Work Logs Found: 28
Category Work Time: 78 Hours
 Date
Hours
Work Log Summary

Details

 04-06-2019
1.00
Install silicone grommet for fuel pass through
Details

 07-07-2018
2.00
install PMag blast tube

 06-12-2018
1.00
start R inlet air seal

 06-11-2018
1.50
rivet L+R aft air seal fabric

 06-10-2018
1.00
finish FAB, cut l+r aft baffle seal

 06-09-2018
4.50
more finish work on left ramp and filter bypass

 06-06-2018
3.50
complete left ramp and snorkle
       

 06-04-2018
12.00
build left ramp and snorkle
       

 06-03-2018
2.00
start buiding new left ramp

 05-29-2018
1.50
paint baffles, remove cowl pin cover emblem blanks

 05-28-2018
1.00
prime baffles; order new left ramp

 05-28-2018
1.50
dissassemble baffles, sand cylinder fins

 05-26-2018
2.00
STOP - left ramp cut too short for snorkle

 05-26-2018
1.00
start baffle rubber seal

 05-26-2018
9.00
complete baffle metal work

 05-07-2018
1.50
Fabricate oil cooler angle brace
     

 05-05-2018
2.00
rivet oil cooler doubler. Drill heat hole

 05-04-2018
2.50
finsh baffle trim, dissassemble, debur

 05-02-2018
1.50
trim baffles for cowl airguide ramps

 04-29-2018
2.00
trim baffles to top cowl

 04-28-2018
2.00
rivet fwd baffles
     

 04-28-2018
9.00
more baffle construction
     

 04-23-2018
1.50
trim ramp baffles

 04-22-2018
4.00
more baffle construction
       

 04-21-2018
1.50
start on baffles again

 04-21-2018
1.50
more baffle work

 03-10-2018
1.00
start baffle construction

 03-10-2018
4.00
continue baffle const., prime spinner bulkhead