Powered By Kitlog Pro v2.0
TOM'S WEB SITE
7 Speedster
Empennage
Work Logs Found:
18
Category Work Time:
86 Hours
Date
Hours
Work Log Summary
Details
06-01-2020
1.50
Elevator and stabilizer tip sanding
Details
03-10-2020
6.00
Finished tail acces covers
Details
03-09-2020
6.00
Tail acces cover
Details
03-04-2020
4.00
Covered the tips in hysol
Details
03-03-2020
6.00
Tip construction
Details
02-14-2020
4.00
Second coating of wood epoxy varnish
Details
02-13-2020
4.00
First coating of wood varnish
Details
02-12-2020
4.00
Hysoled vertical tail and rudder rib stiffners and
Details
02-11-2020
2.00
Made rib stiffners for vertical tail and rudder
Details
02-04-2020
5.00
Tail fairings
Details
02-01-2020
4.00
Hysoled vertical tail ribs in place
Details
01-28-2020
6.00
Work on the rudder ribs
Details
01-25-2020
4.00
Fitting vertical tail ribs
Details
12-21-2019
7.00
installed trim motor
Details
12-17-2019
8.00
Installing the elevator bearings
Details
12-12-2019
4.00
Hysoled ribs in horizontal tail and elevator
Details
12-11-2019
4.00
Sanded elevator ribs, hysoled hor. tail ribs
Details
12-10-2019
6.00
Elevator reaming and rib fitting
Details
SITE NAVIGATION
Contact Builder
7 Speedster Home
Category
# Logs
# Hours
All
106
467
Empennage
18
86
Fuselage
31
146
Miscellaneous
4
30
Wings
53
205
Copyright © 2001-2024 Matronics. All Rights Reserved.