Powered By Kitlog Pro v2.0
Brians Web Site
RV-14a
Fuselage
Work Logs Found:
91
Category Work Time:
400 Hours
Date
Hours
Work Log Summary
Details
11-13-2020
3.00
Moving day!
Details
11-08-2020
4.00
Put on fiberglass parts
Details
11-07-2020
4.00
SB-00027
Details
10-25-2020
5.00
Rear window.
Details
10-24-2020
6.00
Updated G3x software, put on cowl to check fit.
Details
10-23-2020
5.00
Put on canopy
Details
10-23-2020
4.00
Continued work on cowl.
Details
10-21-2020
4.00
Seat belts
Details
10-15-2020
3.00
Cowl work
Details
09-26-2020
2.00
Sanding wheel pants.
Details
09-25-2020
5.00
Added flox to wheel pants at junction fairings.
Details
09-21-2020
2.00
Sanded lower cowl to match baffles.
Details
09-20-2020
6.00
Started on junction fairings for the main gear.
Details
09-19-2020
6.00
Finished main gear fairings
Details
09-12-2020
6.00
Main gear fairing
Details
09-11-2020
4.00
Nose gear fairing
Details
09-05-2020
6.00
Nose gear pants
Details
09-02-2020
4.00
Nose gear pants
Details
08-30-2020
5.00
Started nosewheel pants
Details
08-29-2020
6.00
Fitting main gear wheel pants.
Details
08-24-2020
2.00
Marked lower cowl
Details
08-02-2020
5.00
More cowling
Details
08-01-2020
5.00
Riveted cowl hinges
Details
07-26-2020
6.00
Lower cowl
Details
07-25-2020
8.00
Upper cowl
Details
07-22-2020
5.00
Cowling continued
Details
07-19-2020
3.00
Start Cowl
Details
06-20-2020
8.00
Side panels
Details
06-11-2020
4.00
Axle shims
Details
06-07-2020
6.00
Interior and more electrical problems
Details
06-06-2020
5.00
Interior
Details
05-23-2020
8.00
Yaw damper, electrical problems
Details
05-22-2020
6.00
On the gear
Details
05-21-2020
2.50
Right main landing gear
Details
05-05-2020
3.00
Miscellaneous finishing kit
Details
05-03-2020
4.00
Engine mount
Details
05-02-2020
5.00
Canopy finished
Details
05-01-2020
2.00
Canopy fairing 9
Details
04-30-2020
2.00
Canopy fairing 8
Details
04-29-2020
3.00
Canopy fairing 7
Details
04-27-2020
2.00
Canopy fairing 6
Details
04-26-2020
2.00
Canopy fairing 5
Details
04-25-2020
3.00
Landing gear start.
Details
04-25-2020
2.00
Canopy fairing 4
Details
04-24-2020
3.00
Canopy fairing 3
Details
04-22-2020
1.00
Canopy fairing 2
Details
04-21-2020
4.00
Canopy fairing
Details
04-19-2020
4.00
Filler layer at bottom of canopy.
Details
04-18-2020
5.00
Rivet canopy side skins
Details
04-15-2020
2.00
Paint glareshield
Details
04-13-2020
2.00
Canopy countersinks
Details
04-11-2020
5.00
Canopy drilled
Details
04-11-2020
4.00
Began canopy attach process
Details
04-10-2020
4.00
Canopy frame painted.
Details
04-09-2020
1.00
Canopy frame fits!
Details
04-08-2020
12.00
Canopy frame completed
Details
04-07-2020
10.00
Canopy continued...
Details
04-06-2020
5.00
Started the canopy
Details
04-04-2020
6.00
Drilled the canopy
Details
03-28-2020
7.00
Rear window
Details
03-14-2020
2.00
Glued in the vents and static ports.
Details
03-13-2020
5.00
Assembled the canopy latch.
Details
03-11-2020
3.00
Assembled the air vents.
Details
03-07-2020
3.00
Painted cockpit access covers.
Details
02-29-2020
6.00
Canopy rear frame assembly
Details
02-28-2020
6.00
Got canopy parts ready for assembly
Details
01-18-2020
6.00
Rudder pedals
Details
01-17-2020
3.00
Rudder pedals
Details
12-14-2019
4.00
Pitot and AOA lines
Details
12-07-2019
7.00
More wiring
Details
12-01-2019
7.00
Fuselage wiring harness
Details
11-29-2019
8.00
Control sticks.
Details
11-24-2019
3.00
Flap motor
Details
11-23-2019
2.00
Second coat of paint for the interior
Details
11-23-2019
8.00
Riveted in the roll over assembly
Details
11-23-2019
2.00
Painted roll over assembly
Details
11-20-2019
6.00
Completed roll-over assembly
Details
11-16-2019
4.00
Painted the interior
Details
11-02-2019
5.00
Baggage floors
Details
11-01-2019
2.00
Flap bearing blocks
Details
10-30-2019
2.00
Fuel lines
Details
10-27-2019
3.50
Finished fusealge join.
Details
10-26-2019
4.25
Rivet fuselage joint
Details
10-25-2019
1.50
Fuselage join!
Details
08-30-2019
0.00
Control sticks
Details
08-25-2019
5.00
Prepared fuselage floors
Details
08-24-2019
8.00
Fuel system, Baggage bulkhead
Details
08-23-2019
4.00
Modifying QB fuse for tricyle gear
Details
08-21-2019
2.00
Various cuts and drills.
Details
08-19-2019
8.00
Checking quick build fuselage.
Details
08-13-2019
3.00
Elevator pushrods
Details
SITE NAVIGATION
Contact Builder
RV-14a Home
Category
# Logs
# Hours
All
250
1071
Avionics
22
92
Elevator
11
44
Empennage
17
62
Engine
22
110
Fuselage
91
400
Horiz. Stab
8
35
Miscellaneous
14
45
Paint
2
2
Prop
5
22
Rudder
5
19
Shop Supplies
1
4
Tailcone
11
58
Vertical Stab.
7
27
Wings
34
151
Copyright © 2001-2024 Matronics. All Rights Reserved.