Date
|
Hours
|
Work Log Summary
|
Details
|
12-30-2023
|
3.00
|
Right Wing Locker cut out
|
Details
|
|
|
11-27-2023
|
4.00
|
Fuel Sender cover
|
Details
|
|
|
08-20-2023
|
1.00
|
Pitot Heater Controller Mounting
|
Details
|
|
|
08-13-2023
|
4.00
|
Pitot mount work
|
Details
|
|
|
07-17-2023
|
1.00
|
Pitot nut plate drilling
|
Details
|
|
|
07-04-2023
|
6.00
|
Pitot reinforment box work
|
Details
|
|
|
07-02-2023
|
3.00
|
Pitot inspection panel
|
Details
|
|
|
06-27-2023
|
2.00
|
Rt Wing fuel line pressure check
|
Details
|
|
|
06-26-2023
|
3.00
|
t wing fuel lines installed
|
Details
|
|
|
05-29-2023
|
4.00
|
Rt Wing fuel lines
|
Details
|
|
|
03-26-2023
|
4.00
|
Rt wing bellcrank support and lower wing skin stif
|
Details
|
|
|
02-11-2023
|
3.00
|
Replaced front rib #3 on Rt Wing
|
Details
|
|
|
01-31-2023
|
1.50
|
Drilled holes for rt wing fuel lines in leading ed
|
Details
|
|
|
01-28-2023
|
3.00
|
Rt Wing Fuel Sender hole cut
|
Details
|
|
|
01-28-2023
|
1.50
|
Rt Wing Fuel Filler Cleanup
|
Details
|
|
|
01-25-2023
|
2.00
|
Rt Wing Fuel Filler neck hole cut
|
Details
|
|
|
01-22-2023
|
2.00
|
Rt Wing Fuel Sender jig
|
Details
|
|
|
01-02-2023
|
2.00
|
Build wire bundle for RT wing landing/taxi/nav lig
|
Details
|
|
|
12-30-2022
|
5.00
|
Debur right wing top and Cortec. Make fuel fill sp
|
Details
|
|
|
12-23-2022
|
6.00
|
Drilled Landing Light mount and leading edge skin
|
Details
|
|
|
11-28-2022
|
1.50
|
Releveling and drawing Landing Light channel flang
|
Details
|
|
|
11-24-2022
|
5.00
|
Rt wing tank ProSeal and Landing Light mount nut p
|
Details
|
|
|
11-22-2022
|
3.00
|
Rt wing fuel tank cut fuel drain and cork fuel tan
|
Details
|
|
|
11-19-2022
|
2.00
|
Rt Wing Fuel Tank Sender cutout
|
Details
|
|
|
11-17-2022
|
1.00
|
Rt Wing Landing Light hole Finish and Fuel Tank Pl
|
Details
|
|
|
11-16-2022
|
2.00
|
Rt wing landing light hole cut continued
|
Details
|
|
|
11-15-2022
|
2.50
|
Rt Wing Leading Edge drilling final and Landing Li
|
Details
|
|
|
11-01-2022
|
2.00
|
Started drilling rt wing top of leading edge to no
|
Details
|
|
|
10-31-2022
|
2.50
|
rt wing leading edge cleco'd and starting to align
|
Details
|
|
|
10-30-2022
|
2.00
|
Flipped rt wing upsideright and began working on l
|
Details
|
|
|
10-29-2022
|
4.00
|
Complete lower rt wing skin
|
Details
|
|
|
10-28-2022
|
1.50
|
Rt wing lower skin, ribs, and spar scotchbrite and
|
Details
|
|
|
10-25-2022
|
1.50
|
Continue to debur lower inside skin (finished)
|
Details
|
|
|
10-24-2022
|
2.00
|
Debur rt wing inside skin
|
|
|
|
10-22-2022
|
2.00
|
Debur debur debur the lower wing ribs, front spar
|
Details
|
|
|
10-12-2022
|
2.00
|
rt wing ower deskin and debur
|
Details
|
|
|
10-11-2022
|
3.50
|
Final drilled rt wing lower leading edge and final
|
Details
|
|
|
10-10-2022
|
2.00
|
Rt Wing Lower Spar finish drilling and begin lower
|
Details
|
|
|
10-09-2022
|
4.00
|
Rt Wing Lower Skin final drill and start leading e
|
Details
|
|
|
10-09-2022
|
4.00
|
rt wing bottom skin align and drill
|
Details
|
|
|
10-07-2022
|
1.00
|
Drilled and cortec'd wing locker rear upper suppor
|
Details
|
|
|
10-05-2022
|
0.50
|
