|
|
|
|
DARREN'S WEB SITE
Work
Logs
Found:
67
|
Category Work Time: 355 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
03-06-2020
|
4.00
|
Trim, flaps etc
|
Details
|
|
|
01-20-2020
|
3.00
|
|
Details
|
|
|
12-25-2019
|
3.00
|
Fitting right hand control cluster
|
Details
|
|
|
12-24-2019
|
7.00
|
More wiring
|
Details
|
|
|
12-21-2019
|
5.00
|
Painted the cockpit rails and the central roll bar
|
Details
|
|
|
12-11-2019
|
5.00
|
Garmin setup stuff, made draft mount for oxygen/he
|
Details
|
|
|
12-07-2019
|
6.00
|
Park brake, oil shutter cables fitted
|
Details
|
|
|
12-06-2019
|
3.00
|
panel configuration, TOGA button, ipad mount tweak
|
Details
|
|
|
12-04-2019
|
7.00
|
panel switch lighting sorted
|
Details
|
|
|
12-03-2019
|
6.00
|
Air vent, GPS installed
|
Details
|
|
|
11-27-2019
|
7.00
|
panel wiring...and strengthening
|
Details
|
|
|
11-26-2019
|
2.00
|
USB installation to ipd mini
|
Details
|
|
|
11-23-2019
|
6.00
|
Decided to fit the panel..
|
Details
|
|
|
11-20-2019
|
7.00
|
wiring switches again...
|
Details
|
|
|
11-19-2019
|
3.00
|
Wiring fixed!
|
Details
|
|
|
11-18-2019
|
6.00
|
Connected the battery...
|
Details
|
|
|
11-17-2019
|
6.00
|
|
Details
|
|
|
11-16-2019
|
6.00
|
Wired the heated seats and the rear USB ports
|
Details
|
|
|
11-15-2019
|
4.00
|
more wiring to the CB panel
|
Details
|
|
|
11-13-2019
|
5.00
|
Right side switch panel
|
Details
|
|
|
11-12-2019
|
2.00
|
re-wiring, then putting it back as it was!
|
Details
|
|
|
11-10-2019
|
7.00
|
wiring...
|
Details
|
|
|
11-09-2019
|
7.00
|
wiring
|
Details
|
|
|
11-08-2019
|
2.00
|
panel
|
Details
|
|
|
11-06-2019
|
5.00
|
|
Details
|
|
|
11-04-2019
|
6.00
|
|
Details
|
|
|
11-03-2019
|
6.00
|
more wiring
|
Details
|
|
|
11-02-2019
|
7.00
|
Wiring...
|
Details
|
|
|
11-01-2019
|
4.00
|
more wiring...
|
|
|
|
10-30-2019
|
6.00
|
wiring...
|
Details
|
|
|
10-29-2019
|
4.00
|
wiring
|
Details
|
|
|
10-28-2019
|
6.00
|
wiring... starting to tidy up the looms a bit.
|
|
|
|
10-27-2019
|
8.00
|
wiring
|
Details
|
|
|
10-20-2019
|
6.00
|
switches and mags...
|
Details
|
|
|
10-19-2019
|
7.00
|
wiring woes
|
Details
|
|
|
10-16-2019
|
7.00
|
more wiring..
|
Details
|
|
|
10-15-2019
|
2.00
|
Wiring
|
Details
|
|
|
10-13-2019
|
5.00
|
panel syub frame, front stick Torsten wiring
|
Details
|
|
|
10-12-2019
|
6.00
|
GTN and DME wiring
|
Details
|
|
|
10-08-2019
|
5.00
|
panel wiring
|
Details
|
|
|
10-07-2019
|
4.00
|
Can bus wiring finished
|
Details
|
|
|
10-06-2019
|
7.00
|
Wiring
|
Details
|
|
|
10-05-2019
|
7.00
|
Wiring again...
|
Details
|
|
|
10-04-2019
|
3.00
|
Wiring
|
Details
|
|
|
10-03-2019
|
2.00
|
CAN bus fabricated
|
Details
|
|
|
10-02-2019
|
9.00
|
Wired the main port side switch bank
|
Details
|
|
|
10-01-2019
|
2.00
|
switches..
|
Details
|
|
|
09-30-2019
|
7.00
|
I hate wiring!
|
Details
|
|
|
09-28-2019
|
7.00
|
|
Details
|
|
|
09-26-2019
|
3.00
|
Avionics bay cover
|
Details
|
|
|
09-25-2019
|
7.00
|
Panel and ventilation
|
Details
|
|
|
09-23-2019
|
5.00
|
Panel fitting, more issues!
|
Details
|
|
|
09-22-2019
|
6.00
|
|
Details
|
|
|
09-21-2019
|
8.00
|
wiring the panel started..
|
Details
|
|
|
09-18-2019
|
6.00
|
AOA installed, main bus bars fabricated
|
Details
|
|
|
09-14-2019
|
8.00
|
Panel prep, GTN rack fitted, brakes and oil cooler
|
Details
|
|
|
09-13-2019
|
4.00
|
|
|
|
|
09-12-2019
|
7.00
|
More hole cutting...
|
Details
|
|
|
09-11-2019
|
8.00
|
Panel woes...
|
Details
|
|
|
09-10-2019
|
4.00
|
avionics shelf fabricated
|
Details
|
|
|
09-09-2019
|
6.00
|
wiring commences
|
Details
|
|
|
09-06-2019
|
2.00
|
dimmers for lighting installed
|
Details
|
|
|
09-05-2019
|
3.00
|
Panel prep
|
Details
|
|
|
09-04-2019
|
9.00
|
Panel work
|
Details
|
|
|
09-02-2019
|
6.00
|
Edge trim and vent/heater panel made
|
Details
|
|
|
09-01-2019
|
2.00
|
Flap switch added
|
Details
|
|
|
08-30-2019
|
4.00
|
Cut the main panel and holes for avionics
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |