Powered By Kitlog Pro v2.0
Swami's Web Site
RV-7
wiring
Work Logs Found:
43
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
05-31-2020
0.00
wiring pictures
05-31-2020
0.00
ELT ID / Hex picture
05-31-2020
0.00
ELT equipment pictures
05-03-2020
2.50
Secure right wing AP wires; install aeleron trim h
04-26-2020
4.50
Secure L wing wires; Re-run right wing wires
Details
04-21-2020
1.50
Torque all spar bolts; Wings attached complete
04-21-2020
2.50
fix left OAT wiring; safety wire Pitch AP
Details
11-30-2019
1.00
Wire OAT sensor in Right wing
11-29-2019
2.00
Pick up keys to Hanger; wire OAT in Left wing
06-28-2019
2.50
complete and attache wires to aft fuse securements
Details
06-24-2019
2.00
Install wire securements in aft fuselage
Details
05-26-2019
3.00
complete wire wrap fwd tunnel
Details
04-21-2019
1.00
start final wire bundle wrap under forward fuse
Details
01-26-2019
1.50
Rewire diode to "I" and starter Keywire to "S" on
Details
01-26-2019
3.50
Install aileron trim box and wire.
Details
01-13-2019
1.00
stick grip switch test- Flap up/down reversed
Details
01-13-2019
1.00
correct stick flap wiring.test intercom OK
Details
01-12-2019
4.00
wire 9 pin DSUB for both stick grips
Details
12-28-2018
3.00
Confirm and attach all ACM harnesses
Details
12-24-2018
2.00
Wire panel Pwr relay; Battery; Aileron trim/ Fans
Details
12-15-2018
2.50
Wire strobe +tail + ldg light molex
Details
11-11-2018
1.00
Install L wing landing light molex
Details
11-10-2018
4.50
wire seat heat and CO2 monitor to ACM
Details
10-30-2018
1.00
Complete Rt wing light/strobe molex, fuel sender m
Details
10-29-2018
2.00
Complete ACM rear harness; Run R wing strobe wire
Details
10-28-2018
3.50
Completed ACM stick harness; L+r wing light molex
Details
10-22-2018
2.50
Complete ACM Flap/trim harness; Prep ACM rear/stic
Details
10-20-2018
2.00
Run Landing light wires to panel; re-run cables
Details
10-13-2018
5.00
Re-install strobe molex with ground;Pitot+Flap Mol
Details
10-08-2018
1.50
Install Flap motor molex
Details
10-08-2018
1.50
determined Stobe wire shielding ground
Details
10-08-2018
5.00
completed cable routing and install
Details
10-07-2018
1.50
Run fuel/stall wires
Details
10-07-2018
2.50
Install AMP connects on wing tail wires
Details
10-06-2018
3.50
Wire bundle path through spar
Details
10-06-2018
1.00
Stert running wing wires from panel
Details
10-06-2018
1.00
Run Stick wires, Flap Position wire
Details
10-06-2018
1.00
install GPS antenna
Details
10-06-2018
1.50
Install ELT
Details
09-30-2018
2.00
run,installADS-B, XPDR, Comm wires
Details
09-30-2018
3.00
AP pitch dsub, fwd center tunnel cover
Details
09-22-2018
3.00
research and seek tech support AP/PMag/Stick
Details
09-22-2018
2.00
Flap motor and pitch AP wire routing
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92
Copyright © 2001-2024 Matronics. All Rights Reserved.