Work Logs Found:
106
Category Work Time:
380 Hours
Date
Hours
Work Log Summary
Details
12-18-2021
5.00
remade right front strut.
Details
06-27-2021
2.00
DRY FIT ELEVATOR AND RUDDER
Details
06-20-2021
4.00
INSTALLED HORZONTAL AND REPLACED CONTROL BRACE
Details
02-21-2021
4.00
INSTALLED SEAT BELTS
02-02-2020
16.00
Trailer Storage, wheels on
Details
12-30-2019
4.00
Pasenger Seat
Details
12-29-2019
4.00
Pasenger side seat floor striker plate and seatbel
Details
12-28-2019
4.00
Seat stuff
Details
12-27-2019
2.00
Added 3 of the 4 Door frame striker plates
Details
12-24-2019
3.00
Installed Rudder mounts
Details
12-23-2019
2.00
Left 75F17-6 and 75F12-6
Details
12-21-2019
4.00
Right door frame andwunroof frame
Details
12-21-2019
2.00
Installed A6 rivets in Fusulage
Details
12-21-2019
1.00
Atached 75N1-4
Details
12-15-2019
5.00
INSTALLED 75F2-5 75F2-6 BOTH SIDES
Details
12-14-2019
2.00
Riveting back half of Fuselage
Details
12-12-2019
2.00
Riveted top skin on
Details
12-08-2019
3.00
Installed top skin and ran antenna cable
Details
11-17-2019
4.00
Torqued motor mount and polished
Details
11-16-2019
6.00
Glare shield instalation
Details
11-15-2019
2.00
installed internal motor mounts
Details
11-14-2019
2.00
Installed gusets 75F10-6
Details
11-11-2019
2.00
Final install of firewall
Details
11-03-2019
3.00
Details
11-02-2019
5.50
Left D0or seal
Details
10-27-2019
4.00
Bubbel Cabin Doubler Door Seal
Details
10-26-2019
4.00
Mods for New Bubble Door
Details
10-22-2019
1.25
Right Side control cover and Fule line
Details
10-19-2019
4.00
Seat Floor and Sliding Seat
10-19-2019
1.00
riveting flaparon control cover
Details
10-13-2019
4.00
Fuel Pumps and Flap motor wireing
Details
10-13-2019
0.25
Added 4 rivets to rear L brace
Details
10-10-2019
1.00
More Parts
Details
10-06-2019
2.50
installed L braces on left Seat frame,
Details
10-06-2019
2.50
Front lower Landing gear mount
Details
09-29-2019
4.00
Final assembly of center torque tube and set mout
Details
09-15-2019
2.00
Sliding seat option
Details
09-08-2019
6.50
Left Landing Gear mount
Details
09-07-2019
3.00
Right Landing Gear and Seat Frame
Details
09-04-2019
1.00
Viking parts arived
Details
09-01-2019
6.00
Right landing gear mount
Details
08-31-2019
2.00
Fusulage Gusset
Details
08-24-2019
3.00
Riveted Rear Baggage Floor
Details
12-03-2015
3.00
rudder pedal and brake assembly.
Details
11-30-2015
1.00
Started installing rudder pedals
Details
11-28-2015
4.00
Re-attached forward & aft fuselages.
Details
11-28-2015
4.00
Modified seat side supports for better fit. Rivet
Details
11-27-2015
4.00
re-assembly of FF
Details
11-26-2015
5.00
forward fuselage
Details
11-25-2015
2.00
Cortec to FF parts
Details
11-24-2015
2.00
Deburred & scuffed FF parts.
Details
11-23-2015
2.00
Scuffed & applied Cortec to FF parts
Details
11-22-2015
3.00
Scuffed & applied Cortec to some parts
Details
11-21-2015
2.00
Deburred & scuffed components of the forward fusel
Details
11-19-2015
3.00
Deburred & scuffed components of the forward fusel
Details
11-16-2015
2.00
Misc work on aft fuselage
Details
10-29-2015
4.00
Fitted & drilled 75F6-6
Details
10-21-2015
3.00
Disassembled forward fuselage,
Details
10-20-2015
4.00
right seat base& supports.
