KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
Work Logs Found: 41
Category Work Time: 104 Hours
 Date
Hours
Work Log Summary

Details

 05-30-2020
4.50
Corrected EGT and Radio issue
Details
       

 05-15-2020
3.00
IFR transponder certification; entered in Airframe
Details

 05-02-2020
3.00
Calibrate Left wing tank fuel float. Changed K val
Details

 04-29-2020
2.50
Trouble shoot boost pump wiring
Details

 04-29-2020
3.00
Calibrate Left fuel tank resistance float
Details

 10-14-2019
3.50
Dehydrate plugs; Install dynon GPS antenna, avioni
Details

 08-11-2019
3.00
Install mag compass, Dynon Skyview GPS antenna
Details

 01-11-2019
1.00
contacted AFS about shunt to master relay
Details

 01-06-2019
2.00
Garmin GTN 625 ops check; bleed brakes
Details
       

 01-04-2019
1.00
start to charge b/u battery via HDX
Details
       

 12-29-2018
2.00
ALT-ANL-Shunt-Master wiring error corrected
Details

 12-28-2018
2.00
FIRST AVIONICS POWER-ON TEST
Details
       

 09-29-2018
3.00
complete install of ADS-B, xpdr, comm antenna
Details

 09-29-2018
1.00
complete ADS-B standoff install
Details

 09-29-2018
4.50
begin xpdr and comm antenna install
Details

 09-22-2018
1.00
built subpanel standoff for ADS-B box
Details

 09-08-2018
3.50
lable wires

 09-08-2018
3.00
Install #2 +#4 CHT, EGT wires

 08-26-2018
1.50
Install LR3-14 Voltage regulator
     

 08-26-2018
2.00
complete ACM front connector harness, Run ADAHRS a
     

 08-25-2018
6.00
wire front connector harness, P-leads
       

 08-25-2018
2.00
more wiring

 08-19-2018
0.50
wire red cube

 08-19-2018
3.00
wire oil press/temp, MP press, Fuel Press sensors

 08-13-2018
1.00
run more wires

 08-12-2018
2.50
run and label EMS engine sensor harness
     

 08-08-2018
3.00
install aux bus, install ACM ground, pwr and batt
       

 08-06-2018
2.50
Run strobe wires to tail. install spark pug wires,

 08-03-2018
9.50
install subpanel nutplates, Adel clamps fwd fuse

 07-22-2018
4.00
Fabricate subpanel and panel cable guides
Details

 07-21-2018
1.00
Run AP servo wire bundle

 07-21-2018
3.00
Install ADAHRS in rear fuse
Details

 07-08-2018
2.00
install CO and ELT in panel
Details

 07-07-2018
1.75
rebuild panel vent attach angles
       

 07-07-2018
1.00
complete panel vent angles, prime

 07-04-2018
3.00
install subpanel avionics boxes
       

 05-28-2018
2.00
install subpanel platenuts for batt and ADS-B
     

 05-28-2018
3.00
install shunt and ANL on firewall. plan subpanel
     

 05-28-2018
1.00
cut GPS hole in subpanel
     

 05-11-2018
0.00
received Advaced flight systems quick panel
       

 01-01-2018
2.00
instal D9 on Pitch servo










Copyright © 2001-2024 Matronics. All Rights Reserved.