Powered By Kitlog Pro v2.0
Ricks Web Site
North Star 6
Fuselage
Work Logs Found:
220
Category Work Time:
741 Hours
Date
Hours
Work Log Summary
Details
12-05-2010
5.50
Covers and nutplates
11-27-2010
3.00
Covers and nutplates
11-26-2010
2.00
covers and nutplates
11-06-2010
5.00
Riveting cover nutplates
10-25-2010
2.00
10101 mods for open tail
10-23-2010
5.00
10101 mods for open tail
03-28-2010
3.00
Continue 10101 modifications
03-27-2010
7.00
10101 covers
Details
03-21-2010
4.00
tailpost cover
Details
03-20-2010
5.50
10102 LH and 10119
Details
03-13-2010
6.50
10102 and LH transition piece
03-06-2010
2.00
10102 covers
01-30-2010
6.50
10119 and 10102 covers
Details
01-27-2010
1.00
Continue w 10119 covers
01-25-2010
2.00
Vert fin leading edge
Details
01-25-2010
1.50
tail cover 10119
Details
01-23-2010
2.50
Vert fin strip
Details
06-28-2009
9.00
Vertical stabiizer strip
Details
06-22-2009
2.00
Stringers and fin
Details
04-20-2009
2.00
plastic slides and stringers
Details
08-17-2008
4.00
Sliding frames
07-28-2008
3.00
Sliding frames
07-27-2008
4.00
Side panels and sliding frames
Details
07-26-2008
5.50
fitting vertical fin
07-19-2008
2.00
10100 standoffs and covers
Details
07-11-2008
5.50
Stringers and tail standoff brackets
Details
07-05-2008
5.00
Upper former
Details
04-12-2008
8.00
Stringers and top former
Details
03-17-2008
6.50
Greenhouse tubing
Details
03-01-2008
2.00
Trim cable and stringers
Details
03-01-2008
2.50
Door channel,brake lines,trim cable
Details
02-27-2008
2.50
Fitting RH door channel
02-23-2008
4.00
Fuel drain mounts
Details
02-20-2008
1.00
Fuel drain mounts
Details
02-19-2008
2.00
deburr various panels
02-18-2008
6.00
Fuel drain blocks and mounts
Details
10-13-2007
7.50
Door channels
Details
06-09-2007
2.00
Door channel and stringer tabs
Details
05-25-2007
2.00
Start installing fuselage side stringers
05-25-2007
3.00
Brake lines and boot cowl
Details
05-19-2007
5.00
Door channel
Details
05-07-2007
2.00
Fuselage stringers
04-25-2007
3.00
Fuselage stringers
04-23-2007
2.00
Fuselage stringers
04-19-2007
4.00
Fabricate brake links
04-11-2007
3.00
brake link length and top stringers
Details
04-06-2007
3.00
Fuselage top stringers
04-04-2007
3.00
Fuselage top stringers
04-02-2007
2.50
Fuselage top stringers
Details
03-30-2007
2.50
Shoulder harness mounts
Details
03-07-2007
3.00
Install brackets Brake cylinder mts ???
03-04-2007
3.00
Brake mounts
03-02-2007
3.00
Brake mounts and rudder cable cover
Details
03-02-2007
1.50
Brake mounts
02-28-2007
3.75
Brake mounts
Details
02-12-2007
3.50
Floor inspection panels
Details
02-09-2007
3.50
Front door channels
Details
02-07-2007
3.25
Door sills and floor inspection covers
Details
02-05-2007
3.00
Rudder tubes and installing center floorboard
02-02-2007
2.50
rudder tubes and rudder springs
Details
01-31-2007
1.75
Work on misalignment of rudder tubes
01-29-2007
3.00
Fairlead sleeve, floorboad, rudder torque tube
Details
01-26-2007
2.00
LH rudder cable
01-10-2007
4.50
cables and cable guards
12-11-2006
2.00
Cable guards
Details
12-08-2006
2.00
Cables in belly
12-06-2006
4.50
cable routing in belly
12-04-2006
1.00
Cable guides
Details
12-01-2006
3.00
Nutplates
11-27-2006
3.00
nutplates and top bulkheads
Details
11-22-2006
3.00
Bulkhead nutplates
11-20-2006
3.50
stringer bulkheads
Details
09-12-2005
5.00
Float corrosion repairs
08-30-2005
1.00
Assemble trim adjuster
08-29-2005
4.00
Finish fuel primer block and make trim handle
08-07-2005
3.00
Rewelding fuselage leaks
08-05-2005
8.00
