KitLog pro

Powered By Kitlog Pro v2.0

N444MG
Work Logs Found: 35
Category Work Time: 74 Hours
 Date
Hours
Work Log Summary

Details

 02-02-2020
2.00
Rivet Ruddervator
Details
       

 01-19-2020
4.00
Polished Ruddervator
Details
       

 01-18-2020
1.00
Ruddervator Polish Jig
Details
       

 11-27-2019
1.00
LH RUDDER VATOR HINGE, FITTING
Details
       

 11-27-2019
1.00
LH Drive Plate rivet to Inner Rib
Details
       

 11-23-2019
1.00
RH RUDDERVATOR HINGE
Details
       

 11-23-2019
1.00
LH HINGE FIT, ATTACH
Details
       

 11-19-2019
3.00
RH RUDDERVATOR ASSY - 2ND ATTEMPT
Details
       

 10-13-2019
2.00
Updrilling of LH Elevator and Ribs
Details

 10-12-2019
1.00
Hinge Drilling
Details

 10-08-2019
4.00
LH Elevator Drilling
Details

 10-06-2019
1.00
Cut Piano Hinges
Details

 10-05-2019
2.00
Hinge Drilling
Details

 10-02-2019
1.00
Up Drilled Elevator Ribs RH
Details

 09-29-2019
7.00
Attachment of Ribs to Right Ruddervator - Part 1
Details
       

 09-28-2019
2.00
Trial Fitting of Right Ruddervator to Stab
Details
       

 09-22-2019
2.00
Cut Inside Ruddervator Skip
Details
       

 09-18-2019
1.00
Bend Drive Plates
Details
     

 09-17-2019
3.00
Test Polish of Drive Plates
Details
       

 09-15-2019
5.00
Drive Plate, Root Rib Assy
Details
       

 09-02-2019
2.00
LH Stab Hinge Fitting and Drilling
Details
       

 08-25-2019
2.00
RH Stab Hinge Fitting and Drilling
Details
       

 08-24-2019
2.00
Cut for Length LH & RH Stab Tips
Details
       

 08-23-2019
1.00
First Boo Boo! (LH Stab Rib Crack)
Details
       

 08-19-2019
1.00
Dimpled Rivets on RH & LH Stab
Details
       

 08-18-2019
6.00
LH STAB ASSEMBLY
Details
       

 08-12-2019
0.50
Riveted LH Fwd Spar to Spar Channel
Details
     

 08-11-2019
2.00
Riveting RH Stab
Details
       

 08-10-2019
4.00
Updrilling Skin, First Rivets
Details
     

 08-06-2019
2.00
Right Ruddervator Constuction
Details
       

 08-04-2019
0.50
First Trial Assy
Details
       

 07-31-2019
1.50
Drilling of WIX-T1107R with WIX-T11-02R
Details
       

 07-27-2019
1.00
The BIG BEND
Details
     

 07-21-2019
3.00
Tail Substructure Detail
Details
       

 07-06-2019
1.00
Receipt of Tail Parts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.