KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
Work Logs Found: 117
Category Work Time: 197 Hours
 Date
Hours
Work Log Summary

Details

 08-27-2023
2.00
Riveting l/h
Details
       

 08-27-2023
4.50
l/h wing L.E & top skin
Details
       

 08-26-2023
1.50
re-installing fuel tank in LH wing
Details
       

 08-26-2023
2.50
Preparing to rivet LH top skin & L.E.
Details
       

 08-26-2023
3.00
install fuel tank & pull down L.E. skin
Details
       

 08-26-2023
1.50
fuel sender access opening
Details
       

 11-05-2021
1.50
fitting bottom skin on L wing
Details
       

 11-05-2021
2.50
Begin re-assembly of L wing spars
Details
       

 11-04-2021
3.00
Left wing spars and rib fitting
Details
       

 11-04-2021
3.00
Left Wing details corrosion protection
Details
       

 11-04-2021
2.00
corrosion protect L wing details
Details
       

 09-26-2021
1.00
L/H wing Rin stiffeners
Details
       

 09-26-2021
1.00
L/H Wing rib stiffeners
Details
       

 09-26-2021
0.50
L/H wing aileron bell crank support
Details
       

 09-26-2021
1.00
L/H aileron Bell crank pivot brackets
Details
       

 09-25-2021
2.50
Starting L/H wing
Details
       

 09-25-2021
2.00
L/H wing aft Spar drilling
Details
       

 09-25-2021
1.00
finish drilling aft spar
Details
       

 05-05-2021
2.00
Fuel level sender cover, body filler
Details
       

 05-04-2021
2.50
Fuel sender cover, 2nd layer of glass
Details
       

 02-07-2021
2.50
RH wing top skin
Details
       

 02-07-2021
2.00
re-checking level before final riveting
Details
       

 02-07-2021
1.50
final riveting of RH top wing skin
Details
       

 02-06-2021
2.50
RH wing top skin placement
Details
       

 02-06-2021
2.00
landing light & fuel tank
Details
       

 02-06-2021
2.50
Aileron Control rod
Details
       

 02-02-2021
2.00
RH Aileron control and balance cables
Details
       

 02-02-2021
0.50
Cables installed, torq.d and cotter pin'd
Details
     

 01-30-2021
3.00
Wing details alodine and prep top skin
Details
       

 01-30-2021
1.00
Landing light lens support brackets
Details
       

 01-30-2021
1.00
aileron bell crank pivot bolt
Details
       

 01-28-2021
1.50
Wing tip access cover panel
Details
       

 01-27-2021
1.00
RH Wing tip access cutout
Details
       

 01-27-2021
2.50
Landing light mount and access covers
Details
       

 01-24-2021
2.75
power up wing lights
Details
       

 01-23-2021
2.50
RH Leading edge and rib grommets
Details
       

 01-09-2021
2.50
right wing leading edge prep
Details
       

 01-09-2021
1.50
RH Leading edge prep
Details
       

 12-28-2020
1.50
Pre install flex fuel line
Details
       

 12-28-2020
0.50
flex fuel line in right wing
Details
       

 12-27-2020
2.00
top mount fuel sender prep for installation
Details
       

 12-27-2020
3.00
fuel tank ground / sender wires
Details
       

 12-23-2020
1.00
clean up and prep for wire run
Details
       

 11-18-2020
1.50
riveting R wing internal items
Details
       

 11-17-2020
1.50
Turning Right wing over to work inside
Details
       

 11-17-2020
1.50
riveting lower wing skin stiffeners
Details
       

 11-15-2020
1.50
strip R wing, primer prep
Details
       

 11-15-2020
1.50
riveting R wing bottom skin
Details
       

 11-15-2020
2.50
primer prep on bottom right skin
Details
       

 11-15-2020
1.00
preparing to rivet R wing lower skin
Details
       

 11-14-2020
1.50
dis-assemble wing to deburr
Details
       

 11-07-2020
2.00
fitting tank and making templates for LE skin
Details
       

 11-07-2020
1.50
fitting right tank into LE bay area
Details
       

 11-07-2020
1.50
fitting cork on right wing tank
Details
       

 11-07-2020
1.50
cutting LE skin openings for fuel tank
Details
       

 11-06-2020
1.00
wing tip, nav light support bracket
Details
       

 11-06-2020
1.00
wing locker hatch fitting
Details
       

 11-06-2020
1.50
starting right wing fuel tank
Details
       

 11-06-2020
1.50
setting float for SW fuel sender
Details
       

 11-06-2020
1.00
fitting the locker hatch
Details
       

 11-06-2020
2.00
fitting SW fuel sender in right tank
Details
       

 11-05-2020
1.50
wing locker hatch cover
Details
       

 11-04-2020
2.50
Right wing tip glass repair
Details
       

 11-04-2020
2.00
Langing light option
Details
       

 11-04-2020
2.50
landing light support structure
Details
       

 11-04-2020
2.50
landing light support
Details
       

 11-04-2020
1.50
Landing light lens
Details
       

 11-04-2020
0.50
cutting opening for wing locker
Details
       

 11-03-2020
1.50
wing drilling & tip cap prep
Details
       

 11-03-2020
2.00
right wing tip
Details
       

 11-03-2020
4.50
fitting rignt wing tip cap
Details
       

 11-03-2020
4.00
bell crank supports
Details
     

 11-02-2020
2.00
drilling lower skin stiffeners between ribs
Details
       

 10-08-2020
1.50
Top wing skin stiffeners between ribs
Details
       

 10-07-2020
1.50
Top Wing skin stiffeners between ribs
Details
       

 10-06-2020
1.00
Final drill of top wing skin and ribs
Details
       

 10-05-2020
1.00
Drilling LE skins
Details
       

 09-22-2020
1.50
drilling LE wing skins
Details
     

 08-25-2020
1.50
Strapping down leading edge
Details
       

 08-23-2020
1.50
Pulling leading edge skin closed
Details
       

 05-27-2020
1.00
drilling bottom holes in right wing nose skin
Details
     

 05-26-2020
2.00
tie down support and access panel
Details
       

 05-26-2020
2.00
Cleco nose ribs and align bottom LE skin
Details
       

 04-27-2020
1.00
Set up for bottom right wing skin
Details
       

 04-27-2020
0.50
R wing top skin drilling set up
Details
       

 04-27-2020
1.50
drilling top right wing skin
Details
       

 04-27-2020
1.50
drilling r wing top skin to #4
Details
       

 04-27-2020
4.50
drilling R wing bottom skin
Details
       

 04-26-2020
0.50
top skin right wing fit
Details
       

 04-26-2020
0.50
top skin clampup / fit
Details
       

 04-26-2020
0.50
recheck wing for level
Details
       

 04-20-2020
0.50
Taking top skin out of crate.
Details
       

 04-19-2020
0.50
Wing structure riveting
Details
       

 04-19-2020
3.00
riveting rib stiffeners to RR1-RR4
Details
       

 04-19-2020
1.50
Riveting Rear ribs 1 & 4
Details
       

 04-19-2020
1.00
Rear spar re-assembly
Details
       

 04-19-2020
1.00
Rear spar re-assembly
Details
       

 04-19-2020
1.50
Rear Spar Assembly
Details
       

 04-19-2020
2.00
Completing Right wing rear ribs
Details
       

 04-17-2020
1.50
beburr spars and prep for assembly
Details
       

 04-11-2020
1.50
Ribs and spars fitted together
Details
       

 04-04-2020
1.50
Wing ribs
Details
       

 04-04-2020
1.00
Wing Rib lay out on spar
Details
       

 04-04-2020
1.50
Rear wibs, right wing
Details
       

 04-04-2020
2.00
Fitting all the nose ribs
Details
       

 04-04-2020
1.00
Fiting Nose Ribs
Details
       

 04-04-2020
1.00
drilling RR 1#4
Details
       

 04-04-2020
1.00
Drilling Rear Ribs to spar
Details
       

 04-04-2020
2.00
All Ribs located
Details
     

 03-28-2020
0.50
Rear Spar drilling
Details
       

 03-28-2020
1.00
Finish Drill Rib L's and start Rear Spar
Details
       

 03-28-2020
1.00
Drilling all doublers to rear spar
Details
       

 03-23-2020
1.50
Starting wings, Aileron Belcrank Support
Details
       

 03-23-2020
1.00
Aileron Bellcrank Support Channel / rib support L'
Details
       

 03-23-2020
1.00
Aileron bell crank support
Details
       

 02-09-2020
3.00
Starting Wings
Details
       

 02-09-2020
1.00
Attatching spar tip
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.