Date
|
Hours
|
Work Log Summary
|
Details
|
01-13-2024
|
4.00
|
Horizontal stab install and seat rails
|
Details
|
|
|
12-28-2022
|
1.00
|
Rear seatbelt anchors
|
Details
|
|
|
11-25-2022
|
5.00
|
Cabin/Tailcone bodywork and seat belt anchors
|
Details
|
|
|
11-23-2022
|
6.00
|
LH door area bodywork
|
Details
|
|
|
11-20-2022
|
5.00
|
Av-Mag wiring and door body work
|
Details
|
|
|
11-14-2022
|
5.00
|
More cabin top finishing work
|
Details
|
|
|
11-12-2022
|
7.00
|
Cabin top finishing bodywork
|
Details
|
|
|
11-10-2022
|
3.00
|
Priming windshield fairing
|
Details
|
|
|
11-05-2022
|
3.00
|
More windshield fairing work
|
Details
|
|
|
10-30-2022
|
5.00
|
More windshield fairing work
|
Details
|
|
|
10-20-2022
|
3.00
|
More fairing work
|
Details
|
|
|
10-19-2022
|
4.00
|
Lower windshield fairing work
|
Details
|
|
|
10-17-2022
|
7.00
|
Windshield install
|
Details
|
|
|
10-16-2022
|
5.00
|
Windscreen installation
|
Details
|
|
|
10-15-2022
|
4.50
|
Wing root fairing angles
|
Details
|
|
|
10-04-2022
|
8.00
|
Cabin top body work
|
Details
|
|
|
09-13-2022
|
6.50
|
Visors and door opening body work
|
Details
|
|
|
09-05-2022
|
6.00
|
Interior panels, wire routing and center post
|
Details
|
|
|
08-14-2022
|
1.00
|
Baggage door strut
|
Details
|
|
|
07-09-2022
|
9.00
|
Tail compartment bulkhead inspection door
|
Details
|
|
|
07-04-2022
|
3.00
|
Battery charge plug and interior lights switch
|
Details
|
|
|
06-27-2022
|
4.00
|
Overhead console wiring
|
Details
|
|
|
06-25-2022
|
7.00
|
Tailcone wiring and plumbing
|
Details
|
|
|
06-23-2022
|
9.00
|
Tailcone wiring and antennas
|
Details
|
|
|
06-19-2022
|
4.00
|
Riveting tailcone skin
|
Details
|
|
|
06-18-2022
|
7.00
|
Tailcone work
|
Details
|
|
|
05-29-2022
|
4.00
|
Routing fuselage wiring
|
Details
|
|
|
05-21-2022
|
8.50
|
Rudder cables, priming and panel work
|
Details
|
|
|
05-16-2022
|
8.00
|
Wing root connectors and wiring
|
Details
|
|
|
05-07-2022
|
3.00
|
Mid seat rail supports and firewall passthru's
|
Details
|
|
|
04-24-2022
|
4.00
|
Brake lines and Flap POS-12 sensor
|
Details
|
|
|
04-12-2022
|
2.00
|
Wing root nutplates
|
Details
|
|
|
04-10-2022
|
4.50
|
Matco brakes install
|
Details
|
|
|
04-09-2022
|
9.00
|
Gear legs and wheel install
|
Details
|
|
|
04-06-2022
|
3.00
|
Engine mount, NLG, tires and wheels assy.