Lay rt wing back on it's top to prepare for bottom
|
Details
|
|
|
10-04-2022
|
1.50
|
rt wing bellcrank and top skin support L channel r
|
Details
|
|
|
10-03-2022
|
2.00
|
Rt Wing top skin support debur and cortec
|
Details
|
|
|
10-01-2022
|
2.00
|
rt wing skin and bellcrank support final drilled
|
Details
|
|
|
09-29-2022
|
2.00
|
Fabricated Rt wing top skin L channels
|
Details
|
|
|
09-27-2022
|
2.00
|
Rt Wing first flip to start on the bottom
|
Details
|
|
|
09-25-2022
|
1.00
|
Finished drilling Rt Wing top skin final hole size
|
Details
|
|
|
09-23-2022
|
2.00
|
Rt Wing fabricate wing walk re-enforce sheet
|
Details
|
|
|
09-21-2022
|
2.00
|
rt wing top skin final drill 1/2 done
|
Details
|
|
|
09-20-2022
|
2.00
|
Right Wing top skin drill
|
Details
|
|
|
09-18-2022
|
0.50
|
Drilled initial top skin rear spar holes, RT wing.
|
Details
|
|
|
09-04-2022
|
2.00
|
Right Wing final rivet rear ribs (main and rear sp
|
Details
|
|
|
09-03-2022
|
1.50
|
Rt Wing rear spar hand rivet all but ribs
|
Details
|
|
|
08-28-2022
|
0.50
|
Drill wing locker lightening holes covers
|
Details
|
|
|
08-24-2022
|
2.00
|
Cut out wing locker lightening holes covers
|
Details
|
|
|
08-22-2022
|
1.50
|
Rt wing riveting wing locker braces
|
Details
|
|
|
08-22-2022
|
2.00
|
Rt Wing locker tiedowns
|
Details
|
|
|
08-21-2022
|
3.00
|
RT wing locker prep
|
Details
|
|
|
08-20-2022
|
9.00
|
Right Wing scotchbrite and cortec
|
Details
|
|
|
08-19-2022
|
5.00
|
Right Wing Leading edge ribs
|
Details
|
|
|
08-17-2022
|
2.00
|
Right Wing Leading edge ribs
|
Details
|
|
|
08-15-2022
|
2.00
|
Right Wing Leading edge ribs
|
Details
|
|
|
07-16-2022
|
3.00
|
Nearly finished nose rib angles drills
|
Details
|
|
|
07-10-2022
|
2.50
|
Rib #7 Right Wing and spare tip
|
Details
|
|
|
07-04-2022
|
5.00
|
Start Right Wing
|
Details
|
|
|
07-02-2022
|
3.00
|
Wing move to hanger
|
Details
|
|
|
06-29-2022
|
3.00
|
Packing up the wing part 2
|
Details
|
|
|
06-28-2022
|
2.00
|
Packing up the wing
|
Details
|
|
|
03-04-2022
|
4.00
|
Shop cleanup and debur aileron holes
|
Details
|
|
|
02-22-2022
|
2.00
|
Beginning torque marker
|
Details
|
|
|
02-20-2022
|
2.00
|
Left Wing support ribs bottom of wing skin
|
Details
|
|
|
02-15-2022
|
1.50
|
Left Wing Aileron Stop
|
Details
|
|
|
02-14-2022
|
0.50
|
Wingtip consulation with Zenith
|
Details
|
|
|
02-13-2022
|
3.00
|
Wingtip and aileron counterweight strike plates wo
|
Details
|
|
|
02-05-2022
|
3.50
|
Left Aileron placed and drilled
|
Details
|
|
|
01-22-2022
|
1.00
|
L channel down on bottom wing skin
|
Details
|
|
|
01-20-2022
|
2.00
|
Left Wing root nose ribs and repressure test fuel
|
Details
|
|
|
01-19-2022
|
1.50
|
Rivet Nose Rib #3 (tank rib)
|
Details
|
|
|
01-18-2022
|
3.00
|
Squeeze rivets, locker door rivet, and heat shrink
|
Details
|
|
|
12-30-2021
|
4.00
|
Reevaluate and asses what's next
|
Details
|
|
|
12-08-2021
|
2.00
|
Left Wing Nav Light drill route and test
|
Details
|
|
|
12-04-2021
|
1.50
|
Left Wing nav light wire bundle wax-string
|
Details
|
|
|
04-03-2021
|
4.00
|
Fuel Sender access panel - Left Wing
|
Details
|
|
|
02-02-2021
|
2.50
|
Leading edge ribs cleanup start.
