Powered By Kitlog Pro v2.0
Norris's RV Construction
RV10
10 Avionics
Work Logs Found:
51
Category Work Time:
293 Hours
Date
Hours
Work Log Summary
Details
05-11-2022
2.00
Rewired the Alt switches so a not to drain the bat
04-21-2022
4.00
Bundle the wireing
04-20-2022
8.00
tying down wireing
04-05-2022
4.00
Finished avionics for now
04-04-2022
8.00
Troubleshooting avionics
03-30-2022
8.50
center stack
03-29-2022
8.50
Finished installing and started configuring avioni
03-28-2022
10.00
Continue wireing the two ifr gps's
03-25-2022
7.00
Continue wireing both GPS's
03-24-2022
4.00
Continue wireing up the GPS's
03-23-2022
8.00
Wireing up the GTRN650xi
03-22-2022
3.00
Working on GPS install
03-10-2022
2.00
Made lending connections for com and nav ant
02-07-2022
7.50
Working on the center stacjk
02-04-2022
3.00
Install AOA display
02-03-2022
4.00
Installed PFD, Finished hidden Battery and VPS con
02-02-2022
5.00
Create and install battery charge and VPX portals
01-30-2022
2.00
Finished installing the baggage light system
12-14-2021
4.00
sealing, wireing, and connecting GPS antennas
08-26-2021
9.00
Details
02-05-2021
4.50
Wireing the System 32
02-03-2021
2.00
CVontionue wiring in the System 32 EFII
12-30-2020
4.00
Made a new magnetometer base and installed
12-22-2020
6.00
Installed the wireing for the OATs and Magnetomete
12-21-2020
1.50
Wiring up the two Magnetometers
12-15-2020
1.50
Figuring out mounting for the two Magnetometers
12-03-2020
7.00
Backup power
Details
06-16-2020
6.00
Finished all connections to transponder except ant
06-15-2020
5.00
See Detailed
Details
06-09-2020
5.00
Finished wiring all that I could and started on pa
06-08-2020
6.00
Ordering parts and continuing wireing
06-05-2020
6.00
Wireing RS232 connections
06-04-2020
6.00
Continue wiring CAN buss
06-02-2020
3.00
Finish installing the wiring from the sticks
06-01-2020
5.00
Made a wire loom for Pilot and Co Pilot sticks
05-26-2020
8.00
FWF wires
Details
05-22-2020
5.00
Continue wiring up switches
05-21-2020
8.00
Details
05-20-2020
9.00
See full description
Details
05-18-2020
9.00
See detailed description
Details
05-15-2020
9.00
continued avionics wiring
05-13-2020
9.00
Wireing Alternator and Bus manager
05-12-2020
5.00
Installed a firewall pass thru plus
Details
05-11-2020
7.00
Finished fuel pump wireing
05-08-2020
6.00
Started working on fuel pump wireing
05-05-2020
3.00
Connect flaps power and position sensor
05-01-2020
8.00
Installed Rudder tPanel uprim actuator wiring.
04-30-2020
8.00
Continue wiring panel
04-29-2020
7.00
Wired up contactors. Installed master and Bat sel
04-28-2020
4.00
installed VPX. Installed panel.
04-27-2020
8.00
panel work
Details
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
649
3556
10 Avionics
51
293
10 DeIce
58
310
10 Empennage
58
239
10 Engine
8
39
10 Finish Kit
6
24
10 Firewall Forward
82
446
10 Fuselage
180
977
10 Inspection
3
8
10 Interior
22
128
10 Miscellaneous
23
116
10 Paint
35
175
10 Rear Fuselage
27
104
10 Wings
95
527
De Ice
1
170
RV14a Home
Copyright © 2001-2024 Matronics. All Rights Reserved.