Date
|
Hours
|
Work Log Summary
|
Details
|
04-27-2020
|
3.00
|
TO DO PRIMING CHECKLIST
|
Details
|
|
|
04-27-2020
|
2.00
|
TO DO CHECK LUCIO stiffener F 1047 X fitting
|
Details
|
|
|
04-27-2020
|
2.00
|
TAILCONE matchdrill longerons
|
Details
|
|
|
04-27-2020
|
1.00
|
TAILCONE CHECK LUCIO cover plate dimples and final
|
Details
|
|
|
04-27-2020
|
1.00
|
RUDDER : TO DO LUCIO sealant on trailing edge and
|
Details
|
|
|
04-27-2020
|
1.00
|
HS TO DO LUCIO rivet rear spar assembly
|
Details
|
|
|
04-27-2020
|
1.00
|
ELEVATOR: TODO LUCIO trailing edge double flush ri
|
Details
|
|
|
04-26-2020
|
1.00
|
TAILCONE mark NO dimple holes and dimple bulkheads
|
Details
|
|
|
04-26-2020
|
1.50
|
TAILCONE dimple F-1047 stiffeners
|
Details
|
|
|
04-25-2020
|
3.00
|
TAILCONE dimpling skins
|
Details
|
|
|
04-24-2020
|
2.00
|
TAILCONE dimple skins
|
Details
|
|
|
04-24-2020
|
2.00
|
TAILCONE dimple skins
|
Details
|
|
|
04-24-2020
|
3.00
|
TAILCONE dimple F-824B cover plates for #6 screws
|
Details
|
|
|
04-23-2020
|
0.20
|
TAILCONE Eyebolt hole
|
Details
|
|
|
04-23-2020
|
0.50
|
TAILCONE dimble F-1012B, F-1012A F-1014
|
Details
|
|
|
04-23-2020
|
1.00
|
TAILCONE Countersink rudder stop and dimple rudder
|
Details
|
|
|
04-22-2020
|
2.50
|
TAILCONE holes and edge deburring
|
Details
|
|
|
04-21-2020
|
3.50
|
TAILCONE holes and edges deburring
|
Details
|
|
|
04-20-2020
|
2.50
|
TAILCONE deburr edges and skins
|
Details
|
|
|
04-19-2020
|
0.50
|
TAILCONE dimple F-1006
|
Details
|
|
|
04-19-2020
|
4.00
|
TAILCONE deburr holes and edges
|
Details
|
|
|
04-18-2020
|
4.00
|
TAILCONE Deburr holes and Edges
|
Details
|
|
|
04-18-2020
|
1.00
|
F-1074 X Stiffener wrongly positioned
|
Details
|
|
|
04-11-2020
|
2.00
|
ELEVATOR blind rivet ribs halves with LP4-3
|
Details
|
|
|
04-10-2020
|
2.00
|
RUDDER riveted bottom rib, spar, top and counterba
|
Details
|
|
|
04-09-2020
|
0.50
|
RUDDER Cleco front spar to shear clips
|
Details
|
|
|
04-09-2020
|
2.00
|
ELEVATOR: Rivet second skin
|
Details
|
|
|
04-08-2020
|
1.50
|
RUDDER Clean tank sealant on trailing edge holes
|
Details
|
|
|
04-07-2020
|
1.00
|
ELEVATOR Scuffing for Foam Inserts
|
Details
|
|
|
04-07-2020
|
2.00
|
ELEVATOR rivet skin to spars
|
Details
|
|
|
03-30-2020
|
8.00
|
HS rivet skin to ribs and stringers and ribs
|
Details
|
|
|
03-29-2020
|
2.00
|
ELEVATOR rivet the E-1008B Halves to spar on both
|
Details
|
|
|
03-17-2020
|
3.00
|
TAILCONE disassemble the tailcone
|
Details
|
|
|
03-17-2020
|
5.00
|
HS Rivet skins to front spar web
|
Details
|
|
|
03-16-2020
|
0.50
|
HS Rivet Inspar Ribs
