Powered By Kitlog Pro v2.0
Martin's Web Site
RV-7A
Engine
Work Logs Found:
17
Category Work Time:
102 Hours
Date
Hours
Work Log Summary
Details
01-24-2020
1.00
Air Filter Bypass Door Install
Details
12-07-2019
8.00
Install Vetterman Exhaust Pipes
10-12-2019
2.00
Install Engine Oil Cooler
09-01-2019
12.50
Horizontal Induction Install
Details
05-23-2019
15.00
Rework Engine Control Cable brackets
Details
05-18-2019
8.00
Install fuel system components and alternator
Details
05-05-2019
2.00
Install Oil lines
Details
05-04-2019
8.00
P-Mag Wiring
Details
04-27-2019
8.00
Mounted Engine to Airframe
Details
04-21-2019
5.00
Throttle Body Installation
Details
04-19-2019
5.00
Throttle and Mixture Brackets onto Engine Sump
Details
04-06-2019
2.00
Oil line fittings
Details
03-24-2019
1.00
Install Back Up Alternator
Details
03-03-2019
8.00
Prop Governor Installation
Details
02-16-2019
6.00
Engine Dessicant System
Details
02-10-2019
8.00
Uncrate engine
01-21-2019
3.00
Engine Controls installation
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
463
1863
Avionics
11
78
Cowl/Spinner/Baffles
12
50
Electrical
8
152
Empennage
74
208
Engine
17
102
Firewall Forward
7
39
Fuselage
166
634
Hardware
1
6
Landing Gear
21
80
Shop Supplies
2
8
Systems
20
94
Wings
124
412
Copyright © 2001-2024 Matronics. All Rights Reserved.