|
Details
|
|
|
01-30-2021
|
3.00
|
Flaps and Ailerons revival
|
Details
|
|
|
01-24-2021
|
1.00
|
Replaced nose rib
|
Details
|
|
|
01-17-2021
|
4.00
|
Left Wing Landing Light Lens trimmed and drilled
|
Details
|
|
|
01-16-2021
|
6.00
|
Finished Landing Light mount drilling
|
Details
|
|
|
01-15-2021
|
2.00
|
Landing Lights mount plate work
|
Details
|
|
|
01-04-2021
|
2.00
|
Light kit mount build
|
Details
|
|
|
01-03-2021
|
3.00
|
Landing Lights hole cut
|
Details
|
|
|
01-01-2021
|
3.00
|
Fuel_tank_leading_edge_cuts
|
Details
|
|
|
12-30-2020
|
2.00
|
Fuel cap skin cut work - left wing
|
Details
|
|
|
12-29-2020
|
1.00
|
Fuel quick drain leading edge skin drill
|
Details
|
|
|
12-28-2020
|
3.00
|
Last nose-rib skin drilling
|
Details
|
|
|
12-24-2020
|
6.00
|
Access Panels
|
Details
|
|
|
12-22-2020
|
2.00
|
Bottom Skin bell crank supports and Fuel Senders a
|
Details
|
|
|
12-21-2020
|
2.00
|
walking skins and bad nuts
|
Details
|
|
|
12-19-2020
|
8.00
|
Drilled and cleco'd upper leading edge left wing
|
Details
|
|
|
12-18-2020
|
1.00
|
Added leading edge back on left wing
|
Details
|
|
|
12-17-2020
|
4.00
|
Final drill nose-skin-to-spar and debur
|
Details
|
|
|
12-13-2020
|
2.00
|
Leading edge Left wing and fuel system research.
|
Details
|
|
|
12-10-2020
|
3.00
|
Riveted rear spar and Bottom Left Wing skin
|
|
|
|
12-06-2020
|
3.00
|
Rear spar debur and prime, also rear rib backplate
|
Details
|
|
|
11-30-2020
|
8.00
|
Final drill and debur left wing skin and rear ribs
|
Details
|
|
|
11-29-2020
|
2.00
|
Left wing main spar rivet
|
Details
|
|
|
11-18-2020
|
2.00
|
Remove Left Wing spar doubler for drilling
|
Details
|
|
|
11-15-2020
|
2.00
|
Rear Wing Rib spacing issue
|
Details
|
|
|
11-11-2020
|
3.00
|
Cut and drilled in left wing rib supports top skin
|
|
|
|
11-07-2020
|
2.00
|
Bell Crank support channel
|
Details
|
|
|
11-04-2020
|
2.00
|
Bell Crank question
|
Details
|
|
|
11-03-2020
|
2.00
|
Flipping the left wing to work on the bottom
|
Details
|
|
|
11-02-2020
|
2.00
|
Top Skin and rear rib drilling
|
Details
|
|
|
11-01-2020
|
0.50
|
Continued drilling top skin...drilled myself
|
Details
|
|
|
10-31-2020
|
3.00
|
Started Drilling Rear Spar and Top Skin
|
Details
|
|
|
10-19-2020
|
2.00
|
Top Wing Skin questions
|
Details
|
|
|
10-16-2020
|
1.00
|
First wing skin layed on
|
Details
|
|
|
10-11-2020
|
1.00
|
Drilled Nose Rib Fuel hole
|
Details
|
|
|
09-27-2020
|
2.00
|
Left Wing nose rib
|
Details
|
|
|
09-09-2020
|
2.00
|
Bellcrank and Landing Lights purchase decision
|
Details
|
|
|
09-06-2020
|
2.00
|
Rear Wing Rib spacing issue
|
Details
|
|
|
08-26-2020
|
2.00
|
Questions for Roger about nose ribs
|
