Powered By Kitlog Pro v2.0
Swami's Web Site
RV-7
canopy
Work Logs Found:
73
Category Work Time:
160 Hours
Date
Hours
Work Log Summary
Details
10-14-2019
3.00
open canopy after glassing windscreen; install rol
Details
10-13-2019
1.00
sand windscreen to one thickness of tape
Details
10-05-2019
3.00
sand windscreen; apply first coat of rage gold fil
Details
09-28-2019
1.00
sand and add glass to left aft corner of windscree
Details
09-25-2019
1.00
sand windscreen
Details
09-22-2019
1.50
start sanding windscreen
Details
09-21-2019
6.50
finish layup of fiberglass on windscreen
Details
09-01-2019
1.50
cut fiberglass cloth to templates
Details
08-31-2019
3.50
retape canopy prep for fiberglass layup. re-cut te
Details
08-25-2019
1.50
Cut templates forwinscreen fiberglass layups
Details
08-22-2019
3.00
Sand and apply second coat of epoxy to windscreen
Details
08-21-2019
2.00
Apply epoxy filler to edge of windscreen
Details
08-20-2019
1.00
Finish installing windscreen clips
Details
08-17-2019
3.50
Install canopy windscreen + prep clip attachments
Details
07-04-2018
3.00
fiberglass cowl air inlet ramp dams
12-20-2017
1.00
heat canopy to finish riveting. organize garage
12-20-2017
3.00
finish riveting canopy canopy complete
11-22-2017
1.50
rivet center spine and forward canopy plexi to fra
Details
11-18-2017
3.00
Install roll bar. Rivet left F791 canopy skirt bra
Details
11-18-2017
0.50
fab canopy finger tabs on canopy side skirt
11-13-2017
1.50
drill and final assembly of canopy rear slide rail
11-12-2017
3.00
paint all canopy parts with enamel
11-11-2017
2.00
prime canopy frame and roll bar
11-11-2017
2.00
disassemble roll bar. sand for paint
11-10-2017
2.50
finish side skirts. prime and paint
11-10-2017
2.50
disassemble canopy- sand frame for paint
11-09-2017
4.00
trim aft skirt. replace left side skirt
Details
10-29-2017
1.00
screw on side skirts
10-29-2017
4.00
drill aft skirts
10-28-2017
1.00
paint canopy side skirt
Details
10-25-2017
1.50
prime side skirts. continue aft skirt shaping
10-23-2017
1.50
shape left aft skirt
10-21-2017
1.50
start aft skirt measuring
Details
10-21-2017
1.00
prep skirt brace to drill. trim rear skirt
Details
10-21-2017
3.50
drill left and right side skirt/skirt brace
10-20-2017
2.00
fab and drill left F791 canopy skirt brace
10-16-2017
1.00
trim rear pin mount to clear skirt brace
10-16-2017
1.00
drill right skirt brace to canopy side skirt
10-15-2017
1.50
fab and drill right skirt brace
10-14-2017
1.50
complete canopy latch
10-14-2017
5.00
canopy skirts and braces
Details
09-25-2017
2.00
start canopy side skirts
09-25-2017
1.50
finish supertracks
09-25-2017
5.00
complete canopy aft pin mounts. supertracks
Details
09-24-2017
3.00
countersink and drill windshield
Details
09-24-2017
2.00
canopy aft pin mount
09-23-2017
4.00
start install of canopy latch
09-16-2017
3.50
fab nutplate strip for canopy side rail
09-16-2017
2.00
drill canopy plexi to 5/32" frame to #30
09-16-2017
2.00
countersink canopy plexi
09-04-2017
5.50
trim and drill winshield. install canopy rollers
09-04-2017
1.00
start forming windshield
09-03-2017
2.50
trim canopy sides and front
09-03-2017
1.50
drill and cleco canopy to frame
09-03-2017
1.00
backdrill canopy center cover strip
09-02-2017
2.50
mask and cut canopy sides to bottom of frame
09-02-2017
4.00
Canopy BIG CUT
Details
08-27-2017
1.00
drill canopy latch hole in plexi
Details
08-27-2017
2.00
cut fwd and aft molding flanges
Details
08-26-2017
1.50
prep workspace for canopy bubble
08-25-2017
2.00
bend canopy frame
08-20-2017
2.00
drill fwd/aft canopy side rail holes
Details
08-17-2017
2.00
make initial measurements-cut canopy frame fwd tub
Details
08-16-2017
2.00
adjust canopy frame to longeron shape
08-13-2017
1.00
fab rail deck spacer
Details
08-12-2017
1.00
study plan on canopy construction
08-12-2017
2.50
rivet side canopy rails. touch-up paint
08-12-2017
1.00
rivet canopy slider rail/spacer
08-12-2017
2.50
build canopy slide rail and spacer
08-07-2017
2.00
read instructions, remove roll bar, fwd fuse skin
08-06-2017
3.00
drill roll bar brace. start canopy rails
08-06-2017
1.50
Attach roll bar
08-05-2017
1.00
start drilling roll bar attach holes
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
758
1968
Avionics
41
104
baffles
28
78
canopy
73
160
cowling
34
71
Empennage
85
259
Engine
44
77
Equipment
8
firewall forward
29
74
Fuselage
223
698
Interior
10
32
landing gear
17
26
Lights
5
14
Miscellaneous
21
57
None
3
2
practice
5
12
Prop
7
20
Shop Supplies
1
1
Tools
3
3
Wings
78
188
wiring
43
92
Copyright © 2001-2024 Matronics. All Rights Reserved.