Powered By Kitlog Pro v2.0
Swami's Web Site
RV-7
firewall forward
Work Logs Found:
29
Category Work Time:
74 Hours
Date
Hours
Work Log Summary
Details
06-13-2020
3.00
Install new shunt; install new pitot controller
Details
06-03-2020
1.50
installed upper cowl; re-installed rear harness
Details
06-02-2020
1.50
cut upper cowl and re-fiberglassed; Pitot troubles
Details
04-07-2020
4.50
install emag wires; install trim clip on stick; pa
04-02-2020
2.50
finish breather tube routing; tighten lower oil co
04-01-2020
2.00
install alt air cable; trim and tighten spinner pr
03-27-2020
5.50
called B&C Alt bracket misalign; more securement
03-24-2020
7.00
more securement of wires and hoses
03-22-2020
1.50
conect EMS sensor #1(P4) to battery
Details
03-21-2020
6.50
set prop gov hose; secure hoses/wires FWF
Details
03-31-2019
1.00
Install platenut per EAA tech counselor
Details
12-27-2018
4.00
Research and install PMag wiring
Details
12-26-2018
5.00
Misc FWF wiring; work on static line installation
Details
12-23-2018
1.50
Wire Reiff sump heat
Details
12-15-2018
3.50
Complete CHT/EGT wire connectors
Details
02-08-2018
2.00
started install oil seperator
Details
12-31-2017
1.50
install master + starter solinoid
12-30-2017
0.50
torque all fwd fuse blue fitings
12-23-2017
1.00
seal firewall recess
12-23-2017
0.50
rivet firewall recess
12-23-2017
3.00
install engine mount start gear legs
Details
11-11-2017
1.00
replace battery box with earth x box
08-04-2017
2.00
install...then remove firewall recess
08-02-2017
3.00
reorient cabin heat valve
Details
07-31-2017
3.00
drill mixture+prop pass throughs
Details
07-30-2017
1.00
drill throttle pass through
07-16-2017
1.00
replace red cube nutplate. Plan ground plate locat
07-16-2017
2.50
install firwall passthrough (2)
07-15-2017
1.00
install nutplates on red cube brace
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92
Copyright © 2001-2024 Matronics. All Rights Reserved.