KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
Work Logs Found: 176
Category Work Time: 874 Hours
 Date
Hours
Work Log Summary

Details

 01-13-2024
4.00
Horizontal stab install and seat rails
Details
       

 12-28-2022
1.00
Rear seatbelt anchors
Details
     

 11-25-2022
5.00
Cabin/Tailcone bodywork and seat belt anchors
Details
       

 11-23-2022
6.00
LH door area bodywork
Details
     

 11-20-2022
5.00
Av-Mag wiring and door body work
Details
       

 11-14-2022
5.00
More cabin top finishing work
Details
       

 11-12-2022
7.00
Cabin top finishing bodywork
Details
       

 11-10-2022
3.00
Priming windshield fairing
Details
       

 11-05-2022
3.00
More windshield fairing work
Details
       

 10-30-2022
5.00
More windshield fairing work
Details
       

 10-20-2022
3.00
More fairing work
Details
       

 10-19-2022
4.00
Lower windshield fairing work
Details
       

 10-17-2022
7.00
Windshield install
Details
       

 10-16-2022
5.00
Windscreen installation
Details
       

 10-15-2022
4.50
Wing root fairing angles
Details
       

 10-04-2022
8.00
Cabin top body work
Details
       

 09-13-2022
6.50
Visors and door opening body work
Details
       

 09-05-2022
6.00
Interior panels, wire routing and center post
Details
       

 08-14-2022
1.00
Baggage door strut
Details
     

 07-09-2022
9.00
Tail compartment bulkhead inspection door
Details
       

 07-04-2022
3.00
Battery charge plug and interior lights switch
Details
       

 06-27-2022
4.00
Overhead console wiring
Details
       

 06-25-2022
7.00
Tailcone wiring and plumbing
Details
       

 06-23-2022
9.00
Tailcone wiring and antennas
Details
       

 06-19-2022
4.00
Riveting tailcone skin
Details
       

 06-18-2022
7.00
Tailcone work
Details
       

 05-29-2022
4.00
Routing fuselage wiring
Details
       

 05-21-2022
8.50
Rudder cables, priming and panel work
Details
       

 05-16-2022
8.00
Wing root connectors and wiring
Details
       

 05-07-2022
3.00
Mid seat rail supports and firewall passthru's
Details
       

 04-24-2022
4.00
Brake lines and Flap POS-12 sensor
Details
       

 04-12-2022
2.00
Wing root nutplates
Details
       

 04-10-2022
4.50
Matco brakes install
Details
       

 04-09-2022
9.00
Gear legs and wheel install
Details
       

 04-06-2022
3.00
Engine mount, NLG, tires and wheels assy.
Details
       

 04-05-2022
2.00
Slickstart mount
Details
       

 04-03-2022
5.00
Door latch pins, guides and lift struts
Details
       

 04-02-2022
6.50
Door windows
Details
       

 04-01-2022
6.00
Rear windows
Details
       

 03-30-2022
4.00
Cabin top attachment
Details
     

 03-27-2022
5.00
Final install of cabin top
Details
     

 03-26-2022
2.00
Ovhd console clear coat
Details
       

 02-21-2022
3.50
Brake reservoir, fluid press manifold and PPS
Details
     

 02-20-2022
4.00
Upper fwd fuse and engine mount
Details
       

 02-17-2022
4.00
Door windows
Details
     

 12-18-2021
6.00
Cabin top priming
Details
       

 12-05-2021
4.00
Cabin top finishing
Details
       

 12-02-2021
4.00
Cabin top finishing
Details
     

 11-28-2021
7.00
Headliner shells and filler work
Details
       

 11-27-2021
6.00
Door posts and ovhd console
Details
       

 10-16-2021
6.00
Cabin top and ovhd console work
Details
       

 10-06-2021
9.00
Ovhd work and firewall cover panels
Details
       

 09-30-2021
3.00
Firewall insulation and Ovhd lighting
Details
       

 09-24-2021
7.00
Ovhd console, firewall and panel work
Details
       

 09-15-2021
2.00
Parking brake, fuse block and insulation
Details
       

 09-11-2021
7.00
Instrument panel components and NACA scoops
Details
       

 09-06-2021
3.00
Instrument panel work
Details
       

 08-21-2021
5.00
