|
|
|
|
DARREN'S WEB SITE
Work
Logs
Found:
44
|
Category Work Time: 190 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
04-14-2020
|
2.00
|
ALt air door testing
|
Details
|
|
|
04-13-2020
|
4.00
|
Alt air door
|
Details
|
|
|
03-23-2020
|
2.00
|
Prop governor setup, idle set up
|
Details
|
|
|
03-16-2020
|
6.00
|
cowling on, adjusted idle setting, fast taxi tria
|
Details
|
|
|
03-11-2020
|
9.00
|
First engine start
|
Details
|
|
|
02-20-2020
|
2.00
|
Safety wiring
|
Details
|
|
|
01-08-2020
|
4.00
|
Engine compartment bits
|
Details
|
|
|
12-30-2019
|
7.00
|
Baffle seals, prop governot and cables
|
Details
|
|
|
08-18-2019
|
4.00
|
fiinlly fitted the oil shutter and FAB
|
Details
|
|
|
08-17-2019
|
3.00
|
Oil shutter installation and fitting the oil coole
|
Details
|
|
|
08-16-2019
|
2.00
|
Oil cooler shutter fabrication
|
Details
|
|
|
08-11-2019
|
2.00
|
Alt airbox sensor
|
Details
|
|
|
08-07-2019
|
2.00
|
Alternate air gate work
|
Details
|
|
|
07-04-2019
|
3.00
|
Blast tubes
|
Details
|
|
|
07-02-2019
|
2.00
|
wiring and routing changes
|
Details
|
|
|
07-01-2019
|
7.00
|
Cowling /baffles
|
Details
|
|
|
06-30-2019
|
4.00
|
Cowling/baffle seals
|
Details
|
|
|
06-12-2019
|
3.00
|
|
Details
|
|
|
06-10-2019
|
7.00
|
baffles painted and reinstalled
|
Details
|
|
|
06-09-2019
|
7.00
|
Baffle works, then painting
|
Details
|
|
|
06-07-2019
|
4.00
|
baffles...
|
Details
|
|
|
06-06-2019
|
3.00
|
SB baffles
|
Details
|
|
|
06-05-2019
|
8.00
|
Baffle work, and 'snorkel' installed
|
Details
|
|
|
06-01-2019
|
8.00
|
Baffles, oil cooler
|
Details
|
|
|
05-20-2019
|
5.00
|
more wiring and plumbing
|
Details
|
|
|
05-19-2019
|
5.00
|
finished EGT/CHT wiring, more pipework
|
Details
|
|
|
05-18-2019
|
6.00
|
ECT/CHT wiring, tidying up other wiring
|
Details
|
|
|
05-17-2019
|
5.00
|
More oil lines, engine wiring.
|
Details
|
|
|
05-15-2019
|
6.00
|
engine remounting
|
Details
|
|
|
05-13-2019
|
6.00
|
firewall stainless foil and heat barrier installed
|
Details
|
|
|
05-10-2019
|
2.00
|
Breather pipe
|
Details
|
|
|
05-08-2019
|
3.00
|
|
Details
|
|
|
05-07-2019
|
2.00
|
Mixture bracket
|
Details
|
|
|
05-01-2019
|
6.00
|
Stainless oil lines fitted, Mixture bracket fitted
|
Details
|
|
|
04-28-2019
|
6.00
|
Control cables
|
Details
|
|
|
04-27-2019
|
8.00
|
Inverted oil system installation
|
Details
|
|
|
04-24-2019
|
6.00
|
sensors installed
|
Details
|
|
|
04-23-2019
|
3.00
|
Connected the Alternator F leads, backup B lead
|
Details
|
|
|
04-22-2019
|
4.00
|
Wiring the starter and alternators
|
Details
|
|
|
04-17-2019
|
3.00
|
Exhaust fitted
|
Details
|
|
|
04-11-2019
|
2.00
|
Fitted the engine
|
Details
|
|
|
03-10-2019
|
1.00
|
Fitted second alternator
|
Details
|
|
|
03-09-2019
|
3.00
|
Fuel line installation started.
|
Details
|
|
|
03-07-2019
|
3.00
|
Engine unboxed!
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |