KitLog pro

Powered By Kitlog Pro v2.0

Legal Eagle
Work Logs Found: 12
Category Work Time: 24 Hours
 Date
Hours
Work Log Summary

Details

 04-07-2019
1.00
Startup
Details
     

 04-07-2019
8.00
Preparing for a start
Details
       

 02-05-2017
1.00
First engine run
Details
     

 02-02-2017
2.00
Set up continues
Details
       

 02-01-2017
4.00
Setting up to run
Details
       

 01-27-2017
1.50
Design 2 made up
Details
       

 01-27-2017
1.00
Cooling tin design 2
Details
       

 01-24-2017
1.00
Cooling tin design 1
Details
       

 12-28-2016
2.00
Bed mount built
Details
       

 12-27-2016
0.50
Transport the engine
Details
       

 11-27-2016
0.50
Out of the box
Details
       

 11-17-2016
1.00
Engine ordered
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.