       

 10-02-2020
12.00
right wing top blanket
Details
       

 09-25-2020
10.00
right wing bottom blanket
Details
       

 09-18-2020
6.00
rigging and fitting right wing Flapperon
Details
       

 07-06-2020
6.00
STi wingtip/stall fence
Details
       

 07-04-2020
5.00
Flapperon reinforcement brackets
Details
       

 06-30-2020
10.00
Laker edge final install
Details
       

 06-29-2020
3.00
filler neck drain
Details
     

 06-27-2020
8.00
Laker leading edge
Details
       

 06-21-2020
4.00
rib 1-3 trailing edge
Details
     

 06-19-2020
8.00
fuel tank false ribs and #2 rib
Details
       

 06-17-2020
12.00
bottom false ribs
Details
       

 06-06-2020
10.00
sloshing and install of fuel tanks
Details
       

 06-04-2020
20.00
varnish all wood ribs
Details
       

 05-27-2020
6.00
Jury Struts
Details
       

 05-12-2020
5.00
transition ribs
Details
       

 05-09-2020
6.00
#1 rib installed
Details
       

 05-08-2020
12.00
attachment of lift strust brackets
Details
       

 05-05-2020
4.00
Verifying sweep, dihedral, and was in/out
Details
       

 05-03-2020
5.00
spar reenforcements
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.