Powered By Kitlog Pro v2.0
Swami's Web Site
RV-7
baffles
Work Logs Found:
28
Category Work Time:
78 Hours
Date
Hours
Work Log Summary
Details
04-06-2019
1.00
Install silicone grommet for fuel pass through
Details
07-07-2018
2.00
install PMag blast tube
06-12-2018
1.00
start R inlet air seal
06-11-2018
1.50
rivet L+R aft air seal fabric
06-10-2018
1.00
finish FAB, cut l+r aft baffle seal
06-09-2018
4.50
more finish work on left ramp and filter bypass
06-06-2018
3.50
complete left ramp and snorkle
06-04-2018
12.00
build left ramp and snorkle
06-03-2018
2.00
start buiding new left ramp
05-29-2018
1.50
paint baffles, remove cowl pin cover emblem blanks
05-28-2018
1.00
prime baffles; order new left ramp
05-28-2018
1.50
dissassemble baffles, sand cylinder fins
05-26-2018
2.00
STOP - left ramp cut too short for snorkle
05-26-2018
1.00
start baffle rubber seal
05-26-2018
9.00
complete baffle metal work
05-07-2018
1.50
Fabricate oil cooler angle brace
05-05-2018
2.00
rivet oil cooler doubler. Drill heat hole
05-04-2018
2.50
finsh baffle trim, dissassemble, debur
05-02-2018
1.50
trim baffles for cowl airguide ramps
04-29-2018
2.00
trim baffles to top cowl
04-28-2018
2.00
rivet fwd baffles
04-28-2018
9.00
more baffle construction
04-23-2018
1.50
trim ramp baffles
04-22-2018
4.00
more baffle construction
04-21-2018
1.50
start on baffles again
04-21-2018
1.50
more baffle work
03-10-2018
1.00
start baffle construction
03-10-2018
4.00
continue baffle const., prime spinner bulkhead
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92
Copyright © 2001-2024 Matronics. All Rights Reserved.