Powered By Kitlog Pro v2.0
Randy's 750 Cruzer Project
CH750 Cruzer
Fuselage
Work Logs Found:
97
Category Work Time:
243 Hours
Date
Hours
Work Log Summary
Details
12-10-2023
4.00
Installed control tunnel side panels
Details
09-13-2023
2.00
Drilled forward top skin
09-04-2023
1.00
Made drill guides for forward top skin
Details
01-22-2023
1.00
Installed SS rivets in cabin frame gusset
Details
01-08-2023
2.00
Rivetted side skin and firewall
12-30-2022
3.00
Finished side skin stiffeners passenger side
Details
12-10-2022
4.00
Finished side skin stiffeners pilot side
Details
12-03-2022
2.00
Began fabricating side skin stiffeners
09-11-2022
1.50
09-11-2022
1.00
09-03-2022
1.00
Installed passenger seat support brackets
08-28-2022
1.50
Riveted cabin frame - pilot side
08-28-2022
1.50
Riveted cabin frame - passenger side
08-27-2022
7.00
Installed landing gear brackets
08-20-2022
7.00
Joined rear and forward fuselage halves
08-14-2022
8.00
Re-assembled forward fuselage
10-02-2021
4.00
Continued reassembly of lower forward fuselage
09-25-2021
2.00
Reassemble lower forward fuselage
Details
07-05-2021
4.50
Disassemble and debur forward fuselage
05-31-2021
2.50
Drilled forward side skins
05-09-2021
2.00
Clecoed forward side skins to fuselage
02-07-2021
1.00
Made stiffener for upper baggage floor
Details
02-07-2021
1.00
Drilled cabin floor holes to final size - pilot si
Details
02-06-2021
2.00
Drilled gear channel L and pilot seat base side su
02-02-2021
1.00
Drilled pilot seat base to baggage floor
01-31-2021
2.50
Drilled & installed L brackets for pilot seat base
01-16-2021
4.00
Drilled pilot seat base and supports
01-10-2021
2.00
Drilled cabin frame front gussets
01-09-2021
1.00
Drilled gear channel doublers - Pilot side
01-09-2021
1.00
Drilled cabin frame holes to final size
01-03-2021
3.00
Drill main gear strut fitting - Pilot side
01-02-2021
3.00
Drilled cabin floor holes to final size - Passenge
Details
01-01-2021
3.00
Drilled gear channel doublers - Passenger side
Details
12-27-2020
3.00
Drilled gear channel L and seat base side support
Details
12-24-2020
3.00
Fitted and pilot drilled cabin frame
Details
12-13-2020
1.50
Drill main gear strut fitting - Passenger side
Details
11-28-2020
3.00
Drilled seat base and supports
Details
11-27-2020
4.00
Worked on getting seat base to fit
Details
10-04-2020
3.00
Worked on passenger side seat area
Details
10-03-2020
2.00
Join rear & forward fuselage and drill longerons
09-19-2020
3.50
Installed rudder pedals
Details
09-07-2020
2.00
Worked on fitting passenger side seat base
Details
09-06-2020
2.00
Drill and cleco L brackets for cabin sides
Details
09-05-2020
3.00
Drilled Front Sliding Seat Supports
Details
09-05-2020
2.00
Clecoed Cabin Sides and Floor Stiffeners
Details
08-29-2020
5.00
Forward Fuselage Floor: Locate, debur, cleco
Details
08-23-2020
2.50
Riveted Baggage area
Details
08-21-2020
3.00
Re-assembled the baggage area
Details
08-21-2020
2.00
Drilled 2" holes in the Flaperon Control Covers
Details
08-20-2020
1.00
Riveted everything I can at this point
Details
08-02-2020
4.00
Drilled & clecoed F4-2, drilled & riveted F4-6
Details
07-31-2020
2.00
Cut & drilled : angles for right baggage floor pan
Details
07-28-2020
1.00
Cut & drilled L angles for left baggage floor pane
07-27-2020
1.00
Locate debur baggage floor and control tunnel part
Details
07-26-2020
2.00
Clecoed seat belt bracket and rear baggage ares
Details
07-19-2020
1.00
Riveted Side Channel Doublers into place
07-12-2020
3.00
Worked on baggage floor and flaperon control cover
Details
07-06-2020
2.00
Drill Side Channel Doublers
Details
06-21-2020
2.00
Drilled L brackets and riveted to baggage floor
Details
06-20-2020
2.00
Started on baggage floor
Details
04-19-2020
1.00
Rivetted baggage area back panel to fuse sides
Details
04-19-2020
1.50
Finished rivetting top skin
Details
04-18-2020
2.00
Rivetted wing attachment brackets
Details
04-18-2020
4.00
Put top skin on fuselage and began rivetting
Details
04-14-2020
1.50
Finished assembly of baggage area back panel
Details
04-12-2020
2.00
Worked on the baggage area back panel
Details
04-11-2020
3.00
Worked on the backend of the rear fuselage
Details
04-07-2020
1.50
Fix L brackets and finish riveting longerons to to
Details
04-05-2020
1.00
Installed rear wing attachments on top channel
04-05-2020
2.00
Began riveting longerons to top skin
Details
04-04-2020
2.50
Drill baggage back panel top bracket
Details
03-29-2020
2.00
Prepared baggage back panel for drilling
Details
03-28-2020
1.00
Trimmed front edge of bottom longerons
03-28-2020
1.50
Riveted bottom longerons to side skins
03-25-2020
2.00
Cut & shaped fuel header tank support tube
Details
03-21-2020
3.00
Cut & drill support for fuel header tank
Details
03-17-2020
1.50
Debur holes in H.T. attachment brackets & side fus
03-16-2020
2.50
Drill H.T. attachment bracket & fuselage skin (L
Details
03-14-2020
3.00
Drill H.T. attachment bracket & fuselage skin (R)
Details
03-01-2020
3.00
Clecoed rear fuselage together
Details
02-29-2020
1.00
Riveted rear fuselage top rail
Details
02-29-2020
2.00
Installed nut plates for the hell hole
Details
02-09-2020
2.00
Debur #11 holes in top skin, longerons, top rail,
Details
02-08-2020
4.00
Drill #11 holes in top skin, longerons, top rail,
Details
01-25-2020
7.00
Debur top skin and rivet L brackets
Details
01-23-2020
1.50
Rivet L's to left side rear skin
Details
01-18-2020
2.00
Rivet L's to right side rear skin
Details
01-18-2020
4.00
Debur left side rear skin & cleco L's
Details
01-17-2020
2.50
Cleco L's and longeron to right side rear skin
Details
01-11-2020
3.50
Debur right side rear fuelage skin
Details
01-10-2020
1.50
Debur right side rear fuselage skin
Details
01-09-2020
2.00
Rivet bottom skin longerons
Details
01-05-2020
3.00
Cleco'd longerons to bottom skin
Details
01-04-2020
3.50
Cleco'd L & Z brackets to bottom skin and riveted
01-01-2020
3.50
Finished deburring parts and applied Cortec
Details
12-28-2019
3.00
Continued deburring bottom fuselage parts
12-27-2019
3.00
Debur bottom fuselage skin and parts
Details
SITE NAVIGATION
Contact Builder
CH750 Cruzer Home
Category
# Logs
# Hours
All
325
873
Brakes
4
13
Center Console
1
5
Controls
26
50
Elevator
18
44
Engine
8
24
Firewall
10
22
Fuel System
18
53
Fuselage
97
243
Horizontal Stablizer
24
63
Landing Gear
7
14
Miscellaneous
2
7
None
4
5
Prop
1
2
Rudder
1
7
Seats
6
10
Vertical Stabilizer
7
14
Wings
91
297
Copyright © 2001-2024 Matronics. All Rights Reserved.