|
Details
|
|
|
03-15-2020
|
4.00
|
HS skin on cradles and cleco structure rivet front
|
Details
|
|
|
03-14-2020
|
1.50
|
HS Riveting Inspar Ribs
|
Details
|
|
|
03-13-2020
|
2.00
|
HS Rivet stringer and stringer web assembly
|
Details
|
|
|
03-12-2020
|
0.75
|
HS Rivet HS-912 hinge brackets
|
Details
|
|
|
03-12-2020
|
1.00
|
HS rivet HS-906 doubler to rear HS spar
|
Details
|
|
|
03-12-2020
|
2.00
|
HS Rivet HS Doubler, Front spar caps and bracket t
|
Details
|
|
|
03-12-2020
|
0.50
|
HS Bolt Hinge Bracket assembly to rear spar
|
Details
|
|
|
03-11-2020
|
0.50
|
RUDDER Rivet reinforcement plates to spar
|
Details
|
|
|
03-11-2020
|
0.50
|
RUDDER Rivet R-1010 Shear clips to stiffeners
|
Details
|
|
|
03-11-2020
|
1.00
|
RUDDER back rivet top and bottom rib
|
Details
|
|
|
03-10-2020
|
2.50
|
RUDDER back rivet R-1015 stiffeners to skins
|
Details
|
|
|
03-07-2020
|
4.00
|
ELEVATOR Tip ribs riveting and Spar Doubler riveti
|
Details
|
|
|
03-07-2020
|
4.00
|
ELEVATOR rivet reinforcement horns and root ribs
|
Details
|
|
|
03-07-2020
|
0.50
|
ELEVATOR Bend Skin Edge
|
Details
|
|
|
02-20-2020
|
14.00
|
EMPENNAGE Priming of all the VS, HS, Elevator and
|
Details
|
|
|
02-17-2020
|
8.00
|
EMPENNAGE Surface Preparation for Priming (second
|
Details
|
|
|
02-16-2020
|
9.00
|
EMPENNAGE Surface Preparation
|
Details
|
|
|
02-01-2020
|
2.00
|
ELEVATOR Countersink and dimple E-1007 spar
|
Details
|
|
|
02-01-2020
|
0.50
|
ELEVATOR check angle on Front and Rear Elevator Sp
|
Details
|
|
|
01-31-2020
|
3.00
|
ELEVATOR reassembly everything with Lucio to cross
|
Details
|
|
|
01-11-2020
|
2.50
|
ELEVATOR dimple tip ribs assembly
|
Details
|
|
|
01-11-2020
|
1.00
|
ELEVATOR dimple flanges on rood ribs
|
Details
|
|
|
01-06-2020
|
3.00
|
ELEVATOR Dimple skins
|
Details
|
|
|
01-06-2020
|
2.00
|
ELEVATOR Dimple and countersink spars
|
Details
|
|
|
01-06-2020
|
4.00
|
ELEVATOR Deburr holes and edges
|
Details
|
|
|
01-06-2020
|
1.50
|
ELEVATOR countersink trailing edge wedge
|
Details
|
|
|
01-06-2020
|
1.00
|
ELEVATOR Checking spar flange angles
|
Details
|
|
|
01-04-2020
|
3.00
|
ELEVATOR disassmbly and mark
|
Details
|
|
|
01-03-2020
|
0.50
|
ELEVATOR trim tab anchor brackets final drill
|
Details
|
|
|
01-03-2020
|
1.00
|
ELEVATOR trim cover plate nutplate drill
|
Details
|
|
|
01-03-2020
|
3.00
|
ELEVATOR Skin matchdrilling 84° trailing edge dril
|
Details
|
|
|
01-02-2020
|
0.50
|
ELEVATOR Trim access plates matchdrill
|
Details
|
|
|
01-02-2020
|
1.00
|
ELEVATOR tip rib and closing skin preassembly
|
Details
|
|
|
01-02-2020
|
5.00
|
