Powered By Kitlog Pro v2.0
Kenneths Web Site
RV9A
Fuel tank right
Work Logs Found:
13
Category Work Time:
40 Hours
Date
Hours
Work Log Summary
Details
10-03-2004
5.00
Mounting the rear baffel.
Details
07-31-2004
4.00
Riviting & sealing the ribs.
07-30-2004
3.00
Riviting & sealing the ribs.
08-09-2003
4.00
Getting tank ready for riviting.
05-22-2002
3.00
Sealing the filler cap, and drain valve.
Details
04-14-2002
1.50
Sealing the end rib of the fuel tank.
Details
03-18-2002
1.50
Scuffing the fuel tank for pro seal.
03-16-2002
1.50
Debured and dimpled fuel tank parts.
03-13-2002
1.00
Working on the cover for the fuel tank.
Details
03-12-2002
3.00
Working on the right fuel tank.
Details
03-11-2002
4.00
Working on the right fuel tank.
Details
03-10-2002
4.50
Made the angle bracket and nose stiffner
Details
02-28-2002
4.00
Right fuel tank.Checked wing twist.
Details
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
470
1537
Aileron left
4
16
Aileron right
5
15
Ailerons both
1
4
Avionics
2
3
Baffeling
15
72
Canopy
1
2
Canopy
8
16
Cowling
7
22
Electrial
1
1
Empennage
2
8
Engine
14
42
Engine 0-320
14
42
Exhaust
1
2
Flaps left
4
27
Flaps right
7
34
Fuel Line
1
2
Fuel tank left
8
24
Fuel tank right
13
40
Fuel Tanks
9
18
Fuselage
160
504
Inspection
1
2
Instrument panel
22
68
Instrument panel
7
22
Interior
3
18
Jigs
4
10
Leading edge light.
4
7
Lighting.
1
0
Oil Cooler
2
7
Pitot tube
3
7
Prop
1
3
Rear spar both
1
5
Rear spar left
1
4
Rear spar right
3
10
Rudder
2
4
Shop Cleaning
5
35
Spinner
2
9
Tools
3
6
Vertical stabelizer
6
18
Wign spar left
1
2
Windshield
18
54
Wing left
29
83
Wing ribs
2
7
Wing right
21
82
Wing spar right
1
2
Wings
4
8
Wingtip both
15
72
Wingtip left
1
2
Wingtip right
4
10
Wireing
13
43
Wiring
13
43
Copyright © 2001-2024 Matronics. All Rights Reserved.