KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
Work Logs Found: 44
Category Work Time: 77 Hours
 Date
Hours
Work Log Summary

Details

 06-14-2020
1.50
Run #4. Amp ok; prop ok, mag chk ok
Details
       

 06-07-2020
3.00
removed and reclock prop governor control arm
Details
       

 06-07-2020
2.00
3rd engine run
Details
       

 06-06-2020
4.00
2nd engine run; finished interior
Details
     

 05-26-2020
2.00
FIRST ENGINE START
Details
       

 05-22-2020
3.00
check slick mag timing; install tempest plugs
Details
       

 05-18-2020
1.75
set PMag timing; check prop gov control; install l
Details
       

 05-17-2020
3.00
First turn-over of engine;check prop tip tracking
Details
       

 04-30-2020
1.50
Fuel flow test right wing tank
Details

 04-30-2020
3.00
Conduct fuel flow test left wing
Details

 09-18-2019
1.00
Dehydrate plugs

 06-20-2019
0.00
ordered FWF fuel line from TSflightlines
Details

 06-16-2019
0.00
dehydrate spark plugs

 05-18-2019
0.00
Dehydrate plugs

 04-14-2019
0.50
replace spark plug dehyrators

 07-07-2018
2.00
sand snorkle inlet to fit

 07-05-2018
1.00
install EGT probes
       

 07-05-2018
3.00
fiberglass build-up snorkle inlet. Install CHT pro
     

 07-04-2018
1.00
install engine heater electrical cord
     

 05-08-2018
1.50
install oil cooler brace, fab and install cyl #4 b
     

 04-21-2018
1.00
review installation of snorkle

 04-15-2018
0.00
dehydrate engine plugs

 02-24-2018
2.50
install seat tube, breather oil scavenge, fuel lin

 02-11-2018
2.00
install Manifold press sensor. research engine wir

 02-08-2018
2.50
finish installing exhaust and hangers
       

 02-07-2018
1.50
start installing exhaust

 02-06-2018
1.50
measure hoses for new order

 02-03-2018
1.50
install sniffle valve, alternator
     

 02-03-2018
1.50
install new mix arm hdw + throttle bracket
     

 02-03-2018
1.00
install fuel vent line
     

 01-22-2018
2.50
install oil press line and sensor. test fit fuel i

 01-21-2018
0.75
test fit prop gov cable. test good

 01-21-2018
2.00
start install oil temp, fuel press sensors

 01-15-2018
2.00
STOP. can't figure out mixture geometry
Details
       

 01-15-2018
1.00
start install mixture brackets

 01-15-2018
1.50
research throttle and mixture brackets

 01-15-2018
1.50
final torque and cotter pin engine mount bolts

 01-14-2018
2.00
Hang engine
Details
       

 01-13-2018
4.50
prep engine install. start cowl hinge install

 01-07-2018
2.00
install prop governor and rod end bearing
       

 01-06-2018
2.50
work on prop governor, cable bracket
       

 12-30-2017
3.00
Install Reiff cylinder heater bands

 12-18-2017
1.00
Recieved engine
       

 05-31-2017
1.00
Inventory firewall forward kit










Copyright © 2001-2024 Matronics. All Rights Reserved.