Daves Sonex Web Site
Work Logs Found: 19
Category Work Time: 53 Hours
 Date
Hours
Work Log Summary

Details

 11-01-2019
0.01
FAA DAR Inspection.
Details
       

 10-23-2019
1.50
Fueled airplane and calibrated the fuel tank, EFIS
Details
       

 10-21-2019
3.00
Worked on radio. Calibrate eletronic fuel sender.
Details
       

 10-18-2019
4.00
Working on Radio and wires.
Details
       

 10-17-2019
2.00
Applied required lables to the instrument panel.
Details
     

 10-16-2019
1.00
Completed the Weight and Balance.
Details
       

 10-10-2019
4.00
Installed the aft bottom skin.
Details
     

 10-09-2019
4.00
Rigged ail.erons and flaps
Details
       

 10-07-2019
3.00
Rear luggage turtle-deck panel. installed position
Details
       

 10-04-2019
3.00
Install flaps and ailerons.
Details
       

 10-03-2019
5.00
Balance ailerons, rivet wing walk and continue wit
Details
     

 10-02-2019
5.00
Final Assembly of several items.
Details
       

 10-01-2019
4.00
Install the wings.
Details
       

 09-30-2019
1.00
Transport the plane to the Goshen In airport
Details
       

 09-28-2019
3.00
Numerous final assembly inspections and task.
Details
       

 09-28-2019
0.01
Continued.
Details
       

 09-28-2019
3.01
Continued
Details
       

 09-27-2019
2.50
Installed gear fairing and wheel pants.
Details
       

 09-26-2019
4.00
Finished working on the firewall forward wiring.
Details
       