Rewelding fuselage leaks
08-04-2005
6.00
Tubing updates and leaks at fuselage welds
Details
08-03-2005
4.00
Tail updates
08-02-2005
2.00
Tail updates
07-25-2005
5.00
Tail updates
07-24-2005
2.00
Tail updates
07-23-2005
3.00
Start updates to fuselage tail area
Details
07-23-2005
3.00
Finish lift strut doublers
07-22-2005
1.00
Work on lift strut fittings
07-20-2005
2.00
Work on lift strut fittings
Details
07-20-2005
4.00
Fuel block brackets
Details
07-19-2005
1.50
Modify lift strut fittings
Details
07-19-2005
1.00
finish flap and trim mounts
07-18-2005
2.00
Seat latch pin
Details
07-18-2005
5.50
modify flap and trim mounts
Details
06-01-2005
2.00
Finish tube oiling
06-01-2005
2.00
Continue tube oiling
05-31-2005
5.00
Continue tube oiling
05-30-2005
2.00
Dimple instrument panel arch, start tube oil
Details
05-30-2005
2.50
Chasing threads and drill tabs
Details
05-28-2005
7.00
Continue welding then chase threads
Details
05-27-2005
6.00
Continue with welding mounts
05-26-2005
3.00
Welding various mounts on airframe
05-25-2005
3.00
Trim floorboard and install interior anchors
Details
05-25-2005
2.00
Remove cowling and floors
05-18-2005
3.00
Finish front door bottom skins
05-17-2005
5.00
Front doors-includes fitting transucent skins on b
05-04-2005
4.00
Front doors
05-02-2005
1.50
Pilot side front door
05-01-2005
5.00
Pilot side front door
Details
04-30-2005
3.00
Front door latch mounting
Details
04-29-2005
2.50
Interior Panels
04-28-2005
2.00
Interior Panels
04-28-2005
4.00
Finish LH cargo door & Rivnuts on control surfaces
04-27-2005
6.00
LH cargo door & rivet nutplates on control surface
04-26-2005
6.00
Interior plate and finish dead bolt
Details
04-25-2005
2.00
Dead bolt in cargo door
Details
04-24-2005
4.00
Cargo door skin
04-23-2005
2.00
Mod. RH cargo door hinges
Details
04-18-2005
6.00
Interior panels
04-17-2005
5.00
Interior Panels
04-16-2005
6.00
Interior panels
04-14-2005
5.00
Interior panels
03-23-2005
3.00
Interior panels
03-22-2005
3.50
Interior panels
03-21-2005
7.00
Interior panels
03-20-2005
3.00
Kydex interior panels
03-20-2005
3.00
Cowl braces/remove cowl/inst. floor
Details
03-19-2005
4.00
Work w/PT on ceiling
03-19-2005
2.00
Ceiling panel - Kydex
03-17-2005
4.50
Finish tail feather updates/bag. panels
03-16-2005
3.50
Weld on updates to the tailfeathers
Details
03-15-2005
4.00
Rear baggage panels
Details
03-14-2005
6.50
Finish bushings start baggage panels
Details
03-13-2005
4.00
Firewall bushings various items
Details
03-12-2005
5.00
Spade mounts strut doublers
Details
03-11-2005
2.75
Fit tunnel/fab. elevator spade mount
Details
03-10-2005
5.00
Cowl tunnel final fitting
03-08-2005
8.00
Cowl tunnels
03-07-2005
5.00
Finish lip rework, con't w/tunnel
03-06-2005
2.00
Rework of firewall lip
02-27-2005
1.00
Start rework of firewall lip
02-25-2005
4.00
Cowl Tunnel remove firewall
Details
02-24-2005
2.50
Cowl tunnels
Details
02-23-2005
4.50
Finish cowl panel and assemble
02-21-2005
2.00
Fab. cowl insert
02-20-2005
3.00
Fab. cowl panels
02-19-2005
5.50
Fab. insert and assemble cowl panel
02-17-2005
2.00
Finish bending tool
02-17-2005
6.00
Fab. boot cowl panels
02-16-2005
3.00
Fab. bending brake for tapered bend
Details
02-15-2005
1.50
Fab. cowl panels
02-10-2005
5.00
Fab. cowl panel and cowl insert
Details
02-10-2005
2.00
Build MDF form for side scoop
Details
02-05-2005
1.00
Fab. boot cowl side panel
02-04-2005
4.00
Begin layout &fab. boot cowl side panels
02-03-2005
6.00
Fabricating inst. panel and boot cowl
09-12-2004