Details
|
|
|
08-24-2020
|
5.00
|
Attaching Rear Ribs on left wing main spar
|
Details
|
|
|
08-23-2020
|
2.00
|
Started attaching Rear ribs to Left Wing main spar
|
Details
|
|
|
08-19-2020
|
1.00
|
Cortec Rear Ribs
|
Details
|
|
|
08-17-2020
|
2.00
|
Debur and prep for Cortec
|
Details
|
|
|
08-07-2020
|
2.00
|
Drilled and cleco'd rest of rear rib L supports
|
Details
|
|
|
07-31-2020
|
2.00
|
Rear Rib L angle drilling ribs 1 through 4
|
Details
|
|
|
07-30-2020
|
3.00
|
Rear Ribs
|
Details
|
|
|
07-29-2020
|
2.00
|
Joined Rear Channel pieces
|
Details
|
|
|
07-21-2020
|
2.00
|
Aileron closing - both
|
Details
|
|
|
07-20-2020
|
2.00
|
Closing up 1st (Right) aileron
|
Details
|
|
|
06-24-2020
|
3.00
|
Rebuilt outer mass balancer rib.
|
Details
|
|
|
06-21-2020
|
0.50
|
Assemble ailerons after cortec
|
Details
|
|
|
06-19-2020
|
3.00
|
Cortec Ailerons
|
Details
|
|
|
06-18-2020
|
3.00
|
Final drilled rest of aileron (trim hing) and rib
|
|
|
|
06-10-2020
|
3.00
|
Aileron trim actuator inspection hole
|
Details
|
|
|
06-09-2020
|
1.00
|
Aileron trim actuator L-Channel prep
|
Details
|
|
|
05-31-2020
|
6.00
|
Aileron trim hinge and actuator rod hole.
|
Details
|
|
|
05-30-2020
|
3.00
|
Aileron rib blank and rib form
|
Details
|
|
|
05-25-2020
|
4.00
|
channel-to-rib brace
|
Details
|
|
|
05-22-2020
|
6.00
|
Cut out left aileron trim
|
Details
|
|
|
05-19-2020
|
2.50
|
Left Aileron Mass Balancer
|
Details
|
|
|
05-17-2020
|
3.00
|
Drilled Left Aileron
|
Details
|
|
|
05-16-2020
|
4.00
|
Disassembled and Deburred Right Aileron
|
Details
|
|
|
05-11-2020
|
2.00
|
Mass Balancer drilled arm and cut hole
|
Details
|
|
|
04-22-2020
|
3.00
|
Mass Balancer ribs on the Right Side Aileron
|
Details
|
|
|
04-15-2020
|
4.00
|
Right side Aileron
|
Details
|
|
|
04-11-2020
|
10.00
|
Right Flap: debur, cortec, reassemble, rivet, hing
|
Details
|
|
|
03-27-2020
|
1.00
|
Drill hinge - right flap
|
Details
|
|
|
03-21-2020
|
8.00
|
Right Flap align and drill ribs, skin, and control
|
Details
|
|
|
03-15-2020
|
5.00
|
Riveting and closing up Left Flap.
|
Details
|
|
|
03-12-2020
|
1.00
|
Finish Cortec left flap and place ribs
|
Details
|
|
|
03-08-2020
|
4.00
|
Deburred/Cortec Left Flap
|
Details
|
|
|
02-23-2020
|
2.00
|
Flap Control plate and rib
|
Details
|
|
|
02-08-2020
|
4.00
|
Aligning, drilling, and clecoing left flap ribs
|
Details
|
|
|
02-07-2020
|
2.00
|
Control Plate
|
Details
|
|
|
09-03-2019
|
1.00
|
Missing inventory part 2
|
Details
|
|
|
09-01-2019
|
1.00
|
Finished inventory
|
Details
|
|
|
08-31-2019
|
3.00
|
Started Inventory of Wing crate
|
Details
|
|
|
08-02-2019
|
8.00
|
Picked up Wing kit with Kevin and James
|
Details
|
|