Powered By Kitlog Pro v2.0
Ricks Web Site
North Star 6
Brakes
Work Logs Found:
33
Category Work Time:
100 Hours
Date
Hours
Work Log Summary
Details
07-01-2001
1.50
Finish 2nd brake disc modifications
03-19-2001
2.00
Finish 2nd axle shaft
03-18-2001
2.50
Con't fab 2nd axle
03-17-2001
6.75
Start 2nd axle shaft
03-12-2001
1.50
Revise axle installation drawing
03-12-2001
2.50
Finish 1st axle shaft
03-11-2001
5.00
Finish 2nd brake spacer/mod. 2nd hub
Details
03-10-2001
6.50
Finish new caliper brackets
Details
02-18-2001
6.00
Fab. new caliper brackets
02-17-2001
6.50
Rework completed caliper brackets
Details
02-12-2001
1.00
Layout revision to caliper brackets
02-11-2001
4.50
Caliper brackets con't
02-10-2001
1.50
Bending and mach. caliper brackets
02-04-2001
2.00
Finish 2nd hub spacer
02-03-2001
3.50
Start 2nd. hub spacer.
12-18-2000
4.00
Con't work on axle
12-17-2000
7.00
Finish spacer/disc hub mods/axle
Details
12-16-2000
7.00
Continue turning brake spacer
12-15-2000
1.00
fab. brake spacer
12-10-2000
3.75
fab. axle & caliper bracket/start spacer
12-05-2000
1.00
Revise brake bracket bend line
12-03-2000
3.00
Generate axle and caliper bracket g code
12-02-2000
2.00
Start fab. axle and caliper brackets
12-02-2000
2.50
Brake spacer and axle design
11-29-2000
2.00
Axle bracket design con't
11-26-2000
2.00
Axle design con't
11-23-2000
1.00
Caliper Bracket Design
11-20-2000
1.00
Spacer Design
11-19-2000
1.00
Axle design con't
11-17-2000
3.00
Concept Sketch for axle design
Details
11-16-2000
2.00
Axle Bracket Design
Details
11-14-2000
2.00
Start Brake Spacer Design
Details
11-11-2000
2.00
Measure and Sketch Tie Down Brakes
Details
SITE NAVIGATION
Contact Builder
S20 Home
North Star 6 Home
Category
# Logs
# Hours
All
294
1688
Brakes
33
112
Engine
8
58
Firewall Forward
16
151
Floats
12
333
Fuselage
220
934
Interior
5
100
Copyright © 2001-2024 Matronics. All Rights Reserved.