2.00
Fab & weld hor. stab. cover tabs
Details
09-11-2004
5.00
Weld on tabs for boot cowl
08-26-2004
1.00
fitting top cowl
08-25-2004
1.00
Fitting top cowl
08-24-2004
0.50
fitting top cowl
08-22-2004
3.00
layout and cutting out top cowl
08-22-2004
2.00
finish cowl rails
08-08-2004
6.00
cowling rails and layout on cowl panels
08-07-2004
9.00
modify panel angle and start cowl rails
07-26-2004
1.50
r & r engine to install firewall
07-25-2004
2.00
firewall lip fab and install
07-24-2004
3.25
fab and install firewall lip
04-24-2004
5.00
install door supports
04-11-2004
5.50
installation of belly stirngers
04-10-2004
5.50
fab door supports & belly stringers
04-04-2004
3.50
fab belly stringers/design door support
Details
04-03-2004
2.50
skylight center support/belly stringers
03-27-2004
6.00
fab, install wing root skylight supports
03-06-2004
4.00
fab wing root skylight supports
02-28-2004
2.00
front skylight tab install & weld
02-22-2004
3.50
front skylight tab installation
02-21-2004
1.00
measure for interior panels
02-15-2004
2.00
fab front skylight tabs
02-14-2004
0.50
fab front skylight tabs
01-31-2004
3.00
fab and fit rear skylight supports
01-31-2004
2.00
design and fab. front skylight tabs
01-18-2004
1.00
fabricating rear skylight support panels
01-17-2004
5.00
make and weld rear skylight tabs
Details
01-10-2004
6.00
weld wing root tabs and windshield tabs
Details
01-10-2004
0.50
test fit. rear skylight support
Details
12-13-2003
3.00
Weld in panel former/chase thds on mount
Details
12-06-2003
0.75
Finish welding float wire fittings
12-06-2003
5.50
Fabricate panel mount/former
Details
11-30-2003
1.75
Shoulder harness mounts and float wire f
Details
11-29-2003
4.50
Ceiling tabs and shoulder harness mounts
11-09-2003
5.00
Welding various mounts and tabs
Details
11-08-2003
5.00
Welding seat belt and sh. harness mts
Details
11-08-2003
1.00
Designing and fab shoulder harness mts
11-02-2003
1.25
welding tie down nuts
11-01-2003
5.50
Build fixture for rotating fuselage
09-10-2003
1.50
Weld seat mounts together
09-07-2003
3.50
Design and machine seat belt mounts
09-06-2003
7.50
Floorboards/Cargo and seat belt anchors
09-06-2003
1.50
Floorboards & locating seat belt anchors
09-04-2003
1.00
Floorboards/Small tie down anchors
Details
09-03-2003
2.50
Floorboards
Details
09-03-2003
1.50
Floorboards
Details
09-02-2003
1.00
Floorboards
09-01-2003
4.50
Floorboards
Details
09-01-2003
6.50
Cargo anchors & floorboards
08-31-2003
5.50
Complete various welding/Start tie downs
Details
08-27-2003
1.00
Fit stiffener to rear window frame
08-25-2003
0.50
Weld doublers to 8222 fittings
08-24-2003
4.75
Weld tabs
Details
08-23-2003
4.50
Make Inst. panel template & weld tabs
08-17-2003
2.50
Start making floorboards - baggage comp.
08-17-2003
1.50
Make cargo tie down anchors
08-17-2003
4.00
Floorboards
Details
08-16-2003
1.00
p/n 8222 float fittings
Details
08-14-2003
1.00
Weld tabs for interior panels
08-13-2003
1.00
Weld tabs for interior panels
08-12-2003
2.00
Weld tabs for interior panels
08-10-2003
1.50
Weld tabs for interior panels
08-07-2003
1.00
Weld tabs for interior panels
08-06-2003
1.00
Weld tabs for interior panels
08-04-2003
1.25
Weld tabs for interior panels
08-03-2003
1.50
Weld tabs for interior panels
SITE NAVIGATION
Contact Builder
S20 Home
North Star 6 Home
Category
# Logs
# Hours
All
294
1688
Brakes
33
112
Engine
8
58
Firewall Forward
16
151
Floats
12
333
Fuselage
220
934
Interior
5
100
Copyright © 2001-2024 Matronics. All Rights Reserved.