|
Details
|
|
|
04-05-2022
|
2.00
|
Slickstart mount
|
Details
|
|
|
04-03-2022
|
5.00
|
Door latch pins, guides and lift struts
|
Details
|
|
|
04-02-2022
|
6.50
|
Door windows
|
Details
|
|
|
04-01-2022
|
6.00
|
Rear windows
|
Details
|
|
|
03-30-2022
|
4.00
|
Cabin top attachment
|
Details
|
|
|
03-27-2022
|
5.00
|
Final install of cabin top
|
Details
|
|
|
03-26-2022
|
2.00
|
Ovhd console clear coat
|
Details
|
|
|
02-21-2022
|
3.50
|
Brake reservoir, fluid press manifold and PPS
|
Details
|
|
|
02-20-2022
|
4.00
|
Upper fwd fuse and engine mount
|
Details
|
|
|
02-17-2022
|
4.00
|
Door windows
|
Details
|
|
|
12-18-2021
|
6.00
|
Cabin top priming
|
Details
|
|
|
12-05-2021
|
4.00
|
Cabin top finishing
|
Details
|
|
|
12-02-2021
|
4.00
|
Cabin top finishing
|
Details
|
|
|
11-28-2021
|
7.00
|
Headliner shells and filler work
|
Details
|
|
|
11-27-2021
|
6.00
|
Door posts and ovhd console
|
Details
|
|
|
10-16-2021
|
6.00
|
Cabin top and ovhd console work
|
Details
|
|
|
10-06-2021
|
9.00
|
Ovhd work and firewall cover panels
|
Details
|
|
|
09-30-2021
|
3.00
|
Firewall insulation and Ovhd lighting
|
Details
|
|
|
09-24-2021
|
7.00
|
Ovhd console, firewall and panel work
|
Details
|
|
|
09-15-2021
|
2.00
|
Parking brake, fuse block and insulation
|
Details
|
|
|
09-11-2021
|
7.00
|
Instrument panel components and NACA scoops
|
Details
|
|
|
09-06-2021
|
3.00
|
Instrument panel work
|
Details
|
|
|
08-21-2021
|
5.00
|
Instrument panel fabrication and VPX mounting
|
Details
|
|
|
08-15-2021
|
4.00
|
Priming and riveting doublers
|
Details
|
|
|
08-14-2021
|
5.00
|
Center radio stack support
|
Details
|
|
|
08-08-2021
|
5.00
|
Cabin heat controls
|
Details
|
|
|
07-17-2021
|
2.00
|
Center radio stack mounting
|
Details
|
|
|
07-10-2021
|
4.00
|
Throttle quadrant installation
|
Details
|
|
|
07-06-2021
|
3.00
|
Audio panel installation
|
Details
|
|
|
07-03-2021
|
8.00
|
Panel and Center Console
|
Details
|
|
|
06-30-2021
|
4.00
|
LH panel work
|
Details
|
|
|
06-25-2021
|
5.00
|
Panel work
|
Details
|
|
|
06-22-2021
|
6.00
|
Instrument panel work
|
Details
|
|
|
06-19-2021
|
1.00
|
Instrument panel inserts
|
Details
|
|
|
06-03-2021
|
4.00
|
GPS antennas
|
Details
|
|
|
05-13-2021
|
3.00
|
Cabin overhead panel
|
Details
|
|
|
04-10-2021
|
4.00
|
Wing root fairings
|
Details
|
|
|
04-10-2021
|
2.00
|
Flap drive motor installation
|
Details
|
|
|
03-27-2021
|
1.50
|
Flap torque tube installation
|
Details
|
|
|
03-23-2021
|
6.00
|
Instrument Panel
|
Details
|
|
|
03-21-2021
|
4.00
|
Defrost fans
|
Details
|
|
|
03-17-2021
|
2.00
|
Rudder pedal torque tube installation
|
Details
|
|
|
03-17-2021
|
3.00
|
Rudder cables
|
Details
|
|
|
03-17-2021
|
3.00
|
Fuel Pump
|
Details
|
|
|
03-13-2021
|
3.00
|
Cabin top countersinking and dimpling
|
Details
|
|
|
03-12-2021
|
7.00
|
Rear windows and cabin top work
|
Details
|
|
|
02-24-2021
|
6.00
|
Center cabin brace and windshield trimming
|
Details
|
|
|
02-23-2021
|
7.00
|
Cabin top and tailcone skin
|
Details
|
|
|
02-05-2021
|
3.00
|
Rudder pedal and brake master cylinders
|
Details
|
|
|
01-31-2021
|
8.00
|
Cabin top trimming
|
Details
|
|
|
01-21-2021
|
6.00
|
Cabin top fitting
|
Details
|
|
|
01-20-2021
|
1.00
|
Cabin heat valve actuators
|
Details
|
|
|
01-11-2021
|
2.00
|
Flap crank assemblies
|
Details
|
|
|
01-07-2021
|
5.00
|
Elevator and aileron pushrods
|
Details
|
|
|
01-06-2021
|
4.00
|
Rear seat back assembly
|
Details
|
|
|
01-02-2021
|
4.00
|
Rear seat backs
|
Details
|
|
|
01-01-2021
|
3.00
|
Yaw servo mounting plate
|
Details
|
|
|
12-29-2020
|
4.00
|
Fuel Line Installation
|
Details
|
|
|
12-13-2020
|
3.00
|
Andair fuel valve bracket modification
|
Details
|
|
|
12-12-2020
|
6.00
|
Brake line fabrication
|
Details
|
|
|
12-10-2020
|
9.00
|
Cover panels
|
Details
|
|
|
12-09-2020
|
8.00
|
Floor, seat pans and cover panels
|
Details
|
|
|
12-05-2020
|
6.00
|
Rear seat floor pans
|
Details
|
|
|
12-04-2020
|
4.00
|
Baggage door and cover
|
Details
|
|
|
12-03-2020
|
6.00
|
Baggage door riveting
|
Details
|
|
|
12-02-2020
|
9.00
|
Baggage bulkhead panel and door
|
Details
|
|
|
11-29-2020
|
8.00
|
Seat floors, baggage floors and rear bulkhead
|
Details
|
|
|
11-21-2020
|
4.00
|
Routing conduit and insulating floors
|
Details
|
|
|
11-19-2020
|
8.00
|
Accessory tray and conduit routing
|
Details
|
|
|
11-17-2020
|
6.00
|
Conduit and equipment mounting tray
|
Details
|
|
|
11-11-2020
|
3.00
|
Baggage floor stiffeners and step install
|
Details
|
|
|
11-07-2020
|
2.00
|
Priming baggage area parts
|
Details
|
|
|
11-05-2020
|
5.00
|
Deburring and dimpling baggage area
|
Details
|
|
|
11-04-2020
|
2.00
|
Baggage floor stiffeners
|
Details
|
|
|
11-03-2020
|
5.00
|
Rear seat pans and baggage floors
|
Details
|
|
|
10-15-2020
|
4.50
|
Riveting upper fwd fuse skin
|
Details
|
|
|
10-10-2020
|
5.00
|
Riveting fwd fuse sub assembly
|
Details
|
|
|
10-09-2020
|
3.00
|
Fwd fuse upper skin dimpling
|
Details
|
|
|
10-08-2020
|
6.00
|
Fwd fuse top skin
|
Details
|
|
|
10-06-2020
|
2.00
|
Step installation
|
Details
|
|
|
10-06-2020
|
4.00
|
Fwd upper fuse structure
|
Details
|
|
|
10-04-2020
|
6.00
|
Fwd cabin floor pans and gear brackets
|
Details
|
|
|
10-02-2020
|
10.00
|
Finished riveting side skins and move to cradle
|
Details
|
|
|
09-29-2020
|
3.00
|
Fwd sub panel and ribs
|
Details
|
|
|
09-25-2020
|
4.00
|
Brake pedals
|
Details
|
|
|
09-23-2020
|
4.00
|
Upper Fwd Fuse
|
Details
|
|
|
09-20-2020
|
8.00
|
Riveting side skins and RH mid cabin deck
|
Details
|
|
|
09-20-2020
|
2.00
|
Rear seat vents
|
Details
|
|
|
09-18-2020
|
8.00
|
Riveting LH side skin and mid cabin deck
|
Details
|
|
|
09-17-2020
|
3.00
|
Riveting side skins
|
Details
|
|
|
09-13-2020
|
4.00
|
Dimpling Fwd Side Skins and Priming
|
Details
|
|
|
09-11-2020
|
4.00
|
Riveting Rear Seat Back and Fwd Structure
|
Details
|
|
|
09-11-2020
|
2.00
|
Dimpling Mid Side Skins
|
Details
|
|
|
09-06-2020
|
10.00
|
Dimpling and Priming Fuse Parts
|
Details
|
|
|
09-02-2020
|
9.00
|
Fwd Structure and Firewall Brackets
|
Details
|
|
|
08-29-2020
|
4.00
|
Firewall brackets
|
Details
|
|
|
08-23-2020
|
8.00
|
Drilling fwd side skins and under structure
|
Details
|
|
|
08-19-2020
|
3.00
|
Fwd fuse side skins and under structure
|
Details
|
|
|
08-19-2020
|
6.00
|
Fwd and Mid side skins and fwd structure
|
Details
|
|
|
08-12-2020
|
4.00
|
Bending mid side skins
|
Details
|
|
|
08-09-2020
|
2.00
|
Landing gear mounts
|
Details
|
|
|
08-09-2020
|
4.00
|
Baggage door seal angles and rear seat back
|
Details
|
|
|
06-22-2020
|
8.00
|
Center section assembly
|
Details
|
|
|
06-21-2020
|
4.00
|
Riveting mid and fwd fuse sections
|
Details
|
|
|
04-28-2020
|
2.00
|
Riveting fwd center bulkhead to fwd ribs
|
Details
|
|
|
04-26-2020
|
2.00
|
Riveting firewall bulkhead to fwd fuse skin
|
Details
|
|
|
04-26-2020
|
3.00
|
Fwd fuse longerons
|
Details
|
|
|
04-25-2020
|
3.00
|
Mid fuse longerons
|
Details
|
|
|
04-25-2020
|
2.00
|
Fwd seat floors
|
Details
|
|
|
04-24-2020
|
5.00
|
Fwd seat pans
|
Details
|
|
|
04-22-2020
|
5.00
|
Riveting fwd fuse assy.