Details
10-19-2015
6.00
left seat base
Details
10-18-2015
6.00
Fitted supports & left seat base
Details
10-17-2015
1.00
Finished doublers. Started L angles
Details
10-16-2015
1.00
Continued with doublers
Details
10-15-2015
1.00
Started fitting & drilling gear channel doublers
Details
10-12-2015
1.00
gear strut fittings
Details
10-11-2015
3.00
Finished fitting & pilot drilling center console.
Details
10-07-2015
3.00
L angles on forward top skin
Details
10-06-2015
4.00
Fitted upper and lower engine mounts.
Details
10-05-2015
2.00
Forward side angles.
Details
10-03-2015
3.00
Fitted firewall & forward side skins & forward fus
Details
10-02-2015
6.00
Fitted & drilled cabin frame gussets.
Details
10-01-2015
2.00
Riveted firewall & bungee pin
Details
09-30-2015
2.00
Finished scuffing. Clecoed and applied Cortec
Details
09-28-2015
5.00
Finished firewall assembly
Details
09-27-2015
7.00
Temp installed brake cylinders.
Details
09-26-2015
3.00
Fitted and drilled brake pedal hinges and brake pe
Details
08-31-2015
3.00
rudder pedal
Details
08-23-2015
3.00
Trimmed left lower longeron
Details
08-12-2015
2.00
Drilled and clecoed 75F11-3, 75F12-2 and 75F10-5
Details
08-10-2015
6.00
forward fuselage
Details
08-09-2015
5.00
Clecoed baggage area components back in place
Details
08-06-2015
1.00
flaperon torque tubes
Details
08-05-2015
3.00
flaperon controls
Details
08-03-2015
3.00
started installing flaperon controls.
Details
08-02-2015
3.00
Applied Cortec to the parts.
Details
07-29-2015
1.00
Scuffed parts of the baggage area components
Details
07-28-2015
3.00
baggage area panels
Details
07-27-2015
3.00
Riveted componenets of baggag back
Details
07-26-2015
3.00
deburred and scuffed baggaged back
Details
07-25-2015
3.00
Riveted top skin to stiffeners and longerons.
Details
07-24-2015
3.00
top longerons and top stiffeners
Details
07-23-2015
4.00
baggage floors
Details
07-18-2015
5.00
Cut L angles for baggage floor suppor
Details
07-17-2015
4.00
L angles to baggage floor.
Details
07-16-2015
7.00
Folded top skin back for baggage area access
Details
07-15-2015
8.00
Riveted both HT frames to fuselage bottom
Details
07-14-2015
11.00
HT brackets
Details
07-13-2015
4.00
rear fuselage skins and stiffeners
Details
07-12-2015
6.00
Drilled lateral and diaonal stiffener holes
Details
07-11-2015
4.00
Attached aft left side skinto left side skin
Details
07-07-2015
5.00
Riveted stiffeners to right side
Details
07-06-2015
6.00
Right rear fuselage skin
Details
07-05-2015
7.00
Removed bottom right longeron to use with fuselage
Details
07-04-2015
5.00
final size in bottom fuselage skin
Details
07-03-2015
7.00
longerons to bottom fueslage skin
Details
08-12-2012
2.00
75F11-3, 75F12-2 and 75F10-5
Details
SITE NAVIGATION
Contact Builder
CH 750 STOL Home
Category
# Logs
# Hours
All
311
1176
Avionics
13
55
Bought Kit
1
3
Controls
14
60
COWL
6
35
DOORS
5
18
Elevator
14
47
Empennage
1
1
Engine
14
44
FLAPERONS
9
34
Fuselage
106
380
Header tank and fuel
11
34
HORAZONTAL
6
26
INSTRUMENTS
4
10
Inventory
2
5
Kit unloaded at home
1
4
Landing Gear
9
32
Miscellaneous
23
80
None
1
1
PAINT
8
50
Prop
1
2
Rudder
3
12
Seats
1
2
Slats
7
21
WINDOWS
3
15
Wings
44
172
Wiring
4
33
Copyright © 2001-2024 Matronics. All Rights Reserved.