Powered By Kitlog Pro v2.0
Martin's Web Site
RV-7A
Cowl/Spinner/Baffles
Work Logs Found:
12
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
02-02-2020
3.00
Finish Spinner Fore/Aft Mounts
01-26-2020
6.00
Spinner alignment and match drilling
07-21-2019
8.00
Inlet Ducts and Oil Filler Door
Details
07-13-2019
6.00
Lower Cowl Nosegear Brace
Details
07-04-2019
4.00
Fit and drill side hinges
Details
06-30-2019
7.00
Lower Cowl drilling
Details
06-22-2019
3.50
Lower Cowl Fitting
Details
06-22-2019
2.00
Fitting the upper cowl
Details
06-20-2019
2.00
Spinner opening prep
Details
06-16-2019
4.00
Firewall side hinge installation
Details
06-15-2019
1.00
Cut oil filler access door into upper cowl
06-08-2019
4.00
Propeller surrogate
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
463
1863
Avionics
11
78
Cowl/Spinner/Baffles
12
50
Electrical
8
152
Empennage
74
208
Engine
17
102
Firewall Forward
7
39
Fuselage
166
634
Hardware
1
6
Landing Gear
21
80
Shop Supplies
2
8
Systems
20
94
Wings
124
412
Copyright © 2001-2024 Matronics. All Rights Reserved.