ELEVATOR spar / root rib gusset
|
Details
|
|
|
01-02-2020
|
0.50
|
ELEVATOR skin close out tabs matchdrilling
|
Details
|
|
|
01-02-2020
|
1.75
|
ELEVATOR preassemble and matchdrill
|
Details
|
|
|
01-02-2020
|
1.00
|
ELEVATOR match drill skins (partial)
|
Details
|
|
|
01-02-2020
|
0.50
|
ELEVATOR horns preassemble and match drill
|
Details
|
|
|
01-01-2020
|
1.50
|
ELEVATOR Skin preparation and bending
|
Details
|
|
|
01-01-2020
|
2.00
|
ELEVATOR Preassemlby and matchdrill
|
Details
|
|
|
01-01-2020
|
1.25
|
ELEVATOR Front Spar preparation
|
Details
|
|
|
01-01-2020
|
1.50
|
ELEVATOR counterbalance ribs preassembly
|
Details
|
|
|
12-31-2019
|
7.00
|
ELEVATOR parts deburring and preparing
|
Details
|
|
|
12-18-2019
|
1.00
|
ELEVATOR shear clips preparation
|
Details
|
|
|
12-18-2019
|
4.00
|
ELEVATOR deburr elevator ribs shear clips skins an
|
Details
|
|
|
12-15-2019
|
4.00
|
HS countersink spars and stringers
|
Details
|
|
|
12-14-2019
|
7.00
|
HS dimple skins and flanges
|
Details
|
|
|
12-03-2019
|
2.00
|
HS mark and disassemble
|
Details
|
|
|
12-03-2019
|
4.00
|
HS final drill skin #40
|
Details
|
|
|
11-23-2019
|
3.00
|
HS Preassembly HS structure
|
Details
|
|
|
11-23-2019
|
2.00
|
HS preassembly horizontal stabilizer
|
Details
|
|
|
11-23-2019
|
2.00
|
HS final drill structure
|
Details
|
|
|
11-23-2019
|
2.00
|
HS debur skins and prepare for preassembly
|
Details
|
|
|
11-23-2019
|
0.50
|
HS bend two inspar ribs
|
Details
|
|
|
11-21-2019
|
2.00
|
HS fabricate 4 cradles
|
Details
|
|
|
11-20-2019
|
2.00
|
VS redone rivets with Lucio's Support
|
Details
|
|
|
10-27-2019
|
1.00
|
HS prepare inspar ribs
|
Details
|
|
|
10-27-2019
|
4.00
|
HS nose rib preparation
|
Details
|
|
|
10-27-2019
|
3.00
|
HS Disassemble mark and prime spars
|
Details
|
|
|
10-25-2019
|
0.50
|
HS prepare inspar ribs type A and B
|
Details
|
|
|
10-25-2019
|
1.00
|
HS Countersink front spar doubler and final drill
|
Details
|
|
|
10-24-2019
|
1.50
|
HS Front spar doubler and attachment brackets
|
Details
|
|
|
10-24-2019
|
2.00
|
HS Elevator attachment bracket fabrication
|
Details
|
|
|
10-22-2019
|
2.50
|
HS Spar caps deburring
|
Details
|
|
|
10-21-2019
|
2.00
|
HS Spar Caps final drill
|
Details
|
|
|
10-19-2019
|
2.50
|
HS Trim Front Spar Caps, long and short stringers
|
Details
|
|
|
10-19-2019
|
5.00
|
HS rear spar assembly & Prime
|
Details
|
|
|
10-19-2019
|
0.50
|
HS inboard hinge bracket
|
Details
|
|
|
10-08-2019
|
1.00
|
RUDDER Straigthened rudder trailing edge
|
Details
|
|
|
10-02-2019
|
1.00
|
VS rivetd spar flanges of bottom ribs.
