Powered By Kitlog Pro v2.0
Daves Sonex Web Site
Sonex Aerovee Tri-gear
Cowling
Work Logs Found:
16
Category Work Time:
48 Hours
Date
Hours
Work Log Summary
Details
09-23-2019
4.00
Finish the final installation of the windscreen an
Details
09-22-2019
4.00
Wet sanding and polishing the wheel pants and wing
Details
09-20-2019
2.00
Removed the front landing gear to install the whee
Details
09-17-2019
3.00
More wet sanding.
Details
09-16-2019
3.00
Wet sanding.
Details
09-12-2019
2.00
Jake applies paint to Cowl, wheel pant, wing tips.
Details
09-11-2019
1.00
Prime Wheel pants, Wing tips, and Cowl.
Details
09-10-2019
2.00
Prep the cowl, wing tips, and wheel pants for pain
Details
09-09-2019
3.00
Prepping for paint.
Details
09-04-2019
3.00
Sanding and prep of the cowl, wing tips and wheel
Details
08-30-2019
3.00
Fiberglass the cooling air exit vents into the bot
Details
08-29-2019
3.00
Fit the cowling vents. Sand and prep cowling wing
Details
08-23-2019
3.00
Cut cooling air vent opening in the bottom cowl.
08-22-2019
2.50
Split cowl with a horizontal cut.
Details
08-22-2019
1.50
Build the cooling air vents for cowling.
Details
08-19-2019
8.00
Cowling fuel door and latch.
Details
SITE NAVIGATION
Contact Builder
Sonex Aerovee Tri-gear Home
Category
# Logs
# Hours
All
548
1483
Aft Fuselage
47
103
Aileron
17
42
Controls
9
30
Cowling
16
48
Cowling, wing tips,
16
48
Engine
36
102
Final Assembly
19
53
Flaps
10
28
Fuel System
16
33
Fwd Fuselage
89
252
Horiz Stab and Eleva
19
63
Landing Gear
26
80
Lights
11
26
Misc Hardware
3
Miscellaneous
3
None
14
16
Panel, Avionics, Wir
29
83
Polish
4
20
Turtledeck
10
29
Vert Stab and Rudder
18
52
Windscreen and Canop
12
46
Windscreen, Canopy,
12
46
Wings
112
283
Copyright © 2001-2024 Matronics. All Rights Reserved.