KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
Work Logs Found: 16
Category Work Time: 48 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2019
4.00
Finish the final installation of the windscreen an
Details
       

 09-22-2019
4.00
Wet sanding and polishing the wheel pants and wing
Details
       

 09-20-2019
2.00
Removed the front landing gear to install the whee
Details
       

 09-17-2019
3.00
More wet sanding.
Details
       

 09-16-2019
3.00
Wet sanding.
Details
       

 09-12-2019
2.00
Jake applies paint to Cowl, wheel pant, wing tips.
Details
       

 09-11-2019
1.00
Prime Wheel pants, Wing tips, and Cowl.
Details
       

 09-10-2019
2.00
Prep the cowl, wing tips, and wheel pants for pain
Details
       

 09-09-2019
3.00
Prepping for paint.
Details
       

 09-04-2019
3.00
Sanding and prep of the cowl, wing tips and wheel
Details
     

 08-30-2019
3.00
Fiberglass the cooling air exit vents into the bot
Details
       

 08-29-2019
3.00
Fit the cowling vents. Sand and prep cowling wing
Details
       

 08-23-2019
3.00
Cut cooling air vent opening in the bottom cowl.
     

 08-22-2019
2.50
Split cowl with a horizontal cut.
Details
       

 08-22-2019
1.50
Build the cooling air vents for cowling.
Details
     

 08-19-2019
8.00
Cowling fuel door and latch.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.