|
Details
|
|
|
10-02-2019
|
1.00
|
VS rivet vertical stabilizer structure
|
Details
|
|
|
10-02-2019
|
1.00
|
VS rivet top rib and clecoed bottom rib
|
Details
|
|
|
10-02-2019
|
0.50
|
VS rivet skin to rear spar
|
Details
|
|
|
10-02-2019
|
1.00
|
VS rivet skin to middle rib and top rib
|
Details
|
|
|
10-02-2019
|
0.50
|
VS rivet skin to front spar
|
Details
|
|
|
10-02-2019
|
1.50
|
VS rivet rear spar caps to spar
|
Details
|
|
|
10-02-2019
|
1.00
|
VS rivet middle nose rib forward
|
Details
|
|
|
10-02-2019
|
1.00
|
VS cleco skin to structure
|
Details
|
|
|
09-25-2019
|
2.50
|
RUDDER rivet bottom and top ribs
|
Details
|
|
|
09-25-2019
|
2.00
|
RUDDER Leading Edge
|
Details
|
|
|
09-25-2019
|
4.00
|
RUDDER double flush rivet trailing edge
|
Details
|
|
|
09-24-2019
|
1.00
|
RUDDER rivet reinforcement and nutplates to spar
|
Details
|
|
|
09-23-2019
|
2.00
|
VS rivet top hinge brackets and front spar doubler
|
Details
|
|
|
09-23-2019
|
2.00
|
RUDDER Rivet spar to shear clips
|
Details
|
|
|
09-22-2019
|
2.50
|
VS rivet rear spar assembly
|
Details
|
|
|
09-21-2019
|
3.00
|
VS assembly rudder, blind rivet stiffener
|
Details
|
|
|
09-18-2019
|
4.00
|
VS prime VS assembly
|
Details
|
|
|
09-15-2019
|
2.00
|
RUDDER Top rib, bottom rib back riveting
|
Details
|
|
|
09-15-2019
|
1.50
|
RUDDER Rivet Spar, Doubler, Horn and Bottom Rib
|
Details
|
|
|
09-15-2019
|
2.50
|
RUDDER back rivet stiffener to skin
|
Details
|
|
|
08-14-2019
|
4.00
|
RUDDER Clean and Prime rudder parts
|
Details
|
|
|
08-11-2019
|
2.00
|
VS front spar doubler, rudder stop preparation
|
Details
|
|
|
08-10-2019
|
8.00
|
VS dimple VS skin, ribs, spars
|
Details
|
|
|
08-10-2019
|
2.00
|
RUDDER countersink trailing edge for skin
|
Details
|
|
|
08-09-2019
|
5.50
|
VS assemble, final drill dimple skins and structur
|
Details
|
|
|
08-09-2019
|
5.00
|
RUDDER skind bend, disassemble and debur
|
Details
|
|
|
08-07-2019
|
4.00
|
RUDDER assembly trailing edge
|
Details
|
|
|
07-30-2019
|
1.00
|
RUDDER final dril shear clip / Stiffenersl
|
Details
|
|
|
07-30-2019
|
1.00
|
RUDDER debur skins, remove plastic
|
Details
|
|
|
07-30-2019
|
1.00
|
RUDDER complete structur with top and bottom rib
|
Details
|
|
|
07-28-2019
|
2.50
|
RUDDER assembly stiffener and matchdrill
|
Details
|
|
|
07-28-2019
|
2.00
|
RUDDER horn bottom rib assembly
|
Details
|
|
|
07-27-2019
|
1.00
|
RUDDER Ribs assembly matchdrill deburr
|
Details
|
|
|
07-07-2019
|
4.00
|
VS prime VS parts (first attempt)
|
Details
|
|
|
06-25-2019
|
3.00
|
RUDDER R1015 stiffener fabrication
|
Details
|
|
|
06-25-2019
|
2.00
|
RUDDER rib separation, R1010 shear clip part sepa
|
Details
|
|
|
06-24-2019
|
2.00
|
VS front spar doubler, rudder stop preparation
|
Details
|
|
|
06-22-2019
|
8.00
|
VS dimple, countersink, deburr,
|
Details
|
|
|
06-20-2019
|
5.00
|
VS assemble skin, matchdrill mark parts
|
Details
|
|
|
06-02-2019
|
1.00
|
VS assemble and matchdrill
|
Details
|
|
|
06-01-2019
|
1.00
|
VS machine countersink rear spar
|
Details
|
|
|
06-01-2019
|
2.00
|
VS deburr all components and check straight
|
Details
|
|
|
05-30-2019
|
1.50
|
VS assemple rear spar and match d
|
Details
|
|
|
05-29-2019
|
3.00
|
VS nest flanges and match drill
|
Details
|
|
|
05-28-2019
|
2.00
|
VS trim flange VS1014
|
Details
|
|