Powered By Kitlog Pro v2.0
JOHN'S WEB SITE
V-Twin
Controls
Work Logs Found:
39
Category Work Time:
98 Hours
Date
Hours
Work Log Summary
Details
12-04-2020
1.50
Control sticks
Details
01-04-2020
1.00
Stick grips
Details
01-04-2020
3.00
Elevator trim
Details
01-02-2020
2.00
Elevator trim actuator
Details
12-07-2019
2.00
Rudder
Details
12-05-2019
1.00
Rudder
Details
12-04-2019
2.00
Rudder finish
Details
12-04-2019
1.00
Aileron arms
Details
12-03-2019
2.00
Aileron bell cranks.
Details
11-15-2019
2.00
Rudder work
Details
11-06-2019
3.50
Aileron linkage
Details
11-05-2019
3.00
Aileron linkage
Details
11-02-2019
3.00
Aileron linkage
Details
10-31-2019
1.00
Aileron bellcrank bardpoints
Details
10-30-2019
2.00
Bell crank hardpoints
Details
10-29-2019
2.50
Rudder control work
Details
10-28-2019
4.50
D bulkheads
Details
10-27-2019
4.50
Rudder cables
Details
10-25-2019
1.00
Rudder arm slots
Details
10-24-2019
1.50
rudder cable tubing
Details
10-20-2019
1.50
Rudder cables
Details
10-19-2019
2.00
Right rudder pedal arm
Details
05-22-2019
0.50
Aileron hinges
Details
05-22-2019
1.00
Details
05-14-2019
2.00
Brake lines on pedals
Details
04-01-2019
1.00
Trim actuator
Details
03-28-2019
2.00
Stabilizer tube
Details
03-13-2019
2.00
Aileron controls
Details
03-12-2019
5.00
Aileron controls
Details
03-09-2019
4.00
Aileron controls
Details
03-08-2019
2.50
Aileron controls
Details
03-07-2019
6.50
Aileron controls
Details
02-28-2019
6.00
Control tubes
Details
02-27-2019
4.00
Rudder pedal mounting
Details
02-26-2019
3.00
Rudder pedals
Details
02-25-2019
2.00
Side sticks
Details
02-24-2019
5.00
Side stick mounting
Details
01-17-2019
2.00
Rudder pedal assembly
Details
01-10-2019
2.00
Paint rudder tube
Details
SITE NAVIGATION
Contact Builder
V-Twin Home
Category
# Logs
# Hours
All
732
2876
Canard
43
153
Controls
39
98
Electrical
71
394
Engine
169
624
Fuel system
23
62
Fuselage
248
1073
Landing gear
69
252
Miscellaneous
9
28
None
1
6
Preparation
3
15
Wings
57
171
Copyright © 2001-2024 Matronics. All Rights Reserved.