Powered By Kitlog Pro v2.0
Swami's Web Site
RV-7
Engine
Work Logs Found:
44
Category Work Time:
77 Hours
Date
Hours
Work Log Summary
Details
06-14-2020
1.50
Run #4. Amp ok; prop ok, mag chk ok
Details
06-07-2020
3.00
removed and reclock prop governor control arm
Details
06-07-2020
2.00
3rd engine run
Details
06-06-2020
4.00
2nd engine run; finished interior
Details
05-26-2020
2.00
FIRST ENGINE START
Details
05-22-2020
3.00
check slick mag timing; install tempest plugs
Details
05-18-2020
1.75
set PMag timing; check prop gov control; install l
Details
05-17-2020
3.00
First turn-over of engine;check prop tip tracking
Details
04-30-2020
1.50
Fuel flow test right wing tank
Details
04-30-2020
3.00
Conduct fuel flow test left wing
Details
09-18-2019
1.00
Dehydrate plugs
06-20-2019
0.00
ordered FWF fuel line from TSflightlines
Details
06-16-2019
0.00
dehydrate spark plugs
05-18-2019
0.00
Dehydrate plugs
04-14-2019
0.50
replace spark plug dehyrators
07-07-2018
2.00
sand snorkle inlet to fit
07-05-2018
1.00
install EGT probes
07-05-2018
3.00
fiberglass build-up snorkle inlet. Install CHT pro
07-04-2018
1.00
install engine heater electrical cord
05-08-2018
1.50
install oil cooler brace, fab and install cyl #4 b
04-21-2018
1.00
review installation of snorkle
04-15-2018
0.00
dehydrate engine plugs
02-24-2018
2.50
install seat tube, breather oil scavenge, fuel lin
02-11-2018
2.00
install Manifold press sensor. research engine wir
02-08-2018
2.50
finish installing exhaust and hangers
02-07-2018
1.50
start installing exhaust
02-06-2018
1.50
measure hoses for new order
02-03-2018
1.50
install sniffle valve, alternator
02-03-2018
1.50
install new mix arm hdw + throttle bracket
02-03-2018
1.00
install fuel vent line
01-22-2018
2.50
install oil press line and sensor. test fit fuel i
01-21-2018
0.75
test fit prop gov cable. test good
01-21-2018
2.00
start install oil temp, fuel press sensors
01-15-2018
2.00
STOP. can't figure out mixture geometry
Details
01-15-2018
1.00
start install mixture brackets
01-15-2018
1.50
research throttle and mixture brackets
01-15-2018
1.50
final torque and cotter pin engine mount bolts
01-14-2018
2.00
Hang engine
Details
01-13-2018
4.50
prep engine install. start cowl hinge install
01-07-2018
2.00
install prop governor and rod end bearing
01-06-2018
2.50
work on prop governor, cable bracket
12-30-2017
3.00
Install Reiff cylinder heater bands
12-18-2017
1.00
Recieved engine
05-31-2017
1.00
Inventory firewall forward kit
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92
Copyright © 2001-2024 Matronics. All Rights Reserved.