 05-23-2020
1.50
record all EMS sensor settings; calibrate AP

 05-23-2020
2.00
prep for first start; note radio transmit not work
Details

 05-22-2020
4.00
weight and balance complete and put in airframe lo
Details

 05-22-2020
0.10
submit airworthiness paperwork to FAA
Details
       

 05-16-2020
6.50
install Flap sensor; wing walk anti-slip; baggage
Details

 05-15-2020
3.50
Tap 3/8' tie down bolts; pack wheel bearings
     

 05-15-2020
1.00
re-install snorkle to servo using longer bolts

 05-09-2020
3.50
Install R wing fairing; securefuel line; safetywir
Details

 05-08-2020
9.00
RTVBaffles; install slick mag plug wires; safety w

 05-05-2020
2.00
secure R brake line to gear leg; work tail wheel c
     

 05-04-2020
3.00
Replace fuel filter; secure left brake line to gea

 04-25-2020
1.50
EAA tech counselor visit
Details

 01-11-2020
6.00
Moved everything to hanger
Details
       

 11-02-2019
1.50
Install earthX battery
Details

 08-16-2019
2.00
Dehydrate plugs; Secure adel clamps under fwd fuse
Details

 07-13-2019
2.00
rehydrate plugs; cleco front skin, ready to rivet
Details

 07-13-2019
2.00
Finish Bleed; Finish cowl RV7 cover; secure subpan
Details
     

 03-30-2019
1.00
clean-up shop-order silicone fuel/baffle pass- thr

 01-19-2019
1.00
EAA Tech Advisor visit

 09-22-2018
2.00
repair fuel pump drain / drill main spare pass thr
Details

 01-07-2017
2.00
reorganize garage