Instrument panel fabrication and VPX mounting
Details
       

 08-15-2021
4.00
Priming and riveting doublers
Details
       

 08-14-2021
5.00
Center radio stack support
Details
       

 08-08-2021
5.00
Cabin heat controls
Details
       

 07-17-2021
2.00
Center radio stack mounting
Details
       

 07-10-2021
4.00
Throttle quadrant installation
Details
       

 07-06-2021
3.00
Audio panel installation
Details
       

 07-03-2021
8.00
Panel and Center Console
Details
       

 06-30-2021
4.00
LH panel work
Details
       

 06-25-2021
5.00
Panel work
Details
       

 06-22-2021
6.00
Instrument panel work
Details
       

 06-19-2021
1.00
Instrument panel inserts
Details
     

 06-03-2021
4.00
GPS antennas
Details
       

 05-13-2021
3.00
Cabin overhead panel
Details
       

 04-10-2021
4.00
Wing root fairings
Details
     

 04-10-2021
2.00
Flap drive motor installation
Details
       

 03-27-2021
1.50
Flap torque tube installation
Details
       

 03-23-2021
6.00
Instrument Panel
Details
       

 03-21-2021
4.00
Defrost fans
Details
       

 03-17-2021
2.00
Rudder pedal torque tube installation
Details
     

 03-17-2021
3.00
Rudder cables
Details
       

 03-17-2021
3.00
Fuel Pump
Details
       

 03-13-2021
3.00
Cabin top countersinking and dimpling
Details
       

 03-12-2021
7.00
Rear windows and cabin top work
Details
       

 02-24-2021
6.00
Center cabin brace and windshield trimming
Details
       

 02-23-2021
7.00
Cabin top and tailcone skin
Details
       

 02-05-2021
3.00
Rudder pedal and brake master cylinders
Details
     

 01-31-2021
8.00
Cabin top trimming
Details
       

 01-21-2021
6.00
Cabin top fitting
Details
       

 01-20-2021
1.00
Cabin heat valve actuators
Details
     

 01-11-2021
2.00
Flap crank assemblies
Details
     

 01-07-2021
5.00
Elevator and aileron pushrods
Details
       

 01-06-2021
4.00
Rear seat back assembly
Details
       

 01-02-2021
4.00
Rear seat backs
Details
       

 01-01-2021
3.00
Yaw servo mounting plate
Details
       

 12-29-2020
4.00
Fuel Line Installation
Details
       

 12-13-2020
3.00
Andair fuel valve bracket modification
Details
       

 12-12-2020
6.00
Brake line fabrication
Details
       

 12-10-2020
9.00
Cover panels
Details
       

 12-09-2020
8.00
Floor, seat pans and cover panels
Details
       

 12-05-2020
6.00
Rear seat floor pans
Details
       

 12-04-2020
4.00
Baggage door and cover
Details
       

 12-03-2020
6.00
Baggage door riveting
Details
       

 12-02-2020
9.00
Baggage bulkhead panel and door
Details
       

 11-29-2020
8.00
Seat floors, baggage floors and rear bulkhead
Details
       

 11-21-2020
4.00
Routing conduit and insulating floors
Details
       

 11-19-2020
8.00
Accessory tray and conduit routing
Details
       

 11-17-2020
6.00
Conduit and equipment mounting tray
Details
       

 11-11-2020
3.00
Baggage floor stiffeners and step install
Details
       

 11-07-2020
2.00
Priming baggage area parts
Details
     

 11-05-2020
5.00
Deburring and dimpling baggage area
Details
       

 11-04-2020
2.00
Baggage floor stiffeners
Details
     

 11-03-2020
5.00
Rear seat pans and baggage floors
Details
       

 10-15-2020
4.50
Riveting upper fwd fuse skin
Details
       

 10-10-2020
5.00
Riveting fwd fuse sub assembly
Details
       

 10-09-2020
3.00
Fwd fuse upper skin dimpling
Details
       

 10-08-2020
6.00
Fwd fuse top skin
Details
       

 10-06-2020
2.00
Step installation
Details
       

 10-06-2020
4.00
Fwd upper fuse structure
Details
       

 10-04-2020
6.00
Fwd cabin floor pans and gear brackets
Details
       

 10-02-2020
10.00
Finished riveting side skins and move to cradle
Details
       

 09-29-2020
3.00
Fwd sub panel and ribs
