Powered By Kitlog Pro v2.0
Brians Web Site
RV-14a
Wings
Work Logs Found:
34
Category Work Time:
151 Hours
Date
Hours
Work Log Summary
Details
01-03-2021
2.50
Reattach fuel tank
Details
01-02-2021
2.00
Fixed fuel tank leak.
Details
01-01-2021
2.00
Pulled left tank
Details
12-27-2020
2.00
Fuel leak
Details
12-26-2020
3.00
Wing root fairings
Details
12-24-2020
1.50
Wing root fairings
Details
12-16-2020
1.00
Fuel lines
Details
12-15-2020
1.00
Installed engraved gas caps.
Details
12-13-2020
2.00
Aileron adjust
Details
12-11-2020
2.00
Flaps
Details
11-28-2020
4.00
Wing Attach
Details
11-27-2020
4.00
Prepare for wing attach.
Details
11-14-2020
4.00
Moved wings to hangar.
Details
03-15-2020
4.00
Wing tip fairings
Details
12-28-2019
6.00
Wingtips
Details
12-24-2019
8.00
Wingtips
Details
12-23-2019
3.00
Alignment of wing tips and aileron.
Details
12-22-2019
4.00
Wing tips
Details
12-21-2019
9.00
Installed the aileron trim motor and springs.
Details
10-25-2019
10.00
RIght wing skin
Details
10-25-2019
2.00
Aileron torque tubes
Details
10-20-2019
10.00
Left wing skin
Details
10-18-2019
3.00
Leak Test
Details
10-18-2019
6.00
Landing lights
Details
10-13-2019
6.00
Fuel senders and landing lights
Details
10-12-2019
5.00
Mounted Pitot AOA
Details
10-05-2019
5.00
Drill J-channel and cut out for pitot mast.
Details
09-29-2019
6.00
Removed fuel tanks
Details
09-28-2019
8.00
Continued installing systems
Details
09-27-2019
5.00
Started wing systems
Details
08-17-2019
3.00
Aileron belcrank fabrication
Details
08-04-2019
6.00
Flap/aileron gap seals
Details
08-03-2019
3.00
Various wing parts
Details
07-28-2019
8.00
Received and inventoried the quickbuild wing and f
Details
SITE NAVIGATION
Contact Builder
RV-14a Home
Category
# Logs
# Hours
All
250
1071
Avionics
22
92
Elevator
11
44
Empennage
17
62
Engine
22
110
Fuselage
91
400
Horiz. Stab
8
35
Miscellaneous
14
45
Paint
2
2
Prop
5
22
Rudder
5
19
Shop Supplies
1
4
Tailcone
11
58
Vertical Stab.
7
27
Wings
34
151
Copyright © 2001-2024 Matronics. All Rights Reserved.