Norris's RV Construction
Work Logs Found: 51
Category Work Time: 293 Hours
 Date
Hours
Work Log Summary

Details

 05-11-2022
2.00
Rewired the Alt switches so a not to drain the bat

 04-21-2022
4.00
Bundle the wireing

 04-20-2022
8.00
tying down wireing

 04-05-2022
4.00
Finished avionics for now

 04-04-2022
8.00
Troubleshooting avionics

 03-30-2022
8.50
center stack

 03-29-2022
8.50
Finished installing and started configuring avioni
     

 03-28-2022
10.00
Continue wireing the two ifr gps's

 03-25-2022
7.00
Continue wireing both GPS's

 03-24-2022
4.00
Continue wireing up the GPS's

 03-23-2022
8.00
Wireing up the GTRN650xi

 03-22-2022
3.00
Working on GPS install

 03-10-2022
2.00
Made lending connections for com and nav ant

 02-07-2022
7.50
Working on the center stacjk

 02-04-2022
3.00
Install AOA display

 02-03-2022
4.00
Installed PFD, Finished hidden Battery and VPS con

 02-02-2022
5.00
Create and install battery charge and VPX portals

 01-30-2022
2.00
Finished installing the baggage light system
     

 12-14-2021
4.00
sealing, wireing, and connecting GPS antennas

 08-26-2021
9.00

Details

 02-05-2021
4.50
Wireing the System 32

 02-03-2021
2.00
CVontionue wiring in the System 32 EFII

 12-30-2020
4.00
Made a new magnetometer base and installed

 12-22-2020
6.00
Installed the wireing for the OATs and Magnetomete
     

 12-21-2020
1.50
Wiring up the two Magnetometers
     

 12-15-2020
1.50
Figuring out mounting for the two Magnetometers

 12-03-2020
7.00
Backup power
Details

 06-16-2020
6.00
Finished all connections to transponder except ant

 06-15-2020
5.00
See Detailed
Details

 06-09-2020
5.00
Finished wiring all that I could and started on pa
       

 06-08-2020
6.00
Ordering parts and continuing wireing

 06-05-2020
6.00
Wireing RS232 connections

 06-04-2020
6.00
Continue wiring CAN buss

 06-02-2020
3.00
Finish installing the wiring from the sticks

 06-01-2020
5.00
Made a wire loom for Pilot and Co Pilot sticks
     

 05-26-2020
8.00
FWF wires
Details

 05-22-2020
5.00
Continue wiring up switches

 05-21-2020
8.00

Details

 05-20-2020
9.00
See full description
Details

 05-18-2020
9.00
See detailed description
Details
       

 05-15-2020
9.00
continued avionics wiring

 05-13-2020
9.00
Wireing Alternator and Bus manager

 05-12-2020
5.00
Installed a firewall pass thru plus
Details

 05-11-2020
7.00
Finished fuel pump wireing

 05-08-2020
6.00
Started working on fuel pump wireing

 05-05-2020
3.00
Connect flaps power and position sensor

 05-01-2020
8.00
Installed Rudder tPanel uprim actuator wiring.
       

 04-30-2020
8.00
Continue wiring panel

 04-29-2020
7.00
Wired up contactors. Installed master and Bat sel

 04-28-2020
4.00
installed VPX. Installed panel.

 04-27-2020
8.00
panel work
Details