Details
       

 09-25-2020
4.00
Brake pedals
Details
       

 09-23-2020
4.00
Upper Fwd Fuse
Details
       

 09-20-2020
8.00
Riveting side skins and RH mid cabin deck
Details
       

 09-20-2020
2.00
Rear seat vents
Details
       

 09-18-2020
8.00
Riveting LH side skin and mid cabin deck
Details
     

 09-17-2020
3.00
Riveting side skins
Details
       

 09-13-2020
4.00
Dimpling Fwd Side Skins and Priming
Details
       

 09-11-2020
4.00
Riveting Rear Seat Back and Fwd Structure
Details
       

 09-11-2020
2.00
Dimpling Mid Side Skins
Details
     

 09-06-2020
10.00
Dimpling and Priming Fuse Parts
Details
       

 09-02-2020
9.00
Fwd Structure and Firewall Brackets
Details
       

 08-29-2020
4.00
Firewall brackets
Details
       

 08-23-2020
8.00
Drilling fwd side skins and under structure
Details
       

 08-19-2020
3.00
Fwd fuse side skins and under structure
Details
     

 08-19-2020
6.00
Fwd and Mid side skins and fwd structure
Details
       

 08-12-2020
4.00
Bending mid side skins
Details
       

 08-09-2020
2.00
Landing gear mounts
Details
       

 08-09-2020
4.00
Baggage door seal angles and rear seat back
Details
       

 06-22-2020
8.00
Center section assembly
Details
     

 06-21-2020
4.00
Riveting mid and fwd fuse sections
Details
       

 04-28-2020
2.00
Riveting fwd center bulkhead to fwd ribs
Details
       

 04-26-2020
2.00
Riveting firewall bulkhead to fwd fuse skin
Details
     

 04-26-2020
3.00
Fwd fuse longerons
Details
       

 04-25-2020
3.00
Mid fuse longerons
Details
     

 04-25-2020
2.00
Fwd seat floors
Details
     

 04-24-2020
5.00
Fwd seat pans
Details
       

 04-22-2020
5.00
Riveting fwd fuse assy.
Details
       

 04-19-2020
6.50
Dimpling and priming fwd fuse section parts
Details
       

 04-18-2020
9.00
Fwd and mid lower skin drilling
Details
       

 04-16-2020
2.00
Mating mid and fwd fuse assemblies
Details
       

 04-16-2020
2.00
Completed riveting of mid fuse bottom skins
Details
       

 04-13-2020
3.00
Riveting mid fuse bottom skins
Details
       

 04-12-2020
3.00
Riveting mid fuse bottom skins
Details
     

 04-11-2020
8.50
Attaching firewall bulkhead to fwd fuse assy.
Details
       

 04-10-2020
5.00
Fwd fuse skin, ribs and bulkheads
Details
       

 04-09-2020
8.00
Seat rail supports and control column mounts
Details
       

 04-08-2020
8.00
Fwd fuse ribs and skin
Details
     

 04-04-2020
1.00
Rudder Pedal Brace
Details
       

 04-03-2020
8.00
Joining Firewall to Forward Rib Subassemblies
Details
       

 04-02-2020
6.00
Firewall Center Ribs
Details
       

 04-01-2020
9.00
Firewall Riveting
Details
       

 03-29-2020
6.00
Firewall Drilling and Dimpling
Details
       

 03-26-2020
6.00
Firewall Assembly
Details
     

 03-24-2020
8.00
Drilling Mid and Center Bottom Skins
Details
       

 03-23-2020
9.00
Rear Seat Ribs and Bulkhead Riveting
Details
       

 03-20-2020
6.00
Rear Spar Bulkhead and Rear Seat Ribs
Details
       

 03-19-2020
9.00
Riveting IB and OB Seat Rib Assemblies
Details
       

 03-18-2020
9.00
Inboard and Outboard Seat Rib Subassemblies
Details
       

 03-17-2020
1.50
Rear Seat Fuse Bulkhead
Details
     

 03-16-2020
5.50
Riveting Rear Spar Bulkhead Assy
Details
       

 03-15-2020
5.00
Rear Spar Bulkhead
Details
       

 03-14-2020
8.00
Assembling Aft Spar Center Section
Details
       

 03-13-2020
10.00
FWD and AFT Center Section Bulkheads
Details
       

 03-08-2020
1.50
Prepped and Primed Center Bulkhead Parts
     

 03-01-2020
6.00
Begining work on fuselage center section
Details
       

 02-26-2020
6.00
Firewall Assembly
Details
     

 02-25-2020
6.00
Fuselage Inventory and Move to Hangar
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.