|
Details
|
|
|
04-19-2020
|
6.50
|
Dimpling and priming fwd fuse section parts
|
Details
|
|
|
04-18-2020
|
9.00
|
Fwd and mid lower skin drilling
|
Details
|
|
|
04-16-2020
|
2.00
|
Mating mid and fwd fuse assemblies
|
Details
|
|
|
04-16-2020
|
2.00
|
Completed riveting of mid fuse bottom skins
|
Details
|
|
|
04-13-2020
|
3.00
|
Riveting mid fuse bottom skins
|
Details
|
|
|
04-12-2020
|
3.00
|
Riveting mid fuse bottom skins
|
Details
|
|
|
04-11-2020
|
8.50
|
Attaching firewall bulkhead to fwd fuse assy.
|
Details
|
|
|
04-10-2020
|
5.00
|
Fwd fuse skin, ribs and bulkheads
|
Details
|
|
|
04-09-2020
|
8.00
|
Seat rail supports and control column mounts
|
Details
|
|
|
04-08-2020
|
8.00
|
Fwd fuse ribs and skin
|
Details
|
|
|
04-04-2020
|
1.00
|
Rudder Pedal Brace
|
Details
|
|
|
04-03-2020
|
8.00
|
Joining Firewall to Forward Rib Subassemblies
|
Details
|
|
|
04-02-2020
|
6.00
|
Firewall Center Ribs
|
Details
|
|
|
04-01-2020
|
9.00
|
Firewall Riveting
|
Details
|
|
|
03-29-2020
|
6.00
|
Firewall Drilling and Dimpling
|
Details
|
|
|
03-26-2020
|
6.00
|
Firewall Assembly
|
Details
|
|
|
03-24-2020
|
8.00
|
Drilling Mid and Center Bottom Skins
|
Details
|
|
|
03-23-2020
|
9.00
|
Rear Seat Ribs and Bulkhead Riveting
|
Details
|
|
|
03-20-2020
|
6.00
|
Rear Spar Bulkhead and Rear Seat Ribs
|
Details
|
|
|
03-19-2020
|
9.00
|
Riveting IB and OB Seat Rib Assemblies
|
Details
|
|
|
03-18-2020
|
9.00
|
Inboard and Outboard Seat Rib Subassemblies
|
Details
|
|
|
03-17-2020
|
1.50
|
Rear Seat Fuse Bulkhead
|
Details
|
|
|
03-16-2020
|
5.50
|
Riveting Rear Spar Bulkhead Assy
|
Details
|
|
|
03-15-2020
|
5.00
|
Rear Spar Bulkhead
|
Details
|
|
|
03-14-2020
|
8.00
|
Assembling Aft Spar Center Section
|
Details
|
|
|
03-13-2020
|
10.00
|
FWD and AFT Center Section Bulkheads
|
Details
|
|
|
03-08-2020
|
1.50
|
Prepped and Primed Center Bulkhead Parts
|
|
|
|
03-01-2020
|
6.00
|
Begining work on fuselage center section
|
Details
|
|
|
02-26-2020
|
6.00
|
Firewall Assembly
|
Details
|
|
|
02-25-2020
|
6.00
|
Fuselage Inventory and Move to Hangar
|
Details
|
|