Swami's Web Site
RV-7
landing gear
Work Logs Found:
17
Category Work Time:
26 Hours
Date
Hours
Work Log Summary
Details
04-01-2020
1.50
fix brake reservour seep
Details
07-13-2019
1.50
Bleed brakes
Details
07-09-2019
1.00
2 x bleed brakes
Details
07-07-2019
1.00
bleed brakes-still has air in line
01-26-2019
0.50
Re-bleed brakes
Details
01-21-2019
1.00
Re-bleedbrakes
Details
02-24-2018
2.25
install right brake line
02-05-2018
1.50
install tailwheel, measure fuel line
02-04-2018
3.50
install tailwheel zirk, ELT bracket
01-08-2018
1.50
install tailwheel
Details
12-30-2017
2.00
install left main brake line
12-29-2017
2.00
paint tailwheel hardware.start engine build-up
12-26-2017
1.70
finish install right main gear wheel
12-25-2017
1.00
finish install of left main wheel
Details
12-24-2017
1.00
start install of wheels/brakes/tires
12-23-2017
1.00
install right main gear leg
10-23-2017
2.00
build up main tire/wheel assembly
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92