Powered By Kitlog Pro v2.0
Bob's RV-8 Build Site
RV-8
Engine
Work Logs Found:
138
Category Work Time:
373 Hours
Date
Hours
Work Log Summary
Details
07-30-2024
1.10
Fabricate Panel for Front Baffle
Details
01-02-2024
2.70
Right Pmag Blast Tube & Cowl Pins
Details
01-01-2024
1.20
Pmag Blast Tubes
Details
12-31-2023
1.20
Pmag Blast Tube and Cowl Pin Covers
Details
12-30-2023
0.00
Firewall Forward Items #2 (Cont)
Details
12-30-2023
4.80
Firewall Forward Items #2
Details
12-29-2023
0.00
Firewall Forward Items #1 - (cont)
Details
12-29-2023
6.10
Firewall Forward Items #1
Details
12-28-2023
0.00
Mixture Cable
Details
12-28-2023
2.70
Cowl fitting, Baffle Seals, and Mixture Cable
Details
12-02-2023
4.10
Exhaust Hanger and Tap Longeron holes
Details
09-09-2023
3.50
Install Lower Baffle Tensioners
Details
09-08-2023
4.80
EGT/CHT Wires & Lower Baffle Tensioners
Details
09-05-2023
1.20
Ignition Wire Pass-thru's
Details
09-04-2023
0.00
Baffles - Snorkel - Priming #2
Details
09-04-2023
9.80
Baffles - Snorkel - Priming #1
Details
09-03-2023
3.60
CHT-EGT Probes & Misc Items
Details
09-01-2023
3.80
Snorkel and Baffeling
Details
08-31-2023
0.70
Snorkel Brackets
Details
08-30-2023
2.50
Install Crankshaft Seal Retainer Brackets & Snorke
Details
08-29-2023
1.40
Snorkel Bolts and Brackets
Details
08-28-2023
1.70
Baffle and Snorkel
Details
08-27-2023
2.20
Left Front Baffle and Alt Air Bracket
Details
08-18-2023
2.80
Engine Misc Items
Details
08-17-2023
1.10
Bond Alt Air Flange & Secure Cables
Details
08-16-2023
1.40
Torque Stby Alternator & Alt Air Flange
Details
08-14-2023
1.90
Install Standby Alternator
Details
08-13-2023
2.10
Oil line restrictor and Alternator
Details
08-02-2023
1.20
Alternate Air Bypass
Details
08-01-2023
1.40
Install Snorkel to fit Alt Air Door
Details
07-31-2023
2.20
Sensor Manifold Standoff and Restrictor
Details
07-30-2023
0.00
Engine Cables and Hoses
Details
07-29-2023
2.20
AOA Module-Wire Standoff-Tach Cover
Details
05-27-2023
1.30
Throttle Quadrant
Details
05-24-2023
1.20
Throttle-Mixture-Prop Cables
Details
05-23-2023
1.00
Throttle / Mixture Cables and Cable Bracket
Details
05-22-2023
1.40
Mixture and Throttle Cables
Details
05-21-2023
2.70
Mixture Cable and Bracket
Details
05-20-2023
5.00
Misc Engine Work
Details
05-09-2023
1.30
Connect Oil Lines
Details
04-29-2023
3.50
Firewall Forward Tasks
Details
04-24-2023
2.10
Snorkel and Brackets
Details
04-19-2023
1.10
Snorkel Glaze & Sand
Details
04-17-2023
1.20
Snorkel Glazing and Sanding
Details
04-13-2023
1.60
Sand Snorkel
Details
03-10-2023
2.00
Snorkle & Windscreen
Details
02-26-2023
2.70
Oil Cooler Install and Snorkle Micro
Details
02-25-2023
1.90
More Snorkle - Skirt - and Oil Moount Work
Details
02-20-2023
2.20
Snorkle Micro & Sand
Details
02-18-2023
3.60
Oil Cooler Removed to Paint Frame
Details
02-12-2023
1.40
More Snorkle Work
Details
02-11-2023
3.00
Work Snorkle Insert & Bond Cowl Ducts
Details
02-10-2023
4.40
More Snorkle and Cowl Hinge Work
Details
02-09-2023
4.30
Snorkle and Cowl Hinges
Details
02-08-2023
2.80
Cowl Hinges & Snorkle
Details
02-02-2023
1.00
Baffles Return and Flox Snorkle
Details
01-18-2023
5.80
Complete Baffle Parts and Remove Baffles
Details
01-17-2023
6.10
Complete Baffle Seal Brackets
Details
01-16-2023
7.40
Front Baffles completed and installed baffles
Details
01-15-2023
7.60
Baffles and Snorkle
Details
01-14-2023
7.30
Engine Baffles & Snorkle
Details
01-13-2023
4.80
Finish and Rivet Baffles
Details
01-12-2023
2.80
Baffle Flanges and Prep
Details
01-11-2023
1.80
Baffles Misc
Details
01-10-2023
1.80
Baffle and Cowl Ducts
Details
01-08-2023
3.90
Cowl Inlets and Baffle Trimming
Details
01-07-2023
3.70
Baffles, Oil Line, Cowl Inlet Ducts
Details
01-06-2023
1.40
Oil Line Hole in RIght Ramp Baffle
Details
01-05-2023
2.20
Baffle Seal Backup Angles
Details
01-04-2023
1.90
Flanges for Rear Baffles
Details
01-03-2023
2.10
Baffle Ignition Wire Pass-thru's
Details
01-02-2023
5.40
Rear Baffle Flanges
Details
01-01-2023
2.60
Baffle Flanges
Details
12-31-2022
4.80
Baffle Conical Gusset
Details
12-30-2022
4.80
Front Baffle, Oil Cooler Support & Filter Mount
Details
12-29-2022
3.00
Baffles
Details
12-28-2022
3.60
Baffle Angle Clips
Details
12-27-2022
3.20
Front Engine Baffles and Left Ramp Support plate
Details
12-22-2022
1.90
Left Ramp Support Plate and Right Ramp Baffle
Details
12-21-2022
1.40
Baffles
Details
12-20-2022
1.80
Work Left Ramp and Filter Brackets
Details
12-19-2022
2.10
More Baffle Tweaking
Details
12-18-2022
3.90
More work on Ramps and Forward Baffles
Details
12-17-2022
4.70
Ramps and Snorkle
Details
12-16-2022
3.60
Snorkle-Left Inlet Ramp-Cowl Inlets
Details
12-15-2022
1.70
Modify Snorkle
Details
12-14-2022
2.30
Snorkle & Ramp
Details
12-13-2022
1.40
Ramp and Snorkle
Details
12-12-2022
1.60
Left Inlet Baffle & Snorkle
Details
12-11-2022
3.30
Left Ramp and Snorkle Work
Details
12-10-2022
4.30
Front Bafffle and Cowling
Details
12-08-2022
1.40
Front Baffles
Details
12-06-2022
3.90
Trim and Finish Baffle Edges
Details
12-05-2022
3.20
More Baffle Work
Details
12-01-2022
5.80
Baffles
Details
11-09-2022
2.30
Oil Cooler Adapter
Details
11-08-2022
5.10
Baffle, Oil Cooler, & Misc
Details
11-07-2022
2.20
Snorkle & Oil Cooler
Details
11-06-2022
2.30
Working Left Baffle Inlet Ramp
Details
11-05-2022
8.20
Another Baffle Session
Details
11-04-2022
3.10
Working the Right Inlet Baffle Ramp
Details
11-03-2022
1.70
Baffles general cleanup and fitting
Details
11-02-2022
1.50
Baffle Fitting
Details
11-01-2022
3.10
Baffles for Cylinders 1 & 2
Details
10-31-2022
2.60
Work on Baffles 3 & 4
Details
10-30-2022
3.60
Baffle (cont)
Details
10-29-2022
10.30
A Baffling Session
Details
08-31-2022
2.10
Install Red Cube Bracket, Fittings, & Safety Wire
Details
08-30-2022
2.40
Finish Red Cube Bracket
Details
08-29-2022
2.10
Red Cube Bracket
Details
08-10-2022
2.60
Red Cube Line & Cowling Spacer
Details
08-07-2022
1.30
Red Cube Hose & GPS Antenna
Details
07-22-2022
0.70
New Dessicant
Details
07-12-2022
1.60
Measure Throttle Body/ Servo Hose & Organize
Details
07-10-2022
1.40
FT-60 and Shelves
Details
07-05-2022
2.40
Fittings and Starter Cable
Details
07-04-2022
1.30
FT-60 Red Cube
Details
07-02-2022
2.60
Cable Support Bracket and more Research
Details
07-01-2022
1.50
Temp Install of Fuel Servo and Exhaust
Details
06-30-2022
1.30
Oil Cooler Fittings and Hose Measuring
Details
06-28-2022
1.90
Work Photos and Engine Standoff
Details
06-27-2022
1.10
Install Throttle Body & Take Photos
Details
08-07-2021
0.50
FWF box arrived
Details
07-19-2020
0.90
Unload engine into basement
Details
07-18-2020
0.00
OKC trip to pick up engine
Details
06-17-2020
1.50
Oil Cooler Routing #4
Details
06-16-2020
1.60
Oil Cooler cable routing #3
Details
06-15-2020
2.40
Oil Cooler Cable Routing #2
Details
06-14-2020
2.70
Oil Cooler cable routing
Details
05-20-2020
2.10
Oil Cooler Install #7
Details
05-19-2020
1.90
Oil Cooler Install #6
Details
05-17-2020
4.50
Oil Cooler Install #5
Details
05-16-2020
3.10
Oil Cooler Install #4
Details
05-15-2020
1.80
Oil Cooler Install #3
Details
05-14-2020
2.30
Oil Cooler Install #2
Details
05-13-2020
1.40
Oil Cooler Install #1
Details
04-10-2020
5.40
Drill engine mount and forward baggage shelf
Details
04-09-2020
3.80
Work Engine Mount & Left Landing Light
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1768
4370
Additional Help
28
168
Avionics
131
374
Canopy
136
346
Cowling
33
79
Electrical
246
656
Empennage
122
310
Engine
138
373
Fiberglass
95
246
Final Assembly
48
182
Fuselage
507
1169
Interior Seats, etc.
5
14
Landing Gear Finishi
19
62
Life Events
50
Lighting
11
20
Misc.
67
43
None
2
Paint
11
39
Prop
2
1
Rework Items
56
107
Signings
1
Smoke Tank
11
29
Wing Tips
22
77
Wings
27
75
Copyright © 2001-2024 Matronics